Full Order Text
Interim Order 4 · 22 Sept 2026 · CNR DLET030000502026
Order Details: COPY OF ORDER Pdf Text: -Page 1 of 6- 19 Civ Suit 31/26 SUJATHA SHIROLKAR Vs. SATISH KUMAR GARG CNR No.DLET030000502026 22.09.2026 Present: Ms. Nimisha Gupta, Ld. Counsel for the plaintiff through VC. Sh. Nirmal Tiwari, Ld. Counsel for the defendant No.1 and 2. Sh. Abhishek Sharma Ld. Counsel for defendant No. 3 and 5/ MCD through VC. Sh. Utkarsh Sharma, Ld. Counsel for defendant No.4/ DDA through VC. Some more time is sought by ld. counsel for MCD for filing the status report on the ground that reply from the Department of Maintenance Division and Horticulture Department has not been received till date. Ld. Counsel for the plaintiff submits that the application under Order XXXIX Rule 1 and 2 CPC cannot be kept pending merely on account of non-filing of the status report. It is further submitted that the status report is not being filed because the MCD is hand in glove with defendant No.1. In the opinion of this Court, submissions made by ld counsel for the plaintiff have merit. The plaintiff is required to independently establish the ingredients required for grant of interim injunction. The status report, when filed, can only aid the court in appreciating the matter but cannot relieve the plaintiff of the onus placed upon her. Arguments have been heard on the interim application under Order XXXIX Rule 1 and 2 CPC. Be put up for orders at 04:00 PM. (Dr. Saema Jain) JSCC-cum-ASCJ-cum-Guardian Judge East/KKD Courts/Delhi 22.09.2026 -- 1 of 6 -- -Page 2 of 6- At 04:00 PM Present: None. 1. Vide this order, application under Order XXXIX Rule 1 and 2 read with Section 151 CPC filed by the plaintiff shall be adjudicated. 2. Arguments heard. Record perused. 3. By way of the present application, the plaintiff seeks interim injunction against defendant no.1 restraining him from raising, carrying out or continuing any illegal or unauthorized construction, alteration or addition in property bearing No.171-B, Pocket-4, Mayur Vihar Phase-I, New Delhi-110091. The plaintiff further seeks restraint against defendant No.1 from encroaching upon, fencing, occupying or otherwise illegally appropriating the adjacent MCD park and common road/street, or converting the same into a private courtyard, garden, access or any other structure for his exclusive use. The plaintiff has also sought injunction against defendant no.1 restraining him from obstructing or interfering with the plaintiff in carrying out necessary repair, maintenance and safety-related works in her property bearing No.171-H, Pocket-4, Mayur Vihar Phase-I and from obstructing her use of the parking area stated to be situated on the roadside adjacent to the said property. 4. The case of the plaintiff, as pleaded in the plaint, is that she is the owner and and in possession of the third floor of property bearing No.171-H, Pocket-4, Mayur Vihar Phase-I. Defendant no.1 is stated to be the owner of the ground floor of property bearing No.171-B, Pocket-4, Mayur Vihar Phase-I. It is alleged that defendant No.1 has unlawfully demolished a portion of the compound wall, erected an iron gate, raised boundary enclosures and carried out other -- 2 of 6 -- -Page 3 of 6- constructions. It is further alleged that defendant no.1 has encroached upon the MCD park situated at the rear side of his flat and installed a gate and a semi-permanent concrete shed at the park in order to restrict access of the other residents to the said park. It is also alleged that defendant no.1 obstructed the repair work being carried out by the plaintiff in her own property and that defendant No.1 and 2 illegally obstructed the plaintiff and other occupants from parking their cars alongside the road adjacent to the block. 5. In support of the present application, the plaintiff has relied upon photographs of the alleged illegal constructions, screenshots of complaints lodged by the plaintiff and her husband with the MCD and a copy of the complaint lodged by the plaintiff against defendant no.1 before the concerned police station regarding the alleged obstruction to the repair work and the alleged abusive conduct of defendant no.1. 6. At the outset, it is pertinent to note that, at this stage, this Court is not required to finally determine whether the constructions complained of are illegal and whether they infringe upon any rights of the plaintiff. That question would only be decided after evidence has been led by the parties. However, the plaintiff is nevertheless required to place sufficient material on record to establish, at least prima facie, the right sought to be protected and the alleged infringement thereof. 7. In the present case, the pleadings themselves do not disclose that defendant no.1 is presently carrying out any construction. The construction complained of is described in the plaint as an act which defendant no.1 “has” already carried out. The plaintiff refers to the demolition of a portion of the compound wall, erection of the iron gate, construction of boundary enclosures, installation of the gate and -- 3 of 6 -- -Page 4 of 6- putting up of the semi-permanent concrete shed. The allegations made, therefore, principally concern constructions and alterations which have already taken place. 8. Furthermore, during the course of arguments, ld. counsel for the plaintiff was specifically asked as to whether the construction complained of is still ongoing. Ld. counsel, in response, fairly conceded that she is not aware whether defendant no.1 is presently carrying out any construction or whether the construction complained of has already been completed. 9. The submission made assumes significance, particularly, while considering an application under Order XXXIX Rule 1 and 2 CPC. The said provision is intended to protect the plaintiff against a threatened injury where the circumstances justify immediate intervention. The aim of the provision is to ensure immediate protection where delay would cause irreparable harm to the plaintiff which cannot be compensated in monetary terms. 10. In the present case, when the plaint does not specifically aver that the alleged illegal construction is continuing and when the ld. counsel for the plaintiff is unable even during the arguments to clarify whether any construction is presently being carried out, this Court cannot proceed on an assumption that there is a continuing or imminent threat of illegal construction by defendant no. 1 requiring immediate restraint. Furthermore, the fact that no light could be shed by the plaintiff regarding any construction being carried out by defendant no. 1 as on date demonstrates that there is no present urgency warranting interim protection. -- 4 of 6 -- -Page 5 of 6- 11. As regards the alleged obstruction to the repair work, the pleadings are vague. The plaintiff has merely stated that defendant no.1 illegally obstructed the repair work being carried out by her in her property. The plaint does not disclose what kind of repair work was being carried out or on which particular portion of the property in question. It also does not disclose the nature of the alleged obstruction, or material particulars like date and time of the alleged obstruction. Thus, in the facts pleaded, there is no ground warranting an injunction under Order XXXIX Rule 1 and 2 CPC. 12. Likewise, with respect to the alleged roadside parking area, no material has been placed on record to establish the plaintiff’s legally enforceable right over the particular area claimed as a parking space. Therefore, without the plaintiff prima facie establishing her legal right, no interim injunction can be granted in her favour with respect to the alleged parking area. 13. In view of the foregoing discussion, the plaintiff has failed to establish the requisite prima facie case for grant of the interim reliefs sought. The material on record also does not demonstrate any present or imminent threat warranting a temporary injunction in favour of the plaintiff. 14. The application under Order XXXIX Rule 1 and 2 read with Section 151 CPC is accordingly dismissed. 15. It is clarified that this order shall have no bearing on the merits of the case. -- 5 of 6 -- -Page 6 of 6- 16. Be put up for further proceedings on 13.01.2027. (Dr. Saema Jain) JSCC-cum-ASCJ-cum-Guardian Judge East/KKD Courts/Delhi 22.09.2026 -- 6 of 6 --