Full Order Text
Order 1 · 11 Aug 2026 · CNR MHCC010064582018
Order Details: Notice of Motion Pdf Text: 1 Suit No.1617/2018 ...Order on NM No.1964/2018 MHCC010064582018 IN THE BOMBAY CITY CIVIL COURT AT MUMBAI. NOTICE of MOTION NO.1964 of 2018 IN SUIT NO.1617 of 2018 Amandeep Singh Sassi ....Plaintiff Versus Municipal Corporation of Gr. Mumbai & Anr. ….Defendants CORAM : HIS HONOUR JUDGE SHRI C. S. DATIR (C.R. NO.04). DATE : 11.08.2026 Appearance: Advocate Mr. Dhotre for plaintiff. Advocate Ms. Rupali Patil for defendant/MCGM. ORDER 1. Plaintiff has taken out this Notice of Motion, requesting the effect and operation of the impugned Notice dated 22/05/2018 and consequential order dated 23/5/2018 under section 354A of the MMC Act be stayed. 2. According to him, he has filed the suit for declaration and other ancillary reliefs sought for. According to him, he has purchased the suit property by way of Conveyance Deed. He is in possession over the suit property. There is no illegal or unauthorized construction as such. Even though Corporation has issued impugned Notice dated 22/05/2018 and also passed impugned Speaking Order dated -- 1 of 5 -- 2 Suit No.1617/2018 ...Order on NM No.1964/2018 23/05/2018, contending that, he has made unauthorized vertical and horizontal extension and change of material of AC sheets without permission of the Competent Authority. While issuing impugned Notice under section 354 A of the MMC Act, defendant did not follow their circular dated 11/8/2000 and 29/04/2006. The mandatory directions have been not followed. The Notice has been issued mechanically and without application of mind. Corporation ought to have follow their circular in accordance with the law. Thus, Notice of Motion be allowed and impugned Notice be stayed. 3. Corporation has filed reply to the Notice of Motion and resisted the same, saying that, the averments made by the plaintiff are not correct. Plaintiff has not given Statutory Notice under section 527 of the MMC Act. No cause of action arose to file the suit. Suit property is not identifiable. This Court has no jurisdiction to entertain the suit. In fact, officer of the defendant had inspected the suit premises on 21/05/2018 and found that, plaintiff was carrying unauthorized reconstruction which was already demolished in vertical and horizontal extension and made alteration by using blocks. 4. Therefore, defendant has issued notice to stop unauthorized construction or to produce the permission if any. However, plaintiff denied to accept the Notice. He has no documents of authorization of the construction, thereafter, Designated Officer has passed the Speaking Order on 23/05/2018 in accordance with law and there is no illegality as such. Inspite of Notice, plaintiff has not stopped his unauthorized work, therefore, defendant has rightly started the action of demolition on 24/5/2018. When the demolition action is going on, plaintiff has approached to this Court in vacation bench and -- 2 of 5 -- 3 Suit No.1617/2018 ...Order on NM No.1964/2018 obtained status-quo order. The alleged construction is partly demolished. Plaintiff has not taken permission for construction. He has made unauthorized construction and thereby defendant has rightly issued Speaking Order. He lastly prayed, Notice of Motion be dismissed. 5. Heard arguments of both sides. Perused the record. 6. It appears, the officers of the defendant/Corporation had inspected the suit premises on 21/05/2018 and found that, the plaintiff was carrying the unauthorized reconstruction, which was already demolished vertical an horizontal extension by using siporex blocks. Thereafter, the Notice under section 354A of the MMC Act was issued directing to the plaintiff to stop the unauthorized construction or to produce the permission obtained from Corporation, if any, however, plaintiff failed to produce permission. Not only this, plaintiff has neither replied nor submitted any authenticated documents to prove the authorization of the Notice structure within stipulated period. 7. It also appears that, plaintiff failed to prove that the ongoing construction is going on with the prior permission of the planing authority. As plaintiff failed to produce cogent and constructive documents, the Designated Officer has passed the Speaking Order dated 23/05/2018. Even after issuance of Notice, plaintiff has not stopped the erection of the unauthorized work. Therefore, defendants have rightly started demolition action on 24/05/2018. As Court has granted status-quo, the demolition process has been stopped. In fact, the suit structure is partly demolished. The photographs to that effect are placed on record. The conduct of the plaintiff shows that, he has started reconstruction which was already demolished. -- 3 of 5 -- 4 Suit No.1617/2018 ...Order on NM No.1964/2018 8. It further appears that, plaintiff has made recital in para no.4 of the plaint that, he is ready to go for regularization process. I am view that, once’s the plaintiff has admitted that, he is ready to opt the regularization proposal, it means, his structure is not authorized. If he wants to make regularization proposal, he may proceed in accordance with law and comply the same as per the guideline of the Municipal Corporation. It is an independent proceeding. If his regularization application is accepted by the Corporation, the Court has nothing to do. However at any cost, without the permission, the unauthorized work can not be protected. 9. Considering the first inspection report dated 21/05/2018, the stop work Notice under section 354A of the MMC Act and the Speaking Order dated 23/5/2018 couple with photographs filed by the Corporation with the demolition report, I am of the candid opinion that, suit structure can not be protected and thereby, plaintiff is not entitled the relief sought for. Hence, I proceed to pass the following order. ORDER Notice of Motion No.1964/2018 stands dismissed and disposed of accordingly. (C. S. DATIR) Judge, Date: 11/08/2026 City Civil Court,Gr. Mumbai. Dictated on : 11/08/2026 Typed on : 11/08/2026 Checked on : 11/08/2026 Signed on : 11/08/2026 -- 4 of 5 -- 5 Suit No.1617/2018 ...Order on NM No.1964/2018 “CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL SIGNED JUDGMENT/ORDER” 11/08/2026 S.S.Sawant (Grade-I) UPLOAD DATE AND TIME NAME OF STENOGRAPHER Name of the Judge (with Court Room no.) HHJ Shri C. S. DATIR (Court Room No.04). Date of Pronouncement of Judgment/Order 11/08/2026 Judgment/Order signed by P.O. on 11/08/2026 Judgment/Order uploaded on 11/08/2026 -- 5 of 5 --
