Skip to main content
SUIT - SHORT CAUSE CIVIL SUIT

LALITHA VASUDEVANVsEkta Shubham Venture +6 more

CNR MHCC0100679320234-COURT 04 AD-HOC JUDGE
Fort, City Civil Court
Mumbai · Maharashtra (MH)
CASE DISPOSED
Uncontested--COMPROMISE
Decision Date: 10th January 2024

TrustJury record updated 16 Oct 2026

Case Overview

Registration Number
101470/2023
Registration Date
05 Jul 2023

Advocates

1

For Petitioner

For Respondent

    Not available

    Parties

    8

    Acts & Sections

    1
    Specific Relief Act · Sec 38

    Case Timeline

    Newest first8 dates/groups
    Case disposedCompletion recorded

    10 Jan 2024

    2 records
    Court Proceeding

    Advocate S. Chaudhary for plaintiff present and tendered registered ch/s No.35/24 and also tendered application for withdrawal of suit marked as Exh.9…

    Read full proceeding
    Business: Advocate S. Chaudhary for plaintiff present and tendered registered ch/s No.35/24 and also tendered application for withdrawal of suit marked as Exh.9 O-Deft No.3 to say. Adv. Karan Duo h/f Anand Singh for deft No.1 present. Adv. Pranav Chavan h/f Mahesh Menon for Deft No.2 present. Advocate Suryavanshi for defendant No.3/BMC present and has given say on Exh. 9 overleaf. Adv for deft No.1 tendered Deed of Admission cum Retirement marked as  Exh.11 Following order is passed in ch/.s No. 35/2024 ORDER 1. The plaintiff has filed this ch/s for amendment in the name of def No.1 Ekta Shubham Venture Now known Ekta Realtors Partnership Firm in the clause title of the plaint. Defendants gave no objection. The deft No.1 produced on record true copy of the form for change in name of the deft No.1, Firm to the office of Registrar of Partnership. It is taken on record marked as Exh.10. In the circumstances I pass following order ORDER 1. Chamber summons hereby made absolute in terms of prayer clause a 2. Plaintiff to carry out amendment and served amended plaint upon defendant. Keep back Later on 4.34 p.m. Advocate S. Chaudhary for plaintiff present Adv. Anand Singh for deft No.1 present. Adv. Rupesh Palvalkar for deft No.2 present. Advocate Suryavanshi for defendant No.3/BMC present Order below Exh.1 The plaintiffs and defendants filed consent terms below Exh.8, on 09.01.2024. The plaintiff No.1 and 2 and defendant No.1 and 2 admitted their signatures and contents of consent terms. The defendant No.1 filed verified copy of Notarized Deed of partnership alongwith true copy of form for change in name of the firm from M/s Ekta Shubham Venture to M/s Ekta Realtors. The Authorized signatory of defendant No.2 society produced copy of resolution of the society authorizing Shubhash Arora and J. P. Singh. The copy of resolution is marked as Exh.12. Hence the consent terms TOR. Defendant No.1 agreed to pay an amount of Rs.35,00,000/ Thirty Five Lacs only to the plaintiffs and also agreed to pay Rs.2,25,000/ Rs.Two Lacs Twenty Five Thousand Only to defendant No.2. It appears that the disputes has been amicably settled between plaintiffs and deft No.1 and 2. The plaintiffs have withdrawn suit against deft No.3 BMC. The Advocate for plaintiff filed an application below Exh.9 for withdrawal of the suit against deft No.3/BMC. It is pointed out that as per Clause-1 the plaintiffs stated that they do not want to proceed with the suit against the defendants. Hence in view of the consent terms following order is passed. ORDER 1. Suit against defendant No.3 disposed of as withdrawn. 2. Compromise decree passed in terms of below Exh.8 consent terms be treated as part of decree. 3. The Plaintiffs to pay deficit Court fees as per law. 4. Court fees be refunded to the parties as per law. 5. In view of disposal of suit NM No.2957/2023 is disposed of accordingly.
    Nature Of Disposal: COMPROMISE
    Disposal Date: 10-01-2024
    Final Order 1

    Order Details: Other Pdf Text: Dt:10.01.2024 SU 1470/23 Exh. 9 Exh. 11 Exh. 10 CORAM : H.H.J. SHRI S.H. SALUNKHE ( C.R. No. 04 ) Advocate S. Chaudhary for plaintiff present and tendered registered ch/s No. 35/24 and…

    Read Full Order →

    09 Jan 2024

    1 record
    Court Proceeding

    Not on Board Taken on Board – By praecipe Plaintiff No. 1 and 2 present. Advocate S. Chaudhary for plaintiff present and tendered draft Chamber summons @…

    Next purpose: C/S REPLY
    Read full proceeding
    Business: Not on Board Taken on Board – By praecipe
    Plaintiff No. 1 and 2 present.
    Advocate S. Chaudhary  for plaintiff present and tendered draft Chamber summons @ affidavit in support
    O- Leave granted to register Ch/s.  Copy of deft/BMC kept in R & P.
    Adv.  Karan Duo h/f Anand Singh for deft No. 1 present.
    Adv. Mahesh Menon for Deft No. 2 present.
    Adv for Deft 1 and Deft No. 2 has given say on ch/s overleaf.
    On request
    Keep back
    Later on 3.56 p.m.
    Same appearance
    Defendant No. 1 (b) Vivek Mohanani present
    Deft No. 2 (a) and 2 (b)  - J. P. Singh – Secretary of society and Chairman of society – Subhashchandra Arora are present.
    Order below Exh. 1
           The plaintiff No. 1 and 2 their Advocates, defendant No. 1 (b) Vivek Mohnani, deft No. 2 (a ) and 2 (b) and their respective Adv are present. The parties have filed terms of settlement which are duly signed by parties and they are identified by their Advocate on record. The parties admitted their signatures and submitted that matter amicably settled as per the consent terms and submitted to pass compromise decree as per consent terms. Hence consent terms TOR and marked as Exh. 8 collectively.  However defendant No. 1 has not produced Deed of partnership. Defendant No. 1 directed to produced Deed of partnership. Hence matter adjourned for order as per consent terms and production of partnership Deed and say of the corporation.
    Adjd  to 10.01.2024  for order as per Consent terms and Partnership Deed and Reply to ch/s by corporation.
    Next Purpose: C/S REPLY

    15 Dec 2023

    1 record
    Court Proceeding

    Matter pertains to C. R. No. 4 Advocate S. Chaudhary for plaintiff present. Adv. Ritesh Tiwari for deft No. 1 present. Adv. Dipesh Panvalkar for deft No.…

    Next purpose: NM FOR HEARING
    Read full proceeding
    Business: Matter pertains to C. R. No. 4
    Advocate S. Chaudhary for plaintiff present.
    Adv. Ritesh Tiwari for deft No. 1 present.
    Adv. Dipesh Panvalkar for deft No. 2 present.
    Advocate Suryavanshi  for defendant No.3/BMC present.
    Earlier order, if any, to continue till next date.
    Adjd  to 29.01.2024  for  NM Hearing
    Next Purpose: NM FOR HEARING

    08 Nov 2023

    1 record
    Court Proceeding

    Advocate S. Chaudhary for plaintiff present. Adv. Aditya Suryavanshi for Deft No. 1 present. Adv Chavan for deft No. 2 present. Advocate Suryavanshi for…

    Next purpose: NM FOR HEARING
    Read full proceeding
    Business: Advocate S. Chaudhary for plaintiff present.
    Adv. Aditya Suryavanshi for Deft No. 1 present.
    Adv Chavan for deft No. 2 present.
    Advocate Suryavanshi  for defendant No. 3/BMC present.
    Adv for plaintiff submitted that deft No. 1 has challenged order of status-quo and AFO is posted tomorrow and requested to adjourned matter on 19.12.2023.
    Earlier order, if any, to continue till next date.
    Adjd  to  15.12.2023  for NM Hearing
    Next Purpose: NM FOR HEARING

    27 Sept 2023

    1 record
    Court Proceeding

    Advocate S. Chaudhary for plaintiff present and tendered rejoinder. Copy is supplied to other side. Adv. for deft No. 1 present in first session. Adv…

    Next purpose: NM FOR HEARING
    Read full proceeding
    Business: Advocate S. Chaudhary for plaintiff present and tendered rejoinder. Copy is supplied to other side.
    Adv. for deft No. 1 present in first session.
    Adv Palvankar for deft No. 2 present.
    Advocate Suryavanshi  for defendant No. 3/BMC present.
    Earlier order, if any, to continue till next date.
    Adjd  to   08.11.2023   for NM Hearing
    Next Purpose: NM FOR HEARING

    04 Sept 2023

    1 record
    Court Proceeding

    Coram: H.H.J. SHRI. A. G. SANTANI (COURT ROOM No.11) IN-CHARGE OF COURT ROOM No.4

    Matter pertains to C.R. No.04. Adv. Ms. Chauhan i/b. Indus Law for plaintiff present Adv. Mr. Karan for D/1-a and b present None for D/2 Adv. Mr.…

    Next purpose: REJOINDER
    Read full proceeding
    Business: CORAM H.H.J. SHRI. A. G. SANTANI (COURT ROOM No.11) IN-CHARGE OF COURT ROOM No.4
    Matter pertains to C.R. No.04.
    Adv. Ms. Chauhan i/b. Indus Law for plaintiff present
    Adv. Mr. Karan for D/1-a and b present
    None for D/2
    Adv. Mr. Suryavanshi for defendant No.3/BMC present
    Earlier order, if any, to continue till next date
    Adjd. to 27/9/2023 for N/M rejoinder.
    Next Purpose: REJOINDER

    11 Aug 2023

    1 record
    Court Proceeding

    Advocate S. Chaudhary for plaintiff present and tendered original NM No. 2957/2023 TOR Adv Karan Dua for defendant No. 1a and 1b present and tendered…

    Next purpose: REJOINDER
    Read full proceeding
    Business: Advocate  S. Chaudhary  for plaintiff present and tendered original NM No. 2957/2023  TOR
    Adv Karan Dua  for defendant No. 1a and 1b present and tendered additional affidavit of reply to NM. Copy is supplied to plaintiff and other defendants.
    Adv Pranav Chaudhary i/b Mahesh Menon and Co. def No.2  present.
    Advocate Mhatre h/f Suryavanshi  for defendant No.3/BMC present.
    Adv for plaintiff requested for two weeks time. The plaintiff is directed to serve copy of rejoinder in advance to the defendant.
    Earlier order, if any, to continue till next date.
    Adjd  to  04.09.2023  for Rejoinder.
    Next Purpose: REJOINDER

    12 Jul 2023

    2 records
    Court Proceeding

    Advocate S. Chaudhary for plaintiff present. Adv. Anand Singh for defendant No. 1 present Adv. Pranav Chavan for defendant No. 2 present. Advocate…

    Next purpose: NM REPLYREJOINDER
    Read full proceeding
    Business: Advocate S. Chaudhary for plaintiff present.
    Adv. Anand Singh for defendant No. 1 present
    Adv. Pranav Chavan for defendant No. 2 present.
    Advocate Suryavanshi for defendant No.3/BMC present.
    Following order is passed on Ad-interim relief on draft Notice of Motion
    ORDER
    1.     The plaintiff who is the flat purchaser filed the suit for declaration that revised sanctioned plan in respect of parking place No.11 on ground floor of Panorama Building be declared as Null and vide, for injunction. The plaintiff took out NM for temporary injunction and prayed for      ad-interim relief in term of prayer clause (a) to (c) of the draft NM.
    2.      Heard advocates for the parties at length.
    3.     Advocate for plaintiff submitted that defendant No. 1 is developer and defendant No. 2 is society. The defendant No. 2 society decided to re-develope the building of the society and appointed defendant No. 1 as developer.   Accordingly plan was sanctioned and by agreement to sale dated 19.06.2019 defendant No. 1 agreed to sale flat No. 1601 admeasuring 135 sq mt. with 3 covered party.  The agreement  came to be registered at the office of assurance Kurla. However behind back and without consent of the plaintiff, defendant No. 1 revised the plan and Garage bearing No. G-11 which  was allotted to plaintiff is converted in to Gym. He further submitted that the change in structure of the Garage is contrary to the provision of the MOFA Act. He submitted that once the sanctioned plan is disclosed by developer to the flat purchaser, he can not change and or made alteration, addition in the structure without consent of the flat purchaser. He submitted that there was no consent of the plaintiff for changing the structure i.e change in Garage No. G-11. Therefore the plaintiff is entitle for ad-interim protection till filing reply by the defendant.
    4.    The Advocate for plaintiff in support of his submission relied on judgment of Hon’ble Apex Court in the matter of Jayantilal Investment  V/s  Madhuvihar Co-op. Housing. Society.
    5.   On the other hand Advocate for defendant No. 1 submitted that the plan of the building was sanctioned in the year 2019 and as per the agreement date 19.06.2019 the plaintiff agreed to purchase the two BHK flat with parking. However as per the demand of the plaintiff for Three BHK flat plan of building came to be amended and revised in the year 2021. He further submitted in the General Body meeting held in September 2021 corporation has authorized the developer to amend the plan. In the said General Body meeting all the member including plaintiff was present. This show that plaintiff has given consent for revival of the plan and changed in the Garage No. G-11 as a Gym. He further submitted that in the lieu of garage i.e. suit structure plaintiff has been allotted another garage as such no any prejudice or irreparable loss would cause to the plaintiff if ad-interim protection is refused.  Adv for defendant No. 1 relied on judgment on Hon’ble Supreme Court in the case Nahalachand Laluchand Pvt. Ltd. V/s Panchali Co-op. Housing. Society  and judgment of the Hon’ble high Court in the matter of Calvin property Housing V/S Green field Co-op. Society to submit that the decision of the General Body is the supreme and unles said decision is challenged, the plaintiff being member of society, is bound by said resolution. He further submitted that plaintiff has filed complaint before RERA Authority and he did not get any relief before said authority. Therefore he filed this suit and it is further submitted plaintiff is choosing the forum. Therefore plaintiff is not entitle for any relief.
    6.        It is admitted that defendant No. 2 is the society and defendant No. 1 is developer. The defendant No. 2 society appointed defendant No. 1 as a developer. The plan of the redevelopment of the society building has been sanctioned in the year 2019 and accordingly defendant No. 1 constructed 16 storied building with Amenities. As per the agreement dated 19.06.2019 defendant No. 1 developer agreed to sale flat No. 1601 with 3 covered parking with the plaintiff.  It is the contention of the plaintiff that the possession of the flat as well as car parking has been given to him. However without consent of the plaintiff, defendant No. 1 revised the plan and thereby Garage No. G-11 has been converted in Gym.  As per the section 7 of the MOFA Act once the entire project is placed before the flat purchaser at the time of agreement promoter is not required to obtain prior consent of the flat purchase as long  as developer put additional construction with lay out plan. Further section 7 requires the consent of the flat purchaser of the building for any addition, alteration in the building. The promoter is required to make discloser about the potentiality of the plot and additional  FSI, TDR to be loaded on the plot.  In the case in hand there is nothing on record to shows before changing the structure of garage G-11, the consent of the plaintiff was taken.  The Advocate for the defendant submitted in General Body meeting held in September 2021 plaintiff was present but noting placed on record to shows that in said meeting plaintiff was present. On perusal of the copy of resolution of General Body meeting September 2021  produced by the defendant No. 2 society it appears that the resolution was passed in the meeting of  member who have signed the DA.  As per the provision of section 7 of the  MOFA  Act promoter has to take consent of all flat purchaser if any alteration was to be made in the structure of the flat or any alteration, addition in the structure of the building after the plan and specification were disclosed. There is nothing on record to show that before carrying out alteration or changes in garage G-11 the consent of the plaintiff has been taken as per the provision of MOFA Act.  Thus, the change and alteration in the garage prima-facie appears to be in violation of the provision of MOFA Act.  I gone to the judgment relied by defendant No. 1. However fact of the case in hand and fact of the judgment relied by def No. 1 are not identical.  Whether the consent of the plaintiff was taken before carrying out changes in structure of the garage needs inquiry after filing detail reply by the defendant to the Notice of Motion. I hold that the Plaintiff has made out, case for granting ad-interim relief. Hence, I pass following order.
    ORDER
    1.  Defendant No. 1 and 2 are directed to maintain status-quo suit structure till next date as shown in the photograph filed by defendant No.1
    2.  Plaintiff is directed to register the Notice of Motion till next  date.
    3.    Defendants to file reply to Notice of Motion.
    Adjd to 11.08.2023   for  NM Reply
    Next Purpose: NM REPLYREJOINDER
    Court Proceeding

    Advocate S. Chaudhary for plaintiff present. Adv. Anand Singh for defendant No. 1 present Adv. Pranav Chavan for defendant No. 2 present. Advocate…

    Next purpose: NM REPLYREJOINDER
    Read full proceeding
    Business: Advocate S. Chaudhary for plaintiff present.
    Adv. Anand Singh for defendant No. 1 present
    Adv. Pranav Chavan for defendant No. 2 present.
    Advocate Suryavanshi for defendant No.3/BMC present.
    Following order is passed on Ad-interim relief on draft Notice of Motion
    ORDER
    1.     The plaintiff who is the flat purchaser filed the suit for declaration that revised sanctioned plan in respect of parking place No.11 on ground floor of Panorama Building be declared as Null and vide, for injunction. The plaintiff took out NM for temporary injunction and prayed for      ad-interim relief in term of prayer clause (a) to (c) of the draft NM.
    2.      Heard advocates for the parties at length.
    3.     Advocate for plaintiff submitted that defendant No. 1 is developer and defendant No. 2 is society. The defendant No. 2 society decided to re-develope the building of the society and appointed defendant No. 1 as developer.   Accordingly plan was sanctioned and by agreement to sale dated 19.06.2019 defendant No. 1 agreed to sale flat No. 1601 admeasuring 135 sq mt. with 3 covered party.  The agreement  came to be registered at the office of assurance Kurla. However behind back and without consent of the plaintiff, defendant No. 1 revised the plan and Garage bearing No. G-11 which  was allotted to plaintiff is converted in to Gym. He further submitted that the change in structure of the Garage is contrary to the provision of the MOFA Act. He submitted that once the sanctioned plan is disclosed by developer to the flat purchaser, he can not change and or made alteration, addition in the structure without consent of the flat purchaser. He submitted that there was no consent of the plaintiff for changing the structure i.e change in Garage No. G-11. Therefore the plaintiff is entitle for ad-interim protection till filing reply by the defendant.
    4.    The Advocate for plaintiff in support of his submission relied on judgment of Hon’ble Apex Court in the matter of Jayantilal Investment  V/s  Madhuvihar Co-op. Housing. Society.
    5.   On the other hand Advocate for defendant No. 1 submitted that the plan of the building was sanctioned in the year 2019 and as per the agreement date 19.06.2019 the plaintiff agreed to purchase the two BHK flat with parking. However as per the demand of the plaintiff for Three BHK flat plan of building came to be amended and revised in the year 2021. He further submitted in the General Body meeting held in September 2021 corporation has authorized the developer to amend the plan. In the said General Body meeting all the member including plaintiff was present. This show that plaintiff has given consent for revival of the plan and changed in the Garage No. G-11 as a Gym. He further submitted that in the lieu of garage i.e. suit structure plaintiff has been allotted another garage as such no any prejudice or irreparable loss would cause to the plaintiff if ad-interim protection is refused.  Adv for defendant No. 1 relied on judgment on Hon’ble Supreme Court in the case Nahalachand Laluchand Pvt. Ltd. V/s Panchali Co-op. Housing. Society  and judgment of the Hon’ble high Court in the matter of Calvin property Housing V/S Green field Co-op. Society to submit that the decision of the General Body is the supreme and unles said decision is challenged, the plaintiff being member of society, is bound by said resolution. He further submitted that plaintiff has filed complaint before RERA Authority and he did not get any relief before said authority. Therefore he filed this suit and it is further submitted plaintiff is choosing the forum. Therefore plaintiff is not entitle for any relief.
    6.        It is admitted that defendant No. 2 is the society and defendant No. 1 is developer. The defendant No. 2 society appointed defendant No. 1 as a developer. The plan of the redevelopment of the society building has been sanctioned in the year 2019 and accordingly defendant No. 1 constructed 16 storied building with Amenities. As per the agreement dated 19.06.2019 defendant No. 1 developer agreed to sale flat No. 1601 with 3 covered parking with the plaintiff.  It is the contention of the plaintiff that the possession of the flat as well as car parking has been given to him. However without consent of the plaintiff, defendant No. 1 revised the plan and thereby Garage No. G-11 has been converted in Gym.  As per the section 7 of the MOFA Act once the entire project is placed before the flat purchaser at the time of agreement promoter is not required to obtain prior consent of the flat purchase as long  as developer put additional construction with lay out plan. Further section 7 requires the consent of the flat purchaser of the building for any addition, alteration in the building. The promoter is required to make discloser about the potentiality of the plot and additional  FSI, TDR to be loaded on the plot.  In the case in hand there is nothing on record to shows before changing the structure of garage G-11, the consent of the plaintiff was taken.  The Advocate for the defendant submitted in General Body meeting held in September 2021 plaintiff was present but noting placed on record to shows that in said meeting plaintiff was present. On perusal of the copy of resolution of General Body meeting September 2021  produced by the defendant No. 2 society it appears that the resolution was passed in the meeting of  member who have signed the DA.  As per the provision of section 7 of the  MOFA  Act promoter has to take consent of all flat purchaser if any alteration was to be made in the structure of the flat or any alteration, addition in the structure of the building after the plan and specification were disclosed. There is nothing on record to show that before carrying out alteration or changes in garage G-11 the consent of the plaintiff has been taken as per the provision of MOFA Act.  Thus, the change and alteration in the garage prima-facie appears to be in violation of the provision of MOFA Act.  I gone to the judgment relied by defendant No. 1. However fact of the case in hand and fact of the judgment relied by def No. 1 are not identical.  Whether the consent of the plaintiff was taken before carrying out changes in structure of the garage needs inquiry after filing detail reply by the defendant to the Notice of Motion. I hold that the Plaintiff has made out, case for granting ad-interim relief. Hence, I pass following order.
    ORDER
    1.  Defendant No. 1 and 2 are directed to maintain status-quo suit structure till next date as shown in the photograph filed by defendant No.1
    2.  Plaintiff is directed to register the Notice of Motion till next  date.
    3.    Defendants to file reply to Notice of Motion.
    Adjd to 11.08.2023   for  NM Reply
    Next Purpose: NM REPLYREJOINDER

    Additional Case Details

    Additional Case Details
    Filing Number: 107126/2023
    Filing Date: 03-07-2023
    First Hearing Date: 12th July 2023
    Decision Date: 10th January 2024
    Court Number And Judge: 4-COURT 04 AD-HOC JUDGE

    TrustJury presents public court-record information for legal discovery and reference. Record availability and detail can vary by source and case.