Full Order Text
Final Order 1 · 28 Jun 2019 · CNR MHCC010054642018
Order Details: Notice of Motion Pdf Text: IN THE COURT OF CITY CIVIL FOR GREATER BOMBAY AT BOMBAY NOTICE OF MOTION NO.1662 OF 2018 IN SUIT NO.1609 OF 2013 1. Amina E.Begmohammed (Deleted/deceased) 2. Riyad Rashid Oomerbhoy, 2. Roohi Oomerbhoy Chetan Jaikishan, 3. Ismail Nazir Shakoor, ... Plaintiffs Versus 1.Salim Ebrahim Begmohammed(Deleted/deceased) 1a. Mrs.Dureshwar Salim Begmohammed, 2. Abubakar SalimBegmohammed, 3. Mrs.Tanveer Nazir Munshi, 4. Miss.Salma nazir Munshi ... Defendants CORAM: HIS HONOUR JUDGE SHRI K.P.NANDEDKAR (COURT ROOM NO.9) DATE : 28th JUNE, 2019 Advocate Mr. Kalpesh Joshi for Plaintiffs. Advocate Mr.P.D.Gandhi for Defendant no.1(a) and 2. Advocate Ms. Nidhi for Defendant no.3 and 4. O R D E R 1. This notice of motion is taken out by plaintiffs for temporary injunction restraining defendant no.2, his servants and other persons claiming through him from obstructing, interfering with plaintiffs' peaceful and uninterrupted use and access to the terrace of building i.e. Noor Mansion and carry out work of cleaning water tanks, carry out water proofing work and attend satellite TV dishes installed on the terrace. Plaintiffs have also prayed for temporary mandatory injunction directing defendant no.2, his servants, agents etc. for giving access to the plaintiffs or their representative to said terrace for carrying -- 1 of 7 -- :2: NM.1662/18 IN SUIT1609/13 out work of cleaning water tanks, work of water proofing etc. along with prayer for appointing independent Contractor, Architector, Structural Engineer from the panel of this Court to visit common open to sky terrace including the area of terrace covered by defendant 1(a) and defendant no.2 on 4th Floor i.e. 3rd floor ceiling area and side walls of suit building. Such Architect/ Structural Engineer should be directed to submit his report with civil work, repair, RCC strengthening work, water proofing required to be carried out at the suit premises. Plaintiffs have prayed that such a contractor/ structural engineer to complete civil work referred above within time schedule framed by the Court. Plaintiffs have also prayed for temporary mandatory injunction directing defendant no.1(a) and defendant no.2 to deposit 1/3rd share of the costs and expenses to be incurred as per the quotation of contractor/structural engineer. They have prayed for temporarily permitting the plaintiffs to incur the costs of such civil work, as per the report of Contractor/Water Proofing Experts/Structural Engineer and they should be temporarily permitted to put temporary monsoon tarpaulin sheet shed at suit premises. Plaintiffs have also prayed for temporary directions to police authorities of Gaondevi Police Station for temporary assistance in respect of above referred civil work at the suit premises. They have prayed for temporary injunction restraining defendant no.2, his servants, agents etc. from blocking driveway of suit building by parking his Car bearing No.MH01CT3631 or such other vehicles near the main entrance of the said building. Affidavit in detail is filed by plaintiff no.2 Mr.Riyad Rashid Oomerbhoy in support of the notice of motion. Defendant no.2 has also filed his affidavit of reply to resist the notice of motion. -- 2 of 7 -- :3: NM.1662/18 IN SUIT1609/13 2. Considering the arguments on behalf of the plaintiffs and defendant no.2, I am not referring in detail the contentions of those affidavits, however it is necessary to point out here that plaintiffs' notice of motion No.2572/2018 was dismissed by my learned predecessor observing that plaintiffs are at liberty to amend notice of motion no.1662/2018 for appropriate prayers in said notice of motion for seeking reliefs based on the report given by the Contractor. Thereafter, notice of motion no.1662/2018 is amended and above referred so many prayers are impleaded in notice of motion. On 21/06/2019 plaintiffs' advocate Mr.Joshi and advocate Mr.P.D.Gandhi for defendant nos.1 and 2 pointed out that prayer clause(b1) of the notice of motion in which prayer is made for appointment of independent Contractor/Architect/ structural engineer from the panel of this Court to visit common open to sky terrace including the area of terrace covered by defendant nos.1(a) and 2 on 4th Floor, 3rd floor ceiling area and side walls of the suit building. Both the learned lawyers have further pointed out that in said prayer clause b1 the prayer is made for directions to such Contractor/ Architect/Structural Engineer to submit his report in respect of civil work/repair, RCC strengthening work and water proofing work required to be carried out at the suit premises at the earliest. Both the learned lawyers submitted that dispute between plaintiffs and defendant nos.1(a) and 2 will come to an end if the expert as referred in prayer clause (b1) of notice of motion will be appointed but only for inspecting suit building for suggesting remedies for water proofing of 3rd floor ceiling and terrace of suit premises. From the above submissions made by both the learned lawyers it becomes clear that parties to the suit are intending that contractor/structural engineer from the panel of this Court should submit his report as prayed in prayer clause (b1) of notice of motion. On 21/06/2019 it was argued by advocate Mr.Joshi -- 3 of 7 -- :4: NM.1662/18 IN SUIT1609/13 on behalf of plaintiffs that further arguments in respect of other prayers from notice of motion No.1662/2018 will be advanced after receiving such a report and therefore, according to advocate Mr.Joshi notice of motion no.1662/2018 should be kept pending awaiting report of such Contractor/Structural Engineer. 3. I have given serious consideration to the arguments advanced by both the learned lawyers. I have perused the plaint, order of my learned predecessor passed in notice of motion no.2572/2018. From perusal of the record of the suit, it is noticed by me that plaintiffs and defendants have raised disputes in respect of rights of defendant no.2 to act as Mutawallis in respect of property which is private Wakf property. Considering the statements made by both the learned counsels, if really parties will enter into settlement after receiving the report of Contractor/Structural Engineer from the panel of the Court, definitely it will be beneficial for both the parties and the dispute will come to end forever. Hence, I find that for giving fair opportunity to the parties to settle the dispute between them by consent of both the parties, it is necessary to appoint Structural Engineer for compliance of prayer clause (b1) only for purpose of inspection of suit premises and for suggesting remedies in respect of repairs, water proofing, strengthening etc. of suit premises. At the same time, it is made clear that notice of motion no.1662/2018 is necessary to be disposed off because notice of motion no.2572/2018 was filed in the pendancy of Notice of Motion no.1662/2018, notice of motion no.2572/2018 is disposed off and again notice of motion no.1662/2018 is amended and if notice of motion will remain pending definitely the dispute between the parties will not come to an end. Therefore, I am of the opinion that liberty can be given to plaintiffs to file fresh notice of motion only in -- 4 of 7 -- :5: NM.1662/18 IN SUIT1609/13 respect of making prayers for repairing, strengthening, water proofing etc. of suit premises on the basis of the report which will be submitted by Contractor/ Structural Engineer. Any how, if this Court will be required to consider all the prayers for notice of motion no.1662/2018 definitely the dispute between the parties will not come to an end. Therefore, for restricting the dispute between the parties and for giving opportunity to parties for settlement, I find that notice of motion no.1662/2018 is necessary to be disposed off. Hence, I proceed to pass following order. O R D E R 1. Registrar of this Court is directed to appoint Structural Engineer from the panel of the Court for inspection of suit premises for compliance of prayer clause (b1) of the Notice of Motion. 2. Such Structural Engineer should be directed to inspect suit building and suit premises and to submit his report about the remedies by which cleaning of water tanks, water proofing, strengthening, etc of suit premises can be done. 3. Both the parties are directed to equally contribute the cost of such Civil Structural Engineer. 4. Considering the nature of dispute between the parties, I am of the opinion that Structural Engineer from the panel of this Court can be requested to submit his report at the earliest, but no time frame can be given to maintain the respect of such Structural Engineer. 5. Registrar of this Court is directed to inform the name of such Structural Engineer to the Court after consulting such Structural Engineer and after getting confirmed about fees/charges of such Structural Engineer for inspection of suit building and suit premises and for submitting his report as directed by the Court. 6. Registrar of this Court is directed to consult at the earliest, any of the Structural Engineer from the panel of the Court and to seek his consent for such work to be completed as directed by the Court. -- 5 of 7 -- :6: NM.1662/18 IN SUIT1609/13 7. Notice of Motion no.1662 of 2018 stands disposed off with liberty to Plaintiff to file fresh Notice of Motion for making restricted prayers for cleaning of water tanks, repairing, water proofing etc of suit premises along with prayer for access to the contractor for such work. It is made clear that liberty is not being granted to Plaintiff to make so many prayers as like the prayers from Notice of Motion no.1662 of 2018. Sd/ (K.P.NANDEDKAR) 28/06/2019 JUDGE, CITY CIVIL COURT, MUMBAI. Dictated on : 28/06/2019 Transcribed on : 05/07/2019 Signed by HHJ on : 06/07/2019 -- 6 of 7 -- :7: NM.1662/18 IN SUIT1609/13 “CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL SIGNED JUDGEMENT/ORDER” UPLOAD DATE TIME NAME OF STENOGRAPHER 06/07/2019 01.45PM B.R.HATEKAR S.G. Name of the Judge HHJ Shri K.P.NANDEDKAR(CR No.9) Date of Pronouncement of Judgment/Order. 28/06/2019 Judgment/order signed by P.O on 06/07/2019 Judgment/order uploaded on 06/07/2019 -- 7 of 7 --
