Full Order Text
Final Order 1 · 23 Jul 2019 · CNR MHCC010067612019
Order Details: Notice of Motion Pdf Text: 1 NM 2467-19 in Stamp No.6858-19 CNR NO.MHCC0100676119 IN THE COURT OF CITY CIVIL FOR GREATER BOMBAY AT BOMBAY NOTICE OF MOTION NO. 2467 OF 2019 IN L.C. SUIT (STAMP) NO. 6858 OF 2019 Ms. Pooja Arambhan …...Plaintiff Versus The Municipal Corporation of Greater Mumbai & Ors. ..... Defendants Coram : Sanjay N. Yadav, Judge (Court Room no. 05) Date : 23rd July, 2019. Appearance: Ld. Adv. Mr. Dalal for the plaintiff. Ld. Adv. Mrs. Tondwalkar for defendant/MCGM. Ld. Adv. Mr. R.A. Shaikh for defendant no. 4 present. ORDER 1. The plaintiff by this notice of motion seeks temporary injunction restraining the defendant corporation from acting upon the notice issued under Section 351 of the Mumbai Municipal Corporation Act, 1888 (herein after referred to as 'the MMC Act') dated 09.05.2019 and the order dated 11.06.2019. 2. Heard Learned Advocate for the plaintiff, Learned Advocate for defendant corporation and defendant no. 4. The plaintiff was issued with notice dated 09.05.2019 calling upon the plaintiff to show the sufficient cause for the structure -- 1 of 5 -- 2 NM 2467-19 in Stamp No.6858-19 mentioned in the schedule of notice which reads as under: ''Unauthorized construction of Ground+ 01 composite structure (Ground floor occupied by A.A. Shah Institute and first floor occupied by M/s. Aranbhan Hospitality Ltd.) with sloping A.C. sheet roof adm. 27.2m x 5.30m x (2.65m ground floor ht.+ 4m first floor ht.) at the rear open space of the building known as Bahubali Building, Cawasji Patel Street, Fort, Mumbai01.'' 3. The notice was replied by the plaintiff on 17.05.2019. The speaking order was passed on 03.06.2019, directing the plaintiff to demolish the notice structure within 7 days from the receipt of the notice. 4. The short question to be dealt alongwith is whether the suit structure are needs to be maintained in statusquo till the disposal of the suit. The reason's for the conclusion of speaking order dated 03.06.2019 are that the plaintiff had failed to produce documents to show the permission of the disputed structure and failure by plaintiff to show the suit structure existed prior to 1964. It is the contention of the plaintiff that the assessment record was not considered by the defendant corporation. It is contended that the defendants are required to consider the relevant documents before passing the order. It is contended that suit property exists prior to the datum line. 5. The defendant corporation contended that the plaintiff has failed to show that the notice structure exists on the datum line. The plaintiff had failed to produce the documents showing that the suit structure existed prior to the datum line. -- 2 of 5 -- 3 NM 2467-19 in Stamp No.6858-19 6. It is submitted by the plaintiff that in Notice of Motion No. 2095/2019 in L.C. Suit No. 1350/19, this Court is restrained the defendant corporation from acting upon the order dated 03.06.2019. It is contended that the notice structure is in the said premises located on 1st floor. 7. The plaintiff had relied upon the inspection report for the year 1992 93 and for the year 20092010. It goes to suggest that the suit structure existed in the year 1992 93. It is the contention of the plaintiff that suit structure is in existence prior to the datum line. The plaintiff had relied upon document in form of agreement and other documents to show the existence of the structure prior to the datum line. It is the contention of the defendant that the plaintiff had carried out unauthorized construction in open land, besides the original Bahubali building. It was for the defendant to establish that the plaintiff was in occupation of any other premises other than premises in question was or is in existence. The defendant had not shown any other premises in possession of the plaintiff in existence. The plaintiff appears to be in possession of the notice structure since long. It is his contention that the suit structure is in existence prior to the datum line. The defendant corporation contends that plaintiff has failed to show the existence of structure prior to datum line. It is not the case of the corporation that the suit structure is brought in existence after datum line. The defendant no. 4 objected the notice of motion and contended that the unauthorized construction should not be tolerated. -- 3 of 5 -- 4 NM 2467-19 in Stamp No.6858-19 8. There is triable issue involved in the suit which can be gone into at the time of trial. Moreover, in other connected premises, the plaintiff in this said suit is protected by the orders of this Court. The plaintiff has made out primafacie case in his favour. The balance of convenience lies in favour of the plaintiff. The plaintiff would be put to irreparable loss, if the temporary injunction is refused. In the result, following order is passed. ORDER 1. The Notice of Motion No. 2467/2019 is hereby allowed. 2. The defendants corporation are hereby restrained from acting upon Notice dated 09.05.2019 under Section 351 of the MMC Act and the order dated 11.06.2019 till the disposal of the suit. 3. The Notice of Motion is disposed off accordingly. (Sanjay N. Yadav) Judge, Date : 23.07.2019 City Civil Court, Mumbai. Dictated on : 23.07.2019 Transcribed on : 24.07.2019 Signed by HHJ on : 26.07.2019 -- 4 of 5 -- 5 NM 2467-19 in Stamp No.6858-19 CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL SIGNED JUDGMENT/ORDER.” UPLOAD DATE AND TIME : 26.07.2019 at 4.45p.m. NAME OF STENOGRAPHER : Mrs. K.S.Bhosale Name of the Judge (With Court Room no.) HHJ Shri. Sanjay N. Yadav C.R. no. 05 Date of Pronouncement of JUDGMENT/ORDER 23.07.2019 JUDGMENT/ORDER signed by P.O. on 26.07.2019 JUDGMENT/ORDER uploaded on 26.07.2019 -- 5 of 5 --
