Full Order Text
Interim Order 1 · 24 Dec 2019 · CNR MHCC040045412019
Order Details: Order Pdf Text: :: 1 :: Draft NMSU1401/19 IN THE BOMBAY CITY CIVIL COURT AT DINDOSHI (BORIVALI DIVISION), GOREGAON, MUMBAI DRAFT NOTICE OF MOTION IN L.C.SUIT NO.1401 OF 2019 (CNR No.MHCC040045412019) Shri Rajendra Bhailal Sanchaniya & Ors. ..Plaintiffs Versus The Mumbai Corporation of Greater Mumbai & Anr. ..Defendants Adv. Mr. N.B. Shukla for the plaintiffs. Adv. Mr. Santosh Mhatre for defendant No.1. None for defendant No.2. Coram : His Honour Judge Shri H.B. Gaikwad (C.R.No.8) Date : 24th December, 2019 ADINTERIM ORDER By way of adinterim relief, the plaintiffs seeks to refer the matter to the Technical Advisory Committee and to restrain the defendants from acting upon the notice dated 14.01.2019 and 13.12.2019, till the decision of the Technical Advisory Committee. -- 1 of 9 -- :: 2 :: Draft NMSU1401/19 2. The learned advocate for the plaintiffs submits that the structural audit of the suit building has been done on 20.06.2019 by V S Tech and Associates on behalf of the plaintiffs, according to which the suit building has been classified C2/A category. The said report has been submitted to defendant No.1 by one of the tenant Uday J. Kapadia on 26.06.2019 and requested to refer the matter to the Technical Advisory Committee (for short 'the TAC'). Initially, the said structural audit report was submitted at the time of deciding the earlier Notice of Motion No.2093/2019, however, the same was not considered as there was no pleading to that effect in the plaint or in the supporting affidavit. He submitted that as now the plaintiffs have amended the plaint and incorporated these facts on record and has filed the present Notice of Motion, the matter needs to be referred to the TAC as there are two conflicting reports. He thus, submits that no prejudice will be caused to the defendants, if the matter is referred to the TAC and till its decision the suit building is protected. 3. As against this, the learned advocate for defendant No.1 strongly opposed for referring the matter to the TAC, as plaintiffs have not submitted the structural audit report within the prescribed time and even till filing of the suit. He submitted that only after filing of the suit, the structural audit report has been submitted to defendant No.1, which is not permissible as per the guidelines laid down by defendant No.1. He urged that the plaintiffs have slept over their rights till filing of the suit for appointing structural auditor. He canvassed that the plaintiffs cannot act as per their whims and caprices and submit the structural audit report, as per their convenience. Thus, according to him, as already Notice of Motion No.2093/2019 claiming similar relief has been -- 2 of 9 -- :: 3 :: Draft NMSU1401/19 dismissed by this court on 5.07.2019 on merits, the same relief cannot be again considered. He, thus, prayed for refusal of adinterim relief. 4. It is the case of the plaintiffs that they are the tenants in the building known as 'Zainab Baugh Building', which consist of ground plus four floors, situated at Bharucha Road, Dahisar (East), Mumbai (for short 'the suit building'). There are total 68 tenants in A and B Wing of the suit building. Defendant No.2 is the owner and their landlord. They are paying rent and rent receipts are also issued to them. Ration Cards are also issued to the plaintiffs at the address of the suit building. The plaintiffs have also obtained electricity connection at their respective flats. 5. On 29.11.2018, the Assistant Commissioner, R/North Ward issued notice, stating that the suit building is classified in C1 category and requires propping for the protection of the suit building. One of the tenant has replied the said notice on 11.12.2018, stating that the said notice is illegal and the suit building is wrongly classified as C1 category and requested to grant repair permission of the suit building. Thereafter, the Assistant Engineer (B&F), R/North WardII Office issued a notice bearing No.RN/DO2RN/006/354MMC ACT/RN15N01 dated 14.01.2019 (for short 'the impugned notice') at the instance of defendant No.2, stating that the suit building is in a dilapidated condition, which needs to be demolished. The impugned notice has been issued without conducting any structural stability audit of the suit building and without complying the directions given by the Hon'ble High Court in Writ Petition No.1135 of 2014. The suit building is stable and in habitable condition, however, defendant No.2 wants to get the -- 3 of 9 -- :: 4 :: Draft NMSU1401/19 suit building vacated, with the help of defendant No.1, without providing the redevelopment benefits to the plaintiffs and other tenants. 6. As defendant No.2 failed to get the suit building vacated, he instigated the officer of defendant No.1 and got the notice dated 28.05.2019 issued. By the said notice, the plaintiffs were threatened to disconnect their water and electricity supply on 11.06.2019, with the help of the police. The said notice was served upon the plaintiffs on 10.06.2019. Defendant No.1 acted highhandedly and disconnected the water and electricity supply to the suit building on 11.06.2019, without complying the directions given in the Writ Petition No.1135 of 2014. Defendant No.1 without carrying any structural stability audit has initiated action under Section 354 of the Mumbai Municipal Corporation Act (for short 'the Act'). Defendant No.2 started to compel and force the occupants to vacate the suit building by using the machinery of defendant No.1, by disconnecting the water, electricity and other amenities. Defendant No.2 is not ready to execute any agreement with them and other occupants in respect of redevelopment and its benefits. Defendant No.2 wants to throw the plaintiffs out of the suit building. In this background, they were constrained to file the present suit challenging the impugned notice to be illegal. 7. Initially, the plaintiffs have filed Notice of Motion No.2093/2019 claiming protection of the suit building in pursuance of the notice dated 14.01.2019 issued under Section 354 of the MMC Act and for restoration of water supply. The said motion was partly allowed on merits only to the extent of restoration of electric and water supply that too till one day prior to their eviction. -- 4 of 9 -- :: 5 :: Draft NMSU1401/19 8. Now the plaintiffs have taken out fresh Notice of motion and are claiming adinterim relief for referring the matter to the TAC and till that time for protecting the suit building. The only ground raised in the present notice of motion is pertaining to referring the matter to the TAC and till that time for protection of suit building. 9. Admittedly, the plaintiffs have not carried out the structural audit of the suit building, till filing of the suit. At this stage, the plaintiffs seek to refer the matter to the TAC on the grounds that now the structural audit of the suit building has been done on their behalf and there being two contrary structural audit reports. As per Guidelines for declaring the private and municipal buildings as C1 category (dangerous, unsafe) dated 25.05.2018 framed by the MCGM, which has been accepted by the Hon’ble High Court in the case of Municipal Corporation of Greater Mumbai Vs. The State of Maharashtra & Ors., decided on 28.02.2018 in Writ Petition No.1080/2015, the owner/occupier has to submit their structural audit report, within 30 days from the receipt of the notice under Section 353(B) of the MMC Act. 10. The notice dated 29.11.2018 filed by defendant No.1 on record shows that it was served upon the occupants of the suit building including the plaintiffs whereby they were informed about the structural audit report submitted for and on behalf of defendant No.2 and directed the occupiers to submit their objections for structural audit report within 30 days. The signatures of the occupiers and the said notice being pasted on the respective flats, is also seen from the said -- 5 of 9 -- :: 6 :: Draft NMSU1401/19 notice. The photographs filed by defendant No.1 dated 30.11.2018 also shows that the said notice has been affixed on the suit building. 11. Even the plaintiffs themselves have admitted in para no.7 of the plaint that one of the tenant has replied the said notice on 11.12.2018. The perusal of the said letter filed by the plaintiffs shows that one Subhashchandra Vyas has issued the said letter to the Assistant Commissioner for permission to carrying out reconstruction of the building. This letter also prima facie shows that the said tenant has sought permission for reconstruction and not for repair. The reason for reconstruction has not been stated in the said letter. Thus, there is nothing on record to show that the plaintiffs have either replied the notice dated 29.11.2018 or submitted any structural audit report to defendant No.1. The plaintiffs though, were aware about defendant No.1 calling upon them to submit the structural audit report, they failed to appoint any structural auditor and did not submit any report within 30 days. 12. Even till filing of the suit the plaintiffs did not appoint any structural auditor. It is during the pendency of the suit, the plaintiffs appointed the structural auditor and submitted the structural audit report to defendant No.1 on 26.06.2019 through one of the tenant. This shows the inaction and negligence on the part of the plaintiffs. 13. The structural audit report prepared on behalf of the plaintiffs was placed before this court at the time of hearing of Notice of Motion No.2093/2019, wherein also the plaintiffs have sought temporary injunction for restraining the defendants from implementing -- 6 of 9 -- :: 7 :: Draft NMSU1401/19 the notice dated 14.01.2019 issued under Section 354 of the MMC Act. This court after hearing both the parties has partly allowed the said Notice of Motion. By the said order, only the prayer for restoration of water and electricity supply of the plaintiffs was granted, while the other reliefs were rejected. Now by way of present Notice of Motion, the plaintiffs again seeks temporary injunction to restrain the said defendant No.1 from enforcing the notice dated 14.01.2019 and also the notice dated 13.12.2019. 14. The notice dated 13.12.2019 has been subsequently, issued by defendant No.1 directing the plaintiffs to vacate the suit building and for disconnection of water and electric supply on 19.12.2019, as per the order dated 5.07.2019 passed in this case. Thus, it appears that the plaintiffs are claiming the same relief only by stating that now the matter needs to be referred to the TAC. As already observed the plaintiffs have slept over their rights and did not appoint the structural auditor till filing of the suit. Thus, as no violation of the guidelines of the MCGM laid down in this regard has been prima facie shown and as already the Notice of Motion No.2093/2019 has been decided on merits on 5.07.2019, no case is made out by the plaintiffs for grant of any ad interim relief. 15. As a sequel to the above discussion, the plaintiffs have not made out any prima facie case. The structural audit report submitted by defendant No.2 and the photographs of the suit building prima facie shows that the same is in a dilapidated condition and the possibility of the building being collapsed, at any point of time putting the occupiers/tenants of the suit building and the public at large at risk, -- 7 of 9 -- :: 8 :: Draft NMSU1401/19 does not warrant any interim protection. An irreparable loss at this stage will naturally, be caused to the public at large, as their lives are always at risk, looking to the condition of the suit building. Therefore, comparative injury, which the defendants and public at large may suffer is more than which may be caused to the plaintiffs. All these aspects are already being dealt with, while deciding the Notice of Motion No.2093/2019. Hence, I pass the following order: ORDER Adinterim relief claimed by the plaintiffs is refused. Date: 24.12.2019 (H.B.Gaikwad) Judge, City Civil & Sessions Court, Borivali Division, Dindoshi Goregaon, Mumbai Dictation given directly on computer on : 24.12.2019 Checked and signed by HHJ on : 24.12.2019 “CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL SIGNED JUDGMENT/ORDER.” UPLOAD DATE ATUL SURYAKANT BHOGTE AND TIME : 26.12.2019 3.50 P.M. NAME OF STENOGRAPHER -- 8 of 9 -- :: 9 :: Draft NMSU1401/19 Name of the Judge (with Court Room No.) HHJ Shri H.B.Gaikwad (Court Room No.8) Date of Pronouncement of Judgment/Order 24.12.2019 Judgment/Order signed by P.O. on 24.12.2019 Judgment/Order uploaded on 26.12.2019 -- 9 of 9 --
