Full Order Text
Interim Order 3 · 04 Oct 2023 · CNR MHSCA30001882023
Order Details: Order on Exhibit Pdf Text: : 1 : IN THE COURT OF SMALL CAUSES AT MUMBAI (Bandra Branch) ORDER BELOW EXHIBIT – 11 in L.E. & C. Suit No. 16 of 2023 [ CNR NO. MHSCA-3000188-2023 ] 1. Mr. Alok Yudhister Nangia & Anr. … Plaintiffs Versus Mr. Vishal B. Sonawane … Defendant Jikesh M. Shah,Ld. Advocate for the Plaintiffs. A.A. Mirza & Associates, Ld. Advocate for the Defendant. Coram : Smt. Nutan S. Saraf Judge, C.R. No. 40, Date : 04th October, 2023 :: ORDER :: This is an application filed by plaintiffs under order XXXIX, Rule 1 and 2 of Code of Civil Procedure, 1908 for grant of injunction, pay and/or deposit arrears of compensation from 15/01/2021 till 15/03/2023 aggregating to Rs.1,40,00,000/- and to pay and/or deposit in this court the arrears of compensation @ Rs. 7,00,000/- per months from 15/03/2023 till the final decision in the present suit by defendant and appointment of Court Receiver under order XL, Rule 1 of Code of Civil Procedure, 1908 against the defendant. The facts narrated in the application are as below : 2. Plaintiff has filed suit for eviction and compensation with regard to the license allegedly granted in favour of the defendant. It is -- 1 of 22 -- : 2 : contention of the plaintiffs that Leave and License Agreement was entered in respect of commercial premises viz. Tenement No.B-39/156, situated at Siddha Co. Housing Society Ltd., Siddharth Nagar, Goregaon West, Mumbai 400 104 admeasuring 2000 sq.ft on the ground floor and 2000 sq.ft on the first floor between plaintiffs and defendant. The same is the subject matter of the present suit, therefore, it is termed as 'suit premises'. The plaintiffs have submitted that leave and license agreement dated 19/01/2021 which commenced from 15/01/2021 and expired in 14/01/2022 has expired long back and also terminated to avoid any technical hitch by their advocates Notice dated 25/07/2022. After the issuance of termination notice dated 25/07/2022 and rejoinder letter dated 30/08/2022 and filing of the affidavit in reply in notice of motion taken out by defendant in SC Suit No.1588 of 2022, the defendant approached the plaintiffs and requested to grant him four months time i.e. November-December 2022 to vacate the suit premises and to clear all the outstanding dues. In order to avoid expensive litigation and in order to settle the dispute amicably with the not filed the suit after the issuance of termination notice believing the assurance given by the defendant. 3. The plaintiffs further stated that the defendant surreptitiously filed L.D. Suit No.152 of 2022 which is pending in this Hon’ble Court and also have taken out injunction application for obtaining ad interim and interim reliefs to be used against him as an arm-twisting tactics. The defendant has not approached this court with clean hands and is guilty of playing fraud on this Hon’ble Court as well as on plaintiffs. The defendant is guilty of suppressing various material facts and documents from this court in the suit filed by the defendant. The plaintiffs further stated that defendant is in arrears of monthly -- 2 of 22 -- : 3 : compensation as agreed in the leave and license agreement dated 19/01/2021 from 15/01/2021 till 14/01/2022 @ Rs.3,50,000/- per month X 12 months = Rs.42,00,000/- and from 15/01/2022 to 15/03/2023 i.e. 14 months @ Rs.7,00,000/- as per clause No.18 of the registered leave and license agreement dated 19/01/2021 which comes to Rs.98,00,000/- and in all aggregating to Rs.1,40,00,000/- (One Crores Forty Lakhs only). The defendant has always kept plaintiffs on false assurances and has avoided to make the payment of license fees as and when the same the due and payable. The leave and license agreement dated 19/01/2021 has expired by efflux of time on 14/01/2022 and thereafter the defendant is liable to pay double the compensation amount if he fails to vacate the suit premises. Therefore, plaintiffs are entitled to recover double the compensation from 15/01/2022 till the defendant handovers quite, vacant and peaceful possession of the suit premises as per the terms and condition of the registered leave and license agreement dated 19/01/2021. The defendant has not only made payment of license fees but has also defaulted in payment of amount to Adani Energy Pvt. Ltd. for electricity consumed at the suit premises by the defendant. 4. It is further pleaded that looking to the conduct of the defendant in past where not only the defendant has flouted the terms and conditions of the leave and license agreement entered into with plaintiffs but has also been involved in other criminal activities, and in light of the threat issued by the defendant in past that he is the member of some political group known as Tiger group and will do whatever is required to be done to retain the possession of the suit premises, plaintiffs felt that after getting knowledge about the present suit, the defendant might induct some third party or create some third party -- 3 of 22 -- : 4 : rights in respect of the suit premises. Therefore, prayed that it is just and necessary in the interest of justice and equity to appoint the registrar of this Hon’ble Court as the court receiver to take possession of the suit premises and to exercise all the power as provided under law to maintain and safe guard the suit premises and our rights in respect of the suit premises. The plaintiffs further prayed that it is just and necessary in the interest of justice and equity to restrain the defendant, his agents, servants, representatives by an order of injunction from letting, underletting, subletting, giving on leave and license basis or creating third party rights in respect of the suit premises or part thereof during the pendency of the suit. They also prayed that this court may pleased to pass and order directing the defendant to pay Rs.1,40,00,000/- towards the arrears of compensation and to continue to pay Rs.7,00,000/- per month as agreed in clause No.18 of leave and license agreement dated 19/01/2021 during the pendency of the suit. If the reliefs as prayed are granted no harm and prejudice would be caused to the defendant. Hence, this application. 5. The defendant has appeared and filed reply below Exh.15. 6. It is contention of the defendant that suit filed by the plaintiffs and injunction notice taken out therein is false, frivolous and vexatious and not maintainable as the suit filed by the plaintiffs is pre- matured and has been filed without any cause of action. In the year 2020, defendant and his friend Bhushan R. Jagdale was decided to start Gym and was looking for suitable premises on a leave and license basis in the Goregaon area. The premises bearing Tenement No.B-39/156, Siddharth Co-operative Housing Society Ltd., Siddharth Nagar, Goregaon (W), Mumbai-400104, was owned by the plaintiffs and the -- 4 of 22 -- : 5 : said premises were in very bad condition. Defendant alongwith his friend Bhushan Jagdale, negotiated with the plaintiffs and they have agreed to give the said premises on leave and license basis under the condition that the defendant renovated and decorated the said licensed premises and the cost whatever incurred would be deducted from the agreed monthly compensation. On 9th November, 2020, leave and license agreement came to be entered into between the plaintiffs and defendant and his friend also made as co-licensee alongwith the defendant herein. The said leave and license agreement was duly registered with the office of Sub-Registrar of Assurances Borivali No.1. After acquiring the said premises on leave and license basis, defendant carried out renovation and decoration interior and exterior to the licensed premises and have incurred huge expenses more than Seventy Five Lakhs. The photographs of the licensed premises are self- explanatory as to how much defendant spend money on the renovation and decoration of the licensed premises. The said photographs of the licensed premises are annexed and marked as Exhibit ‘A’ collectively with the application. 7. It is further contended that leave and license agreement was executed on 9th November, 2020 and thereafter renovation work was carried out which lasted for two months and by end of the January, 2021, however due to pandemic Covid-19, the local police have not permitted the defendant to start Gym from the licensed premises, therefore, he could not start the Gym till the end of the December, 2021. The said fact were well aware by the plaintiffs and they have assured that they will give concession in making payment of the agreed compensation of the licensed premises. The defendant purchased expensive instruments which had been installed in the licensed -- 5 of 22 -- : 6 : premises however due to Covid-10, the Gym was could not get momentum as customers were not coming. On 19th January, 2021, defendant was sitting in the licensed premises, plaintiff no.1 called him to the office of Sub-Registrar Borivali 1. The defendant went over there and believing the plaintiffs and without reading the contents thereof, he signed the leave and license agreement as he was told by the plaintiffs that this agreement is in respect of the first floor of the said premises and the conditions are the same as well as the monthly compensation is also same and the period is mentioned as 36 months. Believing the plaintiffs the defendant without reading the contents thereof have signed the leave and license agreement dated 19th January, 2021. In the month of February, 2022, he started Gym Business as the Covid-19, was ended and the local police permitted him to operate and/or start Gym business. He paid the sum of Rs.55,42,300/- (rupees Fifty Five Lakhs Forty Two Thousand Three Hundred only) either in cash or via UPI to the plaintiffs and the said amount was taken by plaintiffs either in their accounts or in the account of their persons, relatives and daughter. He has maintained the diary wherein the Cash amount paid to the plaintiffs is noted. Defendant further submitted that he would be produce the records which transferred via UPI as well as said diary record. It is admitted by the defendant that leave and license agreement dated 19th January, 2021 executed between the plaintiffs and him which commenced from 15th January, 2021 but not expired by 14th January, 2022. The said leave and license agreement was for the period of 36 months. Therefore, defendant denied that said leave and license agreement expired by 14th January, 2022 and by notice dated 25th July, 2022, the plaintiffs have terminated the said leave and license agreement. -- 6 of 22 -- : 7 : 8. The defendant contended that due to Covid-19 situation he is unable to run his Gym business. Therefore, prayed to dismiss the injunction application of plaintiffs. 9. The plaintiff no. 1 has filed rejoinder to the reply vide Exh.16 and denied the contentions of the defendant in toto. Plaintiffs denied that leave and license agreement dated 19/01/2021 has not expired by 14/01/2022 and put the defendant to strick proof thereof. They denied that leave and license agreement dated 19/01/2021 was a period of 36 months and crave leave to refer to and rely upon the pleadings in the plaint about the typographical error. It is further denied that defendant has paid any cash or transferred any amount for the license fees/compensation via UPI and put the defendant to the strict proof thereof. It is submitted by the plaintiffs that defendant is not just in arrears of compensation fee but is also in default for non payment of electricity consumed by him in the suit premises. The plaintiffs have been getting alters and notifications from the Adani Energy Pvt. Ltd. For the outstanding payment reminders. On many occasions the cheque issued by the defendant to Adani Energy Pvt. Ltd. Have been dishonoured and even the electricity connection is cut off. All these thing as visible from the snap shots taken by plaintiff of the alters and notifications received by him on his phone from Adani Energy Pvt. Ltd. Therefore, plaintiffs had addressed letter dated 26/07/2022 to the Chief Officer of the Adani Electricity Mumbai Ltd regarding the non payment of outstanding bills by the defendant and therefore to disconnect the meter. The defendant is in illegal use and occupation of the suit premises and is also no ready to pay outstanding electricity bills which he has agreed to pay as per the leave and license agreement dated 19/01/2021 and he is even not ready to pay his -- 7 of 22 -- : 8 : arrears of compensation/license fees and is interested in illegally retaining the suit premises free of charge. Plaintiffs crave leave to refer to and rely on the statements, bills, notice dated 26/07/2022 and messages issued by the Adani Electricity Ltd. Hence, prayed it is just and necessary that application of the plaintiffs be allowed. 10. The plaintiff no.1 filed additional affidavit in rejoinder vide Exh.20 and stated that at the outset, the documents produced on 21/06/2023 by the defendant with malafide intention and ulterior motive to throw dust in the eyes of this Hon’ble court and to show that defendant has made alleged payment towards license fees. The defendant has produced incomplete documents with malafide intention and ulterior motive to suppress all the entire. The defendant had requested to the plaintiffs for friendly loan of Rs.6,00,000/- to enable him to carry on his business in the suit premises smoothly, and looking to the impact of the Covid-19 lockdown on humanitarian grounds plaintiffs had agreed to advance loan to the defendant. On humanitarian grounds plaintiffs have advanced the loan of Rs.6,00,000/- which was advanced to the defendant from the account of Alok Nangia i.e. plaintiff no.1, Param Nangia and Rashi Nangia i.e. son and daughter of the plaintiff nos. 1 & 2 on 08/03/2021. In order to substantiate the said contentions, plaintiffs produced the bank statement of HDFC Bank of Mr. Param Alok Nangia from which the amount of Two Lakhs was transferred in the account of defendant. Plaintiffs also produced the statement of accounts of ICICI Bank from which the amount of Two Lakhs was transferred in the account of defendant on 08/03/2021. They also produced the statement of account of their daughter Miss. Rashi Nangia to show that the amount of Two Lakhs was transferred in the account of defendant on -- 8 of 22 -- : 9 : 08/03/2021. Till today the defendant has not fully paid the said friendly loan which was advance to the defendant on 08/03/2021 from the account of their family members. The Gpay entries which are shown or tried to be shown to the Hon’ble court are not be complete entries and therefore, they producing the snapshots of the Gpay payments received from the defendant towards repayment of friendly loan in plaintiff’s account and their daughter Rashi’s account and further loan advanced in 16th July 2021 and 12th August 2021 payment made to the defendant on the request of the defendant on humanitarian grounds as friendly loan. In all from account of plaintiffs son Param and plaintiff no.1 account loan amount of Rs.2,00,000/- each was advanced to the defendant on 08/03/2021 and out of total amount of Rs.4,00,000/- till date defendant has only paid Rs.1,48,000/-. Similarly, from the account of plaintiffs’ daughter Rs. 2,00,000/- was advanced on 08/03/2021 as friendly loan to the defendant and thereafter again Rs.75,000/- on 12/07/2021 and Rs.50,000/- on 05/08/2021 and another Rs.50,000/- (i.e. Rs.25,000/- + Rs.25,000/-) on 12/08/2021. Out of total friendly loan of Rs.3,75,000/- advanced from account plaintiffs’ daughter the defendant has only paid Rs.2,75,000/- till date and there is outstanding of Rs.1,00,000/- as on date. The said facts have been suppressed by the defendant. The plaintiffs denied the payment to Mr. Savikant Yadav, Gautam Furniture, Rishab Arora, and Ruchita Kadam are toward license fees due under leave and license agreement dated 19/01/2021. 11. From the facts and circumstances of the case and material on record following points arise for my determination and same are discussed also with findings as below. -- 9 of 22 -- : 10 : Sr. No. POINTS FINDINGS 1. Do plaintiffs made out a prima facie case in their favour? In the affirmative. 2. Whether the balance of convenience lies in favour of plaintiffs? In the affirmative. 3. Whether plaintiffs will face irreparable loss in the event of rejection of application? In the affirmative. 4. Whether it is necessary to appoint Court Receiver under Order XL, Rule 1 of Code of Civil Procedure, 1908 ? In the negative. 5. Whether plaintiffs are entitled for arrears of compensation from 15/01/2021 till 14/01/2022 i.e. 12 months @ Rs.3,50,000/- per month which comes to Rs.42,00,000/- from defendant at contractual rate as agreed under the Leave and License Agreement ? In the affirmative. 6. Whether plaintiffs are entitled for arrears of compensation from 15/01/2022 to 15/03/2023 i.e. 14 months @ Rs.7,00,000/- per month which comes to Rs.98,00,000/- from defendant at contractual rate as agreed under the Leave and License Agreement ? In the affirmative. 7. Whether plaintiffs are entitled for compensation/license fee at double rate i.e. Rs.7,00,000/- per month from 15/03/2023 till disposal of suit ? In the affirmative. 8. What order? As per final order. -- 10 of 22 -- : 11 : :: R E A S O N S :: As to Point Nos. 1 to 7 :- All these points are interlinked with each other, hence to achieve brevity all are discussed altogether. 12. It has been argued by learned advocate for plaintiffs that the present suit filed against the defendant for eviction and of the arrears of compensation on the basis of the leave and license agreement dated 09/01/2021 of suit premises in between plaintiffs and defendant which commenced from 15/01/2021 and expired in 14/01/2022. They filed termination notice through advocate dated 25/08/2022 but to avoid litigation as request of the defendant grant him 4 months time to vacate the suit premises. But surprisingly defendant filed L.D. Suit no. 152 of 2022 in this court and does not approached to the court with clean hands and he is guilty of suppressing various material facts and documents. As per leave and license agreement dated 19/01/2021 the monthly compensation amount is Rs. 3,50,000/- i.e. 42,00,000/- for 12 months and from 15/01/2022 to 15/03/2023 i.e. 14 months @ Rs,7,00,000/- as per clause 18 of the said registered leave and license agreement which comes to Rs.98,00,000/- and in all aggregating to Rs.1,40,00,000/-. The leave and license agreement dated 19/01/2021 has expired by efflux of time on 14/01/2022 and thereafter, the defendant is liable to pay the double compensation amount. If he fails to do vacate the suit premises. But he failed to pay rent amount as well as electricity amount of the suit premises. 13. It has been further argued by plaintiffs that as per the contention of the defendant he paid sum of amount either by cash or -- 11 of 22 -- : 12 : Gpay payment towards the rent amount in favour of plaintiffs. In order to said contention the defendant relied on photocopy of some online payment to the electricity office. On the other hand the plaintiffs submitted their rejoinder vide Exh.16 and therein contended that it has been false contention of the defendant that he has paid a sum of Rs.55,42,300/- in cash. The documents of payment of electricity itself shows that the cheque issued by the defendant through Aadani Energy Pvt. Ltd. have been dishonoured and there is outstanding payment reminder of suit premises. Furthermore, the defendant produced documents on 21/06/2023 to this premise also the plaintiffs submitted additional affidavit of plaintiff no.1. It has been contended by the plaintiffs that defendant requested for friendly loan of Rs. 6,00,000/- to enable to him to carry on his business in the suit premises smoothly, accordingly, the plaintiffs agreed to advance loan to him which was from the account of Alokh Nangia, Param Nangia and Rashi Nangia son and daughter of plaintiff no.1 & 2. The plaintiffs submitted statement of account extract of it. The defendant has not fully paid this friendly loan but as per record he paid sum amount through Gpay payment in the account of plaintiff no.1 and his daughter’s account. There is outstanding amount due at the hands of defendant. Therefore, defendant came with malafide intention with ulterior motive before this court. It has been further argued by plaintiffs that the defendant tried to create third party and inducted to the another person in the suit premises. To support his argument he relied on list of documents in Exh.11 dated 09/08/2023. Therein reveals that there is Zumba Class Board affixed on the front side of suit premises. Furthermore, the photographs shows that unnecessary the flex banner affixed near by to the suit premises which is not at all permissible as per terms of agreement of leave and license. Therefore, during pendency of suit it is -- 12 of 22 -- : 13 : necessary to restrain the defendant and entitled to grant double of license fee with arrears of due amount of license fee of suit premises. To support the argument advanced by the plaintiffs, they relied on bunch of case laws listed in tabular form as under :- Sr. No. Name of parties & Citation Ratio & relevant paragraph no. of judgment The points on which the citation is preferred and relevant paragraph no. of plaint, WS or Judgment of the Trial Court, if any, whichever is applicable Is it over ruled? Or any other remark. 1. Maria Margarida Sequeira Fernandes & Ors. V/s. Erasmo Jack De Sequeira (Dead) through LRS 2012 (5) SCC 370 Suit for injunction by person claiming right to continue in possession of immovable property or to recover possession-involves adjudication of title and adjudication of possession – if titles of defendant to property is established, possession of plaintiff would be presumed to be permissive in nature – plaintiff with such permissive possession must give detailed particularised and specific pleadings along with documents to support him claim and details of subsequent conduct which establish his right to continue possession. Property Law – Property litigations – Practices adopted by unscrupulous litigants in – Judicial determination, to unmask those who have inherent interest in dragging on frivolous litigations, and to frustrate their attempts and impose adequate punishment and/or to afford relief to the Bonafide opposite party, stressed. It is not over ruled. 2. Rajdai Nandlal Shaw V/s. Mhendra Mangruram Gupta Unreported Judgment In view, in suitable cases, the court is not powerless to pass appropriate order for appointment of receiver without It is not over ruled. -- 13 of 22 -- : 14 : in the High Court of Judicature at Bombay ordinary original Civil Jurisdiction Notice of Motion No.1189 of 2014 with notice of motion no.1789 of 2017 in Suit No.443 of 2013 any application by an of the parties while rejecting the application for temporary injunction. Such power of course has to be exercised sparingly and in exceptional cases where dismissal of an application for grant of temporary injunction may lead the parties to take law in their own hands and use their own devices either for protection of unlawful possession of recent origin or for gaining possession or such like circumstances. 3. Ramrameshwari Devi & Ors. V/s. Nirmala Devi & Ors. 2011 (8) SCC 249. Prolonging trial by creating obstacles by making frivolous applications or filing forged documents with motive of avoiding dispossession of unauthorised persons (defendants) from immovable property of plaintiff – even if wrongdoers under present system which requires to be eliminated. It should impose actual, realistic and proper costs on wrongdoers, grant mesne profits at market rate to affected party and also order prosecution of wrongdoer for perjury in appropriate cases – principle of restitution should be fully applied. It is not over ruled. Sr. No. Name of parties & Citation Ratio & relevant paragrap h no. of judgment The points on which the citation is preferred and relevant paragraph no. of plaint, WS or Judgment of the Trial Court, if any, whichever is applicable Is it over ruled? Or any other remark 1. Maharwal Khewanhi Trust (Regd.) Faridakot V/s. Baldev Dass 2005 (1) MhLJ 1043 decided by HHJ N. Santosh Hegde and S.B. Sinha, JJ. Head Note Unless case of irreparable loss is made out, court should not permit nature of property being changed which includes also alienation of transfer of property. It is not over ruled. -- 14 of 22 -- : 15 : 2. Sangeeta Prints V/s. Hemal Prints & Ors. AIR 1986 Bom 423 decided by HHJ Smt. Sujata V. Manohar, J Head Note Suit for recovery of possession of premises and arrears of royalty – plaintiff giving suit premises and business carried out on in suit premises to defendant as licensee in consideration of royalty per month – application by plaintiff for interim deposit of royalty in court. Held court has power to pass interim order directing defendant to deposit arrears of royalty pending disposal of suit. It is not over ruled. 3. New Shivam CHS Ltd. V/s. Raj Publicity 2019 (6) Bom CR 543 decided by HHJ Dama Seshadri Head Note Possession – revocation of license – permanent injunction restraining licensor from dispossession trial court dismissed application. It is not over ruled. 14. It has been argued by learned advocate defendant that there is relation between parties as licensor and licensee. The plaintiffs are owner of the suit premises is not disputed. There is leave and license agreement dated 19/01/2021, therein duration of said leave and license agreement is 36 months as said leave and license agreement will be expired on 31/10/2023, even though the present application filed by the plaintiffs during the existence of leave and license agreement. As per the pleadings of the defendant they repaired suit premises which was very bad in condition, thereafter, Covid-19 situation arose and as per circular of Government the Gym were closed for longer period. The defendant renovated ground and first floor of suit premises, to this premise annexed photographs along with this application. It has been further argued by the defendant that he does not alienated, created third party interest in the suit premises after taking possession of it. He paid rent amount partly either in cash or online which was accepted by the plaintiffs. Furthermore, it has been -- 15 of 22 -- : 16 : argued by the defendant that he filed anticipatory bail which was rejected by Hon’ble Session Court and obtained it from Hon’ble High Court. The plaintiffs instigated to that girl to initiate FIR against him therefore it can not be said that the defendant is having criminal background. 15. It has been further argued by learned advocate for defendant that he is the victim of Covid-19 situation as he could not commence the Gym business due to the situation which was prevailing throughout the world. Hence, prayed that the injunction notice taken out by the plaintiffs may be dismissed. 16. I considered the arguments advanced by both sides. Perused application, say, rejoinder, affidavit of plaintiff no.1, document placed on record by both the parties and bunch of case laws submitted by the plaintiffs. 17. Before going to discuss in details I would like to mention that this is limited inquiry to ascertain prima facie case, balance of convenience and irreparable loss on the basis of pleadings and prima facie documents on record. In the instant case relation between parties admitted, it has been also admitted that initially registered leave and license agreement dated 09/11/2020 executed in between plaintiffs and the defendant with his partner Bhushan R. Jagdale for period of 36 months. 18. Thereafter, also one registered leave and license agreement dated 19/01/2021 executed in between plaintiffs and defendant is admitted. But plaintiffs contended that previous leave and license agreement dated 09/11/2020 terminated as per notice issued dated -- 16 of 22 -- : 17 : 10/12/2020 due to dispute between defendant and his partner and said termination did on the request of defendant. Therefore, fresh registered leave and license agreement dated 19/01/2021 executed between plaintiffs and defendant for 12 months. 19. On the other hand the defendant contented that on 19/01/2021 he was sitting in the suit premises, plaintiff no.1 called him to the office of Sub Registrar, Borivali. He went there and on believing the plaintiffs and without reading the contents thereof, he signed the leave and license agreement as he was told by them that this agreement is in respect of first floor of suit premises and conditions are the same as well as the monthly compensation is also same and the period is mentioned as 36 months. This court observed that Prima facie the fact remained that there are two leave and license registered agreement. The defendant does not denied the subsequent registered leave and license agreement dated 19/01/2021 subject to without reading said leave and license agreement it was signed before Registrar Office by him. Prima facie it reveals that the defendant admitted the signature of registered leave and license agreement, registered leave and license has presumptive value, under such circumstances it cannot be said that he was unaware with regard to contents leave and license agreement dated 19/01/2021, when signature and registration of said document is admitted by the defendant. Therefore, the subsequent leave and license agreement dated 19/01/2021 prevail being registered and signed by defendant. 20. Defendant contended that, the leave and license agreement dated 19/01/2021 is for period of 36 months, therefore, it is still in existence and period is not expired. So this application does not -- 17 of 22 -- : 18 : tenable to grant any compensation amount. It has been also argued by the learned advocate for defendant that if the period of leave and license agreement is 12 months and it expired on 14/01/2022 then why plaintiffs remained silent for such longer period and delay the file present suit. On the other hand the plaintiffs contended that it is nothing but typographical mistake to mention 12 months instead of it 36 months typed but the stamp duty and other contents of the said registered leave and license agreement shows that the period of leave and license agreement is for 12 months. On perusal the copy of registered leave and license agreement dated 19/01/2021, prima facie it reveals that there is period of 36 months shows in para no. 2 in first line but in same para on second line period of commencement from 15/01/2021 to be expired on 14/01/2022. The title of said leave and license agreement reflected the period of 12 months. As well as para no.4 also mentioned about said period of 12 months. Thus, prima facie it is appears that the registered leave and license agreement dated 19/01/2021 is for period of 12 months. The delay to file present suit is explained by the plaintiffs that on request of defendant and to avoid court proceeding awaited for the defendant to vacate the suit premises with payment of arrears of compensation. 21. The next contention raised by defendant that he is the victim of situation of Covid-19 being worldwide closer of business, therefore, he could not run his Gym business and incurred income from it. It has been contented by defendant that some of amount has been paid by him by way of cash and online payment. On the other hand the plaintiffs submitted that there was friendly loan has been given to the defendant and to this premise he paid some amount either in the accounts of daughter and son of plaintiff no.1. Prima facie on perusal -- 18 of 22 -- : 19 : the relevant documents it reveals that some amount has been credited in the account of defendant by the accounts of daughter and son of defendant no.1, the defendant paid online payment to them. There was no any endorsement on said payment was about the monthly license fee of suit premises. As contended by defendant that he paid in cash in cash Rs.55,00,000/- to the plaintiffs as a license fee of suit premises, to this premise this court observed that the defendant failed to produce prima facie on record any rent receipt of it. Thus, at this juncture it cannot said that there is license fee in cash of amount of Rs.55,00,000/- had been paid by the defendant in favour of plaintiffs. Therefore, this aspect shall be considered at the conclusion of trial. 22. As discussion held above, the registered leave and license agreement dated 19/01/2021 expired on 14/01/2022 and there is no prima facie evidence on record for payment of license fee from the period of 15/01/2021 till 14/01/2022 at monthly rent of Rs.3,50,000/- per month by the defendant. Furthermore, there is clause no.18 in the registered leave and license agreement dated 19/01/2021, on perusal said clause, it reveals that in the event of failure to vacate premises on expiry of said agreement the defendant is liable to pay double of rent till handover the possession of premises to the plaintiffs. As on today it is on admitted that the defendant is in possession of suit premises after the expiry period of registered leave and license agreement dated 19/01/2021. The ground mentioned by the defendant being victim of Covid-19 situation his business could not run well so could not make payment of entire license fee, is not at all considerable in the present year 2023. Suit premises being commercial premises is in the possession of defendant without payment of arrears of license fee, it is required to be protected from subletting, part of possession of suit -- 19 of 22 -- : 20 : premises at the hands of defendant and he also liable to pay the arrears of compensation @ Rs.3,50,000/- per month from 15/01/2021 till 14/01/2022 i.e. Rs.42,00,000/-. Furthermore, as discussion held above after the expiry period of leave and license agreement dated 19/01/2021, the suit premises is in possession of defendant without payment of license fee. Therefore, as per clause No.18 of said agreement, he is liable to pay compensation double of license fee amount i.e. @ Rs.7,00,000/- per month from 15/01/2022 to 15/03/2023 of an amount of Rs.98,00,000/- in all the defendant is liable to pay arrears of compensation amount of Rs. 1,40,00,000/- to the plaintiffs, therefore, he directed to deposit an amount of Rs.1,40,00,000/- in the court. As discussion held above, the defendant is also liable to double compensation/license fee amount of Rs.7,00,000/- per month from 15/03/2023 till disposal of suit. Consequently, the above said arrears of compensation and license fee amount as and when deposited by the defendant, the plaintiffs are at liberty to withdraw the said amount subject to undertaking that they would redeposit said amount as and when directed by this court. 23. The plaintiffs contended that suit premises being commercial property is in the dangerous situation by creating third party interest by alienating by the defendant, therefore, it is necessary to appoint Court Receiver to obtain possession of it. As discussion held above the defendant is temporarily restrained from not to create third party interest, subletting, part with the possession of suit premises. Therefore, at this juncture, this court found that there is no requirement to appoint Court Receiver. The case laws referred by plaintiffs is settled position of law. As discussion held above this court found that there is prima facie case in favour plaintiffs, balance of -- 20 of 22 -- : 21 : convenience also lies in their favour. If the injunction is refused then they will suffered irreparable loss which can not be compensate in terms of money. They are also entitled to recover arrears of compensation as above mentioned terms. Therefore, I answer point nos.1 to 3 & 5 to 7 in the affirmative and point No.4 in the negative. As to point Nos. 8 :- 24. In view of the findings as to point nos. 1 to 7, I proceed to pass following order. :: O R D E R :: 1) Application (Exh.11) is partly allowed. 2) The Defendant, his agents, servants, representatives is restrained from letting, underletting, subletting or giving on leave and license basis suit premises or any part thereof during the pendency of the suit. 3) The defendant is directed to deposit in the court the arrears of compensation from 15/01/2021 till 14/01/2022 i.e. 12 months @ Rs.3,50,000/- per month which comes to Rs.42,00,000/- and period from 15/01/2022 to 15/03/2023 i.e. 14 months @ Rs.7,00,000/- per month (i.e. double of license fee) which comes to Rs.98,00,000/- in all aggregating to Rs. 1,40,00,000/- within 2 months from the date of this order. 4) The defendant is further directed to deposit in the court the compensation/license fee at double rate i.e. Rs.7,00,000/- per month from 15/03/2023 till disposal of suit. 5) The plaintiffs are at liberty to withdraw the above said arrears of compensation and license fee amount as and when deposited by the defendant subject to undertaking that they would redeposit said amount as and when directed by this court. -- 21 of 22 -- : 22 : 6) Prayer in respect of appointment of Court Receiver is hereby refused. 7) Both parties to take note of this order. 8) Cost in cause. ( Nutan S. Saraf ) Date: 04/10/2023. Judge, C.R. No. 40 Order dictated on : 04/10/2023. Order Typed on : 04/10/2023. Order checked & signed on : 07/10/2023. -- 22 of 22 --