Full Order Text
Final Order 1 · 15 Oct 2019 · CNR MHCC010092632019
Order Details: Notice of Motion Pdf Text: 1 NM no. 3389-19 in ST. no.9381-19 IN THE CITY CIVIL COURT FOR GREATER BOMBAY AT MUMBAI. NOTICE OF MOTION NO. 3389 OF 2019 (CNR no. MHCC010092632019) IN STAMP NO. 9381 OF 2019 Prema Ramnath Shetty ] W/o Ramnath Shetty ] Aged : 59 years, Occ. : Business ] Sole Proprietor of Sumeet Bar And Restaurant, ] Tenant in Respect of (I) Shop No.4 (II) Block No.13, ] (III) Blocks No.15 and 16, (IV) Store Room on the ] Front side i.e. premises No.25, Totally admeasuring ] about 1264 sq.ft. Carpet area situated in Uday Building, ] J.N. Road, Opp. Apna Bazar, Mulund (W), ] Mumbai400080. ]....Plaintiff V/s 1. The Municipal Corporation of Gr. Mumbai, ] having their Head office at Mahapalika Bhavan, ] Mahapalika Marg, Fort, Mumbai400 001. ] 2. Designated Officer, ] Office of the Assistant Commissioner ] "T" Ward, Devi Dayal Road, ] Mulund (West), Mumbai400 080. ] 3. Aarav Developers, ] A Partnership Firm, Occ : Landlord, having its ] address at Shop No.2, ‘A’ Wing, Akruti Elegance, ] 90 Feet Road, Gawanpada, ] Mulund (E), Mumbai400081. ] 4. The Assistant Engineer / Designated Officer ] (Building & Factory), T Ward, ] Office of The Assistant Commissioner, ] T Ward, Devi Dayal Road, ] Mulund (W), Mumbai400080. ]....Defendants -- 1 of 6 -- 2 NM no. 3389-19 in ST. no.9381-19 Appearances: Ld. Advocate Mr. Maulik K. Tanna for the Plaintiff. Ld. Advocate Mrs. R. M. Hajare for defendants no. 1, 2 and 4/MCGM. Ld. Advocate Mr. Sagar Joshi for defendant no. 3. CORAM : HIS HONOUR JUDGE SHRI C.V. MARATHE (Court Room no. 8) DATED : 15TH October, 2019 O R A L O R D E R 1. This is an application by Notice of Motion under O.XXXIX R.1 of The Code of Civil Procedure, 1908. 2. In this Notice of Motion, the plaintiff is challenging notice of eviction dated 16.08.2019 under Section 354 of Mumbai Municipal Corporation Act,1888 (hereinafter referred to as "MMC Act") issued by defendant no.2, the Designated Officer of defendant no. 1/MCGM, and he is also seeking stay to the operation of Report of Technical Advisory Committee ( hereinafter ‘TAC’) dated 05.08.2019 which declared the suit building in C1 category. I have carefully gone through the record and heard both sides at length. 3. The instant suit results from the TAC Oder dated 05.08.2019 which was passed pursuant to order of Hon’ble Bombay High Court in A.O. St. No. 11348 of 2019 with C.A. St. No. 11349 of 2019 dated -- 2 of 6 -- 3 NM no. 3389-19 in ST. no.9381-19 19.06.2019. In that matter the order refusing adinterim relief against TAC conclusion, declaring the suit building in C1 category, was challenged. Hon’ble Single Bench of the Bombay High Court discussed the reasons of the TAC for arriving at the conclusion and found the same to be inadequate and interfered with the same by making following observations in paragraphs no. 8, 9, 10 and 11 which reads as under : 8. Heard learned counsel. No doubt the T.A.C. has in the concluding portion of its report records that considering the statements and reports of the both the Structural Engineers, opinion given by the Committee Members, and having gone through the details that the Committee is of the opinion that the structure shall be categorized as C1, but in the earlier part of the report it has expressed certain reservations about the structural auditors reports that have been submitted by both the parties. It is not as if the T.A.C. opined that despite not carrying out the tests as observed by T.A.C., these reports can still be relied upon to categorize the building as C1. 9. No doubt the T.A.C. is not supposed to give detailed reasons. Having regard to the observations made by the T.A.C. and especially in the light of the observations in the report that “none of the Structural Engineers have checked the foundation. It was possible to open foundation on the side of the building to check its status. Also NDT tests could be carried out in the column in foundation. It is very necessary to understand the type of foundation whether it is footing or pile. Normally piles will not be easy to repair, but at least status can be checked. There are no such details worked out in the report for checking strength, durability and serviceability”, the T.A.C. should have opined that it can still proceed on the basis of the reports which are placed on record to come to the finding that the building needs to be cateorised as C1. 10. In this view of the matter, I am of the opinion that the report dated 17.09.2018 of the T.A.C. needs to be interfered with and is accordingly set aside and so also the consecutive notice. -- 3 of 6 -- 4 NM no. 3389-19 in ST. no.9381-19 11. The T.A.C. to proceed from the stage mentioned in directive 1.05. The appellants as well as respondent No.3 to appear before the T.A.C. on 27.06.2019 at 11.00 a.m. Shri Walawalkar, learned Senior Advocate is instructed by Shri C. M. Ghole, Assistant Engineer (Building & Factory Department), ‘T’ Ward to state the date and time when the parties are to appear before the T.A.C. The T.A.C. on the basis of the structural auditors reports and in terms with guideline 1.05 to submit a fresh report within a period of eight weeks from 27.06.2019. After the report is submitted by the T.A.C. the Corporation is free to take appropriate action in accordance with directives and in accordance with law. 4. From the above order, it was expected from the TAC to give emphasis on checking of the foundation and conducting NDT Tests in the columns in foundation. After careful reading of the TAC order dated 05.08.2019, the expert committee has given brief reasons for arriving at its conclusion but there is no whisper about checking of the foundation and/or carrying out NDT Tests in the columns in the foundation. No reasons are given by the TAC for not considering these aspects when the TAC was expressly directed by Hon’ble Bombay High Court in the above matter. Therefore, the order of TAC dated 05.08.2019 needs to be interfered with in view of above observations of Single Bench of Hon’ble Bombay High court in the matter. Hence, following order : ORDER 1. Notice of Motion No. 3389 of 2019 is partly allowed. 2. The TAC shall convene meeting in presence of structural auditors of both contesting parties and discuss the issues highlighted in the order dated 19.06.2019 in A.O.(St.) No.11348 of 2019 as mentioned in the earlier paragraph of this order. -- 4 of 6 -- 5 NM no. 3389-19 in ST. no.9381-19 3. If the TAC comes to the conclusion that the NDT Tests in the columns in foundation are not possible, brief reasons therefor be assigned and the TAC will be free to take its decision independently and submit fresh report within a period of four weeks from today. 4. After the report is submitted by the TAC, defendant no. 1/MCGM will be free to take appropriate action in accordance with the directives and in accordance with the law. 5. Costs in cause. sd/ (C. V. Marathe) Judge, Date : 15.10.2019 City Civil Court, Gr. Mumbai. Dictated on : 15.10.2019 Transcribed on : 15.10.2019 Signed by HHJ on : 16.10.2019 -- 5 of 6 -- 6 NM no. 3389-19 in ST. no.9381-19 CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL SIGNED JUDGMENT/ORDER.” UPLOAD DATE AND TIME : 17.10.2019 at 5.40 p.m. NAME OF STENOGRAPHER : Mrs. Gayatri P. Acharekar Name of the Judge (With Court Room no.) HHJ Shri. C. V. Marathe C.R. no.08 Date of Pronouncement of JUDGMENT/ORDER 15/10/2019 JUDGMENT/ORDER signed by P.O. on 16/10/2019 JUDGMENT/ORDER uploaded on 17/10/2019 -- 6 of 6 --
