Full Order Text
Order 5 · 18 Aug 2025 · CNR MHSCA30012572022
Order Details: Order on Exhibit Pdf Text: 1 CNR NO.MHSCA-30012572022 IN THE COURT OF SMALL CAUSES AT MUMBAI (BANDRA BRANCH) ORDER BELOW EXHIBIT NO.24 IN R.A.E. SUIT NO.24 OF 2023 M/s. Mittal Estate . . Plaintiff. Versus 1. M/S Exotica and anr. . . Defendants. Coram : A.S. Pandagle, Judge C.R.No.37 Date : 18/8/2025. ORAL ORDER : 1. By way of this application defendant No.1 seeking relief pending the hearing and final disposal of the suit, the plaintiff be directed to carry out repairs to the suit premises as per the report issued by Structural Engineer within such time as this Court deems fit and proper under the supervision of his structural engineer. Also seeking relief in case the plaintiff fails to carry out necessary repairs as per defendants’ structural engineer within such time as this Court deems fit and proper then the defendant No.1 be allowed to carry out the repairs and deduct the expenses of such repairs from the rent payable in accordance with Section 14(2) of the Maharashtra Rent Control Act, 1999. Further the plaintiff be restrained by an order of injunction from obstructing the defendant No.1, their servants, workers and agents in carrying out repairs to the suit premises. /home/steno37/ASP/Order/Aug-25/E-24-RAE-24-2023 (carry out repairs).odt -- 1 of 10 -- 2 2. By filing present application it is contended by the defendant No.1 that it is the statutory responsibility of the landlord to carry out tenantable repairs to the premises let out by them. The suit premises are situated just below the terrace of the building. The overhead water tank of the suit building is installed on the terrace very near the roof of the suit premises, which overflows on numerous occasions. There has been heavy leakage and seepage of water into the suit premises, especially during monsoon, which has resulted in portions of the plaster of the ceiling slab and external walls of the suit premises crumbling and falling down. This has resulted in a great risk to the life and limb of the occupants of the suit premises. The defendant has repeatedly requested the alleged co-owners of the suit property to carry out tenantable repairs to make the suit premises habitable. Messages have been sent by whats app to Mr. Ramesh Mittal who is claiming to be one of the co-owner of the suit property on 24/8/2020. The advocate for one of the alleged co- owners Mr. Ramesh Mittal had issued a letter dated 10/2/2021 to the defendant for which the defendant had sent reply dated 16/3/2021 to the advocate for one of the co-owners Mr. Ramesh Mittal. In the said reply dated 16/3/2021 it is clearly pointed out that the landlords have failed and neglected to maintain the suit premises in good condition, which was in violation of Section 14 of the Maharashtra Rent Control Act, 1999. It is further pointed out that despite repeated pleas for two years, repairs were not carried out to prevent leakage from the roof into the suit premises. This resulted in serious danger to the occupants of the suit premises. It is further contended that the plaintiffs have failed and neglected to carry out the repairs to the suit premises. The defendant had warned the alleged co-owners that the defendant No.1 would take up the /home/steno37/ASP/Order/Aug-25/E-24-RAE-24-2023 (carry out repairs).odt -- 2 of 10 -- 3 matter in MCGM and MCGM would prosecute the plaintiffs for not carrying out tenantable repairs to the suit premises. As a counter blast to the said warning the plaintiffs have filed this suit on false and concocted grounds. The defendants have obtained a report of Structural Engineer ‘Konstruct Engineers’, wherein they have given the opinion that, major structural and allied repairs are required to be carried out immediately on urgent basis. 3. It is further contended that it is the duty of the landlord of the building that is over 30 years old to submit a structural stability certificate under Section 353B of the MMC Act, 1888. The defendant No.1 filed an application dated 12/4/2023 under RTI Act to obtain certificate that is statutorily required to be submitted by the landlord. The defendant No.1 has received reply from MCGM dated 16/5/2023 informing the defendant No.1 that no such report was submitted by the plaintiffs. 4. It is further contended that the plaintiffs have miserably failed in their statutory duty of repairing the suit premises. The plaintiffs have exposed the defendants to great risk of loss of life, limb and property. Inspite of repeated request made to the plaintiffs and after furnishing copy of report of structural engineer, the plaintiffs failed and neglected to carry out tenantable repairs to the suit premises. After filing the written statement the defendant No.1 have obtained and estimate prepared by their structural engineer for the said urgent tenantable repair works that are required to be carried out. By advocate’s letter dated 2/8/2023 the defendant No.1 had again pointed out various tenantable repairs required to be carried out in the suit premises and also furnished the copy of the said estimate prepared by his structural engineer for carrying out the /home/steno37/ASP/Order/Aug-25/E-24-RAE-24-2023 (carry out repairs).odt -- 3 of 10 -- 4 said repairs. Inspite of receipt of the said letter, plaintiff failed to carry out tenantable repairs to the suit premises. 5. It is further contended that the defendant No.1 has never carried out any structural additions and/or alterations in the suit premises at all and the suit premises was let out to the defendant No.1 in the same structural lay out as it exist today, save and except that the suit premises has deteriorated over a period of time on account of failure of the plaintiffs to carry out tenantable repairs despite several requests made by the defendant No.1. The failure on the part of the plaintiffs has resulted in a grave risk to the life and limb of the occupants of the suit premises. Inspite of correspondence, the plaintiff is neither carrying out the repairs to the suit premises nor allowing the defendant No.1 to carry out the tenantable repairs to the various portion of the suit premises. Therefore it is necessary and expedient that the plaintiffs be directed to carry out repairs to the suit premises as per the report issued by Structural Engineer and failing which the defendant No.1 be allowed to carry out the repairs to the suit premises as suggested by the said Structural Engineer and deduct the expenses of such repairs from the rent payable in accordance with Section 14(2) of the Maharashtra Rent Control Act, 1999, and also seeking relief of temporary injunction, the plaintiffs be restrained by an order and injunction from obstructing the defendant No.1, their servants, workers and agents in carrying out repairs to the suit premises. 6. On the other hand, plaintiffs by filing reply below Exh.31 resisted the application and contended that application is not maintainable, there is no prima facie case has been made out by the defendants for grant of reliefs as prayed. The plaintiff denies that /home/steno37/ASP/Order/Aug-25/E-24-RAE-24-2023 (carry out repairs).odt -- 4 of 10 -- 5 the suit premises requires urgent tenantable repairs and that the said defendant No.1 is receiving rent bills wherein exorbitant amounts are being demanded without any justification as alleged in the said. The plaintiff denies that the plaintiffs are not maintaining and/or repairing the property as alleged. The plaintiff denies that as the said defendant was objecting to exorbitant demands made without carrying out tenantable repairs to the building as alleged. It is submitted by the plaintiff that as the suit premises was locked and unused for more than six months prior to filing of the suit, the bills could not be issued to the defendants. It is denied by the plaintiffs that the suit has been filed to harass and pressurize the defendants to extort large amount as a rent, maintenance charges and permitted increases as alleged. It is further submitted by the plaintiffs that the said water tank is there on the terrace since long. The plaintiff denies that the roof of the suit premises which overflows on numerous occasions as alleged. The plaintiffs also denies that there has been leakage and seepage of water into the suit premises especially during monsoon, which has resulted in portion of the plaster of ceiling slab and external walls of the suit premises crumbling and falling down as alleged. The plaintiff also denies of any alleged risk to the life and limb of the occupants of the suit premises. The plaintiffs denies of any alleged requests by the defendants to carry out tenantable repairs to make the suit premises. It is contended by the plaintiffs that on the contrary it is the defendants is not allowing the plaintiffs to inspect the suit premises despite their repeated requests they have by their advocate’s letter dated 8/7/2024 asked for inspection of the suit premises as per Section 28 of the Maharashtra Rent Control Act, 1999. After the inspection, the plaintiff will file detailed reply to this application. The /home/steno37/ASP/Order/Aug-25/E-24-RAE-24-2023 (carry out repairs).odt -- 5 of 10 -- 6 defendant with malafide intention did not annex letter dated 10/2/2021. It is contended by the plaintiffs that the report of Structural Engineer is not correct. The plaintiff is not admitting the report of alleged estimate prepared by the structural engineer for the alleged urgent tenantable repair works that are required to be carried out. It is denied by the plaintiffs that the defendant No.1 has never carried out any structural additions and/or alterations in the suit premises at all and the suit premises was let out to the defendant No.1 in the same structural lay out as it exist today save and except that the suit premises has deteriorated over a period of time on account of failure of the plaintiffs to carry out tenantable repairs despite of several requests made by defendant No.1. 7. It is further contended by the plaintiffs that under the guise of repairs the defendant wants to carry out additions and alterations of permanent nature to the suit premises by which it will cause damage to the suit building and other galas. If the reliefs as prayed for is granted, than more harm, prejudice and loss will be caused to the plaintiffs which cannot be compensated in terms of money. There is balance of convenience in favour of the plaintiffs, the defendant has not made out any case for grant of reliefs as prayed for. Therefore the application taken out by the defendant No.1 may be dismissed with costs. 8. The defendant No.1 by filing affidavit-in-rejoinder repeated, reiterated and confirmed whatever stated in his application and deny all that is contrary to and inconsistent therein and contended that he repeatedly requested the plaintiff to carry out tenantable repairs in the suit premises. 9. From rival contentions of both the parties, following /home/steno37/ASP/Order/Aug-25/E-24-RAE-24-2023 (carry out repairs).odt -- 6 of 10 -- 7 points arises for my determination and I have recorded my findings thereon with reasons are as under : Sr.No. Points : Findings : 1. Does the defendant No.1 prove that it has made out prima facie case in its favour ? . . In the negative. 2. Does the defendant No.1 prove that irreparable loss would be caused to it in case injunction is refused ? . . In the negative. 3. Does the defendant No.1 prove that balance of convenience lies in its favour ? . . In the negative. 4. Is the defendant No.1 entitled for carrying out repairs to the suit premises ? . . In the affirmative. 5. What order ? .. As per final order. : R E A S O N S : AS TO POINTS NO.1 TO 4 :- 10. Heard both sides. 11. By way of this application it is alleged by the defendant No.1 that the plaintiffs are recovering exorbitant amount, the rent amount increased continuously with every passing year without carrying out tenantable repairs to the suit premises, it is the statutory responsibility of the landlord to carry out tenantable repairs to the suit premises let out by them, the suit premises just below the terrace of the building, the overhead water tank of the suit building is installed on the terrace very near to the roof of the suit premises, /home/steno37/ASP/Order/Aug-25/E-24-RAE-24-2023 (carry out repairs).odt -- 7 of 10 -- 8 which overflows on numerous occasions and therefore there has been heavy leakage and seepage of water in the suit premises, especially during monsoon which has resulted in portions of the plaster of the ceiling slab and external wall of the suit premises crumbling and falling down, this has resulted in a great risk to the life and limb of the occupants of the suit premises. It is further contended by the defendant No.1 that by letter dated 10/2/2021 the defendant through advocate pointed out this fact but repairs were not carried out to prevent leakage from the roof into the suit premises. It is further contended by the defendant No.1 that inspite of again and again pointing out various tenantable repairs required to be carried out in the suit premises, the plaintiff failed to carry out tenantable repairs to the suit premises. Alongwith this application, the defendant No.1 filed copy of letter dated 2/8/2023 indicating that by way of the said letter the defendant No.1 requested towards the plaintiff tenantable repairs are required to be carried out urgently to the suit premises. Even after service of notice, the plaintiff failed to carry out tenantable repairs to the suit premises. Alongwith written statement the defendant placed on record the structural audit report of Konstruct Engineers which clearly indicates the condition of the suit premises, the suit premises required external and internal structural repair work. As per the provisions of Section 14 of the Maharashtra Rent Control Act, 1999, it is the duty of the landlord to keep the premises in good repair, every landlord shall be bound to keep the premises in good and tenantable repairs. The photographs filed alongwith written statement prima facie shows that part of the ceiling plaster has fallen. The photographs itself prima facie shows that the suit premises requires tenantable repairs. By way of this application the defendant No.1 seeking injunction /home/steno37/ASP/Order/Aug-25/E-24-RAE-24-2023 (carry out repairs).odt -- 8 of 10 -- 9 against the plaintiffs that the plaintiff be restrained by an order and injunction from obstructing the defendant No.1, their servants, workers and agents in carrying out repairs to the suit premises. The present suit is filed by the plaintiffs against the defendants for eviction on the ground of subletting, non user, additions and alterations of permanent nature, bonafide requirement of the suit premises. There is one of the ground of additions and alterations of permanent nature. If the injunction as prayed for is granted and at the time of carrying out the tenantable repairs, the defendant No.1 will make additions and alterations of permanent nature in the suit premises, in such circumstances, definitely the plaintiff will suffer. Therefore, I answered Point No.1 to 3 in the negative and Point No.4 in the affirmative and in answer to Point No.5, I proceed to pass following order. ORDER 1. Application is partly allowed. 2. Pending the hearing and final disposal of the suit, the plaintiff is hereby directed to carry out repairs to the suit premises as per the report issued by Structural Engineer of defendant, within period of 3 months under the supervision of Structural Engineer. 3. Before carrying out necessary repairs to the suit building, the plaintiff is directed to furnish the name and address of the Structural Engineer who will carry out the said repairs. 4. If the plaintiff fails to carry out necessary repairs as per the report of Structural Engineer of defendant within 3 months, then the defendant No.1 is allowed to carry out /home/steno37/ASP/Order/Aug-25/E-24-RAE-24-2023 (carry out repairs).odt -- 9 of 10 -- 10 repairs and deduct the expenses of such repairs from the rate payable in accordance with Section 14(2) of the Maharashtra Rent Control Act, 1999. Bandra - Mumbai. ( A.S. Pandagle ) Date : 18/8/2025. Judge, C.R.No.37. . /home/steno37/ASP/Order/Aug-25/E-24-RAE-24-2023 (carry out repairs).odt -- 10 of 10 --
