Final Order 1 · 17 Feb 2026 · CNR MHCC010092422019
Order Details: Notice of Motion Pdf Text: 1 Suit No.2409/2019 ...Order on NM No.3382/2019 MHCC010092422019 IN THE BOMBAY CITY CIVIL COURT AT MUMBAI. NOTICE of MOTION NO.3382 of 2019 IN SUIT NO.2409 of 2019 Rosy Paul Nunes ....Plaintiff Versus Municipal Corporation of Gr. Mumbai. ….Defendants CORAM : HIS HONOUR JUDGE SHRI C. S. DATIR (C.R. NO.04). DATE : 17.02.2026 Appearance: Advocate Mr. S.K.Bhosale for plaintiff. Advocate Ms. Vidya Vyavahare for defendant/MCGM. ORDER 1. Plaintiff has taken out this Notice of Motion, requesting to restrain the defendants from demolishing or pulling down the suit structure or any portion thereof in pursuance of Notice dated 12/07/2018 issued under section 354A of MMC Act and Speaking Order dated 31/08/2019. 2. According to plaintiff, she is occupier of the suit structure for last more than 70 years. Her father was owner of the property prior to 1955. Suit structure is permanent. Her father pays Assessment tax time to time since 1955. Electricity meter was also installed by the -- 1 of 7 -- 2 Suit No.2409/2019 ...Order on NM No.3382/2019 BSES, The water meter was also installed. As suit premises is very old, required certain repairs of plastering of wall and replacement of cracked AC sheet on the roof. Repairs were completed in 2019 before the impugned Notice came to be issued. 3. She further contended that, on account of false complaint, defendant had issued impugned Notice under section 354A of MMC Act, alleging that, it is a unauthorized construction with BM wall. The Notice issued by the Corporation is illegal and bad in law. Defendant threatened to demolish the suit structure. Whatever structure erected by the plaintiff is tenantable repairs as provided under section 342 of MMC Act and it is not permanent structure or unauthorized structure. The photographs are place on record for the perusal of the Court. No sketch or measurement has been mentioned in the alleged Notice. 4. She lastly prays, defendant be restrained from acting or demolishing the suit structure in pursuance of the impugned Notice. To support his contention, he placed following citations. 1. WP No. 1323/2005, M/s. Sub Vijay International Pvt. Ltd. Vs. MCGM, dtd. 28/06/2006. 2. 1996 (1) Mh.L.J. Order in WP Nos. 4765 to 4767/1995, Sopan Maruti Thopte & Anr. Vs. Pune Mun. Corpn. 3. SC Order in SLP No.9049/2006 Muni Suvrat Swami Jain S.M.P. Singh Vs. Arun Nathuram Gaikwad & Ors. 4. HC Order dated 15/04/1999 in AO No.257/1999. 5. Circular dated 01/04/2006 by Mun.Corpn. Gr. Mumbai with Circular dated- March 2006. -- 2 of 7 -- 3 Suit No.2409/2019 ...Order on NM No.3382/2019 5. As against, the Learned Advocate for defendant filed affidavit of Vijay Mutrak, Jr. Engineer, cum say alongwith documents to oppose the Notice of Motion, stating that, plaintiff has not issued Statutory Notice to the defendant for filing the suit under section 527 of MMC Act. On that ground alone, Notice is not tenable. The Notice issued by the Corporation is its executive acts and it is not open to challenged in the Court of law. Plaint does not disclosed the cause of action. 6. He further contended that, one Nasim Qureshi has made complaint on 24/06/2019 regarding the unauthorized construction and on the basis of complaint, the competent officer of Corporation has visited the spot and inspected the suit structure in question. While inspecting the suit structure, they noticed that, plaintiff has made unauthorized construction with BM walls 9.0 mtr. length X 6.0 mtr. width and 2.4 mtr. height. They have also taken photographs and filed on record. Thereafter, they have issued Notice under section 354A of MMC Act to stop the work fourthwith. The Designated Officer has also informed him that, if you have any permission approved by the competent authority in favour of erection of the building or execution of work, you may produce the permission within 24 hours from the service of this Notice. In response to the 354A of MMC Act Notice, the plaintiff has produced Assessment of property and property card before the Designated Officer. An opportunity of personal hearing was given to him and after hearing, the Designated Officer come to conclusion that, the property Assessment document from AAC department, the structure only 20.48 sqm of SAC and 13.02 of SAC area is prior to 1961-62 and remaining structure out of 12 rooms is unauthorized. -- 3 of 7 -- 4 Suit No.2409/2019 ...Order on NM No.3382/2019 7. Therefore, the Designated Officer issued Speaking Order on 31/08/2019, stating that, to remove the additional structure beyond the existing area but they did not remov the same and directly approach to this Court. Therefore, Notice issued by the Corporation is legal, valid and in accordance with law. Plaintiff has erected unauthorized construction mentioned in the inspection report or even the Speaking Order, which cannot be protected. Therefore, Notice of Motion be dismissed with cost. 8. Heard arguments of both sides. Perused the record. 9. It appears that, the plaintiff appears to be owner of the basic suit structure. The property card is place on record. The entire structure is not disputed. The disputed structure is only 9.0 mtr. length X 6.0 mtr. width and 2.4 mtr. height of BM walls. It appears, one Nasim Qureshi has made complaint to the BMC office that, the unauthorized construction was going on at the spot, therefore, the team of the BMC Officers has came on the spot and inspected the suit property. 10. It further appears that, when the Designated Officer has came on the spot on 11/07/2019, they noticed that, the structure was in progress. The height, length and width of the unauthorized structure is mentioned in the inspection report. The structure is of residential purpose. They have also taken photographs and filed on record. The photographs clearly shows that, the structure is in progress and several rooms are being constructed at the spot. On the basis of inspection report, the Designated Officer has issued Notice under section 354 A of the MMC Act on 12/07/2019 and directed to the plaintiff to stop the -- 4 of 7 -- 5 Suit No.2409/2019 ...Order on NM No.3382/2019 work forthwith. He also directed, if any permission approved by the competent authority in favour of erection of the building or execution of the work, he was directed to produce the permission within 24 hours from the service of Notice, else, the necessary action will be taken. In response to the Notice under section 354A of the MMC Act, plaintiff appears before Designated Officer and submitted Assessment of property and Property card. Upon perusal entire record, the Designated Officer has come to the conclusion that, only 20.48sqm of SAC and 13.02 sqm of SAC of structure area is prior to 1961-62 and remaining structure out of 12 rooms is unauthorized, therefore, plaintiff was directed to discontinue the work of construction and to remove the additional constructed area. However, they did not removed the same. 11. It further appears that, the entire structure (basic structure) is not disputed by the BMC. Only unauthorized construction which was going on 12/07/2019, which is mentioned in the inspection report as well as Speaking Order are disputed structure i.e. (9.0 mtr. length X 6.0 mtr. width and 2.4 mtr. Height). Plaintiff failed to show that, they have taken prior permission to construct the alleged unauthorized construction. Not only this, the photographs say that, the construction work is going on at that time, therefore, there is no question that, the alleged construction is prior to datum-line. Therefore, it can be safely say that, the alleged structure is unauthorized and it can not be protected. 12. The Advocate of plaintiff has attracted my attention towards the property card, property tax receipt, ration card, passport, Pancard, electricity bills, birth certificate etc. I have perused the same -- 5 of 7 -- 6 Suit No.2409/2019 ...Order on NM No.3382/2019 minutely. No doubt, plaintiff is residing in the suit structure long back and the property stands in his name. At the cost of repetition, I would like to urge that, except the unauthorized construction mentioned in the inspection note couple with speaking order, the remaining structure is not disputed by the Corporation. Therefore, the documents filed by the learned Advocate of plaintiff do not satisfy to the Court that, the plaintiff has taken prior permission from the competent authority to construct alleged unauthorized structure or it was of prior to datum- line. In the circumstances, the citations filed by the Learned Advocate of plaintiff would have no bearing. Thus, I proceed to pass the following order. ORDER Notice of Motion No.3382/2019 stands dismissed and disposed of accordingly. (C. S. DATIR) Judge, Date: 17/02/2026 City Civil Court,Gr. Mumbai. Dictated on : 17/02/2026 Typed on : 17/02/2026 Checked on : 17/02/2026 Signed on : 17/02/2026 -- 6 of 7 -- 7 Suit No.2409/2019 ...Order on NM No.3382/2019 “CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL SIGNED JUDGMENT/ORDER” 17/02/2026 S.S.Sawabt (Grade-I) UPLOAD DATE AND TIME NAME OF STENOGRAPHER Name of the Judge (with Court Room no.) HHJ Shri C. S. DATIR (Court Room No.04). Date of Pronouncement of Judgment/Order 17/02/2026 Judgment/Order signed by P.O. on 17/02/2026 Judgment/Order uploaded on 17/02/2026 -- 7 of 7 --