Full Order Text
Order 1 · 23 Oct 2019 · CNR MHCC010106122019
Order Details: Other Pdf Text: 1 Ad-Int Order on Draft NM SU-2733-19 IN THE CITY CIVIL COURT FOR GREATER BOMBAY AT MUMBAI. ORDER ON AD INTERIM RELIEF IN DRAFT NOTICE OF MOTION IN SUIT NO. 2733 OF 2019 (CNR no. MHCC010106122019) Pandharinath Moreshwar Pathare ] Age : 62 years, residing at D132, ] situated on plot bearing CTS No.1224(Pt), ] 1224/1, 1224/2, 1224/3, 1223, 1223/1, ] Chembur Gaothan, Chembur(East), Mumbai400071. ]... Plaintiff Versus 1. The Municipal Corporation of Gr. Mumbai, ] a body Corporate duly incorporated under ] the provisions of MMC Act, 1888 having ] its office at Mahanagar Palika Marg, ] Mumbai400 001, through its ] Assistant Engineer (B&F)/D.O., ] M/West ward, Municipal office, ] Sharadbhau Acharya Marg, Near Natraj Cinema, ] Chembur, Mumbai400071. ] 2. Mr. Dharmendra Bhagwant Mhatre ] Age : 49 years, Occupation : Service ] 3. Mrs. Nanda Satish Thakur ] Age : 48 years, Occupation : Service ] 4. Mr. Kiran Bhagwant Mhatre ] Age : 46 years, Occupation : Service ] All residing at 54, "Pitashray", 2nd floor, ] Chembur Gaothan, Chembur, Mumbai400071. ]....Defendants -- 1 of 6 -- 2 Ad-Int Order on Draft NM SU-2733-19 Appearances: Ld. Advocate Mr. P. S. Bhosale with Ld. Advocate Mr. S. K. Bhosale for the Plaintiff. Ld. Advocate Mr. Pratap Singh for defendant no. 2. None for defendant no. 1/MCGM. None for defendants no. 3 and 4. CORAM : HIS HONOUR JUDGE SHRI C. V. MARATHE (Court Room no. 8) DATED : 23th October, 2019 O R A L O R D E R O N A D I N T E R I M R E L I E F 1. Perused plaint, documents annexed thereto, notice of motion and heard both sides. After perusal of the plaint allegations and the prayers made therein, it can be gathered that the plaintiff is challenging various proceedings initiated under Section 351 Mumbai Municipal Corporation Act,1888 (hereinafter "MMC Act") for the following alleged unauthorized work carried out by the plaintiff in the suit premises (as described in the plaint): "Unauthorized construction of first floor over existing ground floor structure using brick masonry and RCC slab roof at D/132, Chembur, Gaothan, Mumbai71." 2. While arguing in support of the Notice of Motion, Ld. Advocate for the plaintiff has stressed upon the fact that the suit premises is located in ‘Gaothan’, it is very old structure existing prior to 1962 and -- 2 of 6 -- 3 Ad-Int Order on Draft NM SU-2733-19 existence of first floor was much prior to the plaintiff coming in to possession of the suit premises in 1994. Ld. Advocate for the plaintiff has also pointed out that the defendant no.2, a complainant, has also narrated in his complaint dated 03.10.2017 that the tenant Balkrishna Sadanand Mhatre is residing at ground floor and the said fact suggests that the plaintiff resided on first floor of the suit premises since beginning. However, it can be seen from the Conveyance Deed dated 16.04.1994 that at the time of conveyance, the plaintiff was residing at D131 which is a separate structure adjacent to the suit premises. The said Conveyance Deed also shows that the suit premises was in dilapidated condition due to its old age and it was consisting of two tenants and the vendor was unable to evict them. In the entire description of the suit premises in that deed it is nowhere mentioned that the same is a G+1 structure. The utility bills, documents/assessment extracts of the suit premises are insufficient to show existence of first floor with prior permission of defendant/MCGM. Ld. Advocate for the defendant no. 2 has shown an extract prepared by defendant no.1/MCGM dated 22.05.2015 which clearly shows that the suit premises having only ground floor was considered for capital value calculation. Gaothan is portion of the land of the village which is ordinarily -- 3 of 6 -- 4 Ad-Int Order on Draft NM SU-2733-19 used for settlement. “Gaothan “or” village site" means the land included within the site of a village, town or city as determined by section 122 of Maharashtra Land Revenue Code, 1966. Ld. Advocate for the plaintiff has failed to show any special provision for Gaothan land which exempts the occupier from prior permission of the Planning Authority before starting construction or making changes/extension to the existing structure of the building. For all the above reasons, the plaintiff has failed to prima facie establish that the first floor to the existing structure of the suit premises is not in existence prior to the datum line 17.04.1964 or it is an authorized structure or it is constructed as per plans approved by AE(B&F)/Ward M/West or by any other Competent Authority. 3. Ld. Advocate for the plaintiff has tried to show from the letter dated 20.12.2017 that the plaintiff initially applied for repair permission on 18.02.2016 and after receiving no reply from the defendant no.1/MCGM, he carried out the tenantable repairs in the suit premises. However, the said letter dated 18.02.2016 is no supported by the building plan prepared by Architect or not giving any details of existing structure. Moreover, in that letter the plaintiff sought extension of height of the mezzanine floor. This prayer does not come within the -- 4 of 6 -- 5 Ad-Int Order on Draft NM SU-2733-19 definition of tenantable repair and the same can be made only after permission of defendant no.1/MCGM. As discussed hereinearlier, the plaintiff has failed to prove existence of first floor with authorization or it is tolerated structure. Therefore, the plaintiff is not entitled for ad interim relief. Hence, adinterim relief is liable to be rejected and following order: ORDER 1. Adinterim relief is rejected. (C. V. Marathe) Judge, Date : 23.10.2019 City Civil Court, Gr. Mumbai. Dictated on : 23.10.2019 Transcribed on : 23.10.2019 Signed by HHJ on : 23.10.2019 -- 5 of 6 -- 6 Ad-Int Order on Draft NM SU-2733-19 CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL SIGNED JUDGMENT/ORDER.” UPLOAD DATE AND TIME : 23.10.2019 at 5.28 p.m. NAME OF STENOGRAPHER : Mrs. Gayatri P. Acharekar Name of the Judge (With Court Room no.) HHJ Shri. C. V. Marathe C.R. no.01 Date of Pronouncement of JUDGMENT/ORDER 23/10/2019 JUDGMENT/ORDER signed by P.O. on 23/10/2019 JUDGMENT/ORDER uploaded on 23/10/2019 -- 6 of 6 --
