Full Order Text
Final Order 1 · 06 Oct 2020 · CNR MHCC010044062020
Order Details: Notice of Motion Pdf Text: Draft N/m in Stamp No. 4432/2020. 1 Order. IN THE BOMBAY CITY CIVIL COURT AT BOMBAY. NOTICE OF MOTION NO. OF 2020 IN STAMP NO. 4432 OF 2020 Qamruddin Mohd. Yasin Ansari ...Plaintiff Versus The Assistant Municipal Commissioner and Others ...Defendants CORAM : SHRI G.G.BHANSALI. (C.R.NO.11). DATE : 6th OCTOBER, 2020. Mr. Wasim R. Khan, Advocate for Plaintiff. Mrs. Mhatre, Advocate for Defendant No.1 / MCGM. Mr. V.T.Dubey, Advocate for Defendant Nos.2 and 4. ORDER This is a motion taken out by plaintiff to restrain defendants no.2 to 4 from construction of upper floors on a property 85/5, New National Building, Brahman Wadi, Pipe Road, Kurla (West), Mumbai – 70. 2. The property situated in ‘L’ Ward, admeasuring 4800 sq.ft. approximately, bearing C.T.S.No. 998/1. It is equally divided in three shares measuring 1600 sq.ft. Defendant no.2 runs a bakery namely ‘Nasheman Bakery’ in one square of 1600 sq.ft., erection of first floor and additional upper floors is the question in dispute. There are other two bakeries in remaining two parts namely ‘Lucky Bakery’ and -- 1 of 7 -- Draft N/m in Stamp No. 4432/2020. 2 Order. ‘National Bakery’. Plaintiff has noticed construction in remarkable speed above the Nasheman Bakery. Defendants no.2 and 3 being owner and possessor of the premises doesn’t have any permission of said construction. Initially upon the complaint of plaintiff, first floor erected by the defendants was demolished. Thereafter defendants no.2 and 3 have started the construction of upper two floors. Defendant no.4 is contractor-cum-architecture of said building. It is submitted that defendants be restrained from further construction. Plaintiff has issued a complaint to defendant no.1 MCGM on 02/09/2020. However, no action has been initiated in view of said complaint. It is claimed for prohibitory and mandatory injunction. 3. Perused reply submitted by defendant no.2 vide Exh.4. Perused documents submitted by defendant no.1 MCGM vide Exh.3 and supportive affidavit vide Exh.5. 4. Ld. Adv. Wasim Khan for plaintiff submits that in view of one complaint submitted by the plaintiff some construction of defendant no.2 and 3 came to be demolished by the MCGM. There is no permission of further erection sought by defendant no.2 to 4 from the MCGM. The photographs submitted by both side speaks for itself that even during pendency of present suit, defendant no.2 and 3 with the help of defendant no.4 has constructed upto third floor. It is prayed for prohibitory and mandatory injunction. 5. Ld. Adv. V.T.Dubey for defendant no.2 and 4 submits that there is no pleading against MCGM. There is no notice issued under Section 527 of MMC Act. Therefore, the suit is not tenable before this Court. It is added that plaintiff is not immediate neighbour of -- 2 of 7 -- Draft N/m in Stamp No. 4432/2020. 3 Order. defendant no.2. There is one bakery in between plaintiff and defendant no.4. It is admitted that there are equal three shares of C.T.S.No. 998. In view of Conveyance Deed dated 13/04/1998, the name of defendant no.2 and 3 entered into Index-II. There is no relief claimed against defendant no.1 MCGM. The appropriate authority MCGM has not initiated any action, therefore no relief can be claimed by the plaintiff. It is added that during the inspection of MCGM, some encroachment of plaintiff came to be noticed which was based on complaint of defendant no.2. Therefore due to vengeance and enimical terms, present suit came to be filed by the plaintiff. It is claimed to reject the motion. 6. Ld. Adv. Mhatre for defendant no.1 submits that one notice under Section 354 of MMC Act was issued on 05/09/2020. Defendant no.2 and 3 were failed to reply, therefore the detail speaking order was issued on 08/09/2020. On 10/09/2020 partial demolition was completed by the MCGM. Hence it is submitted that appropriate order may be passed. REASONS FOR ORDER 7. On perusal of ample photographs submitted by both side, it is crystal clear that two upper floors are almost completed and defendants no.2 and 3 have started structural foundation by installation of iron pillar for third floor. Considering these photographs submitted by plaintiff, this Court has asked the defendant no.2 to submit the photograph of the present position. Accordingly, defendant no.2 has submitted a photograph dated 27/09/2020, it has supported the case submitted by plaintiff wherein upper three floors appears to be erected by the defendant no.2 and 3. -- 3 of 7 -- Draft N/m in Stamp No. 4432/2020. 4 Order. 8. On perusal of various photographs submitted by MCGM/defendant no.1 vide Exh.3, it shows that some part of upper floors came to be demolished being illegal construction. 9. In view of first inspection report dated 05/09/2020 and notice under Section 354A of MMC Act dated 05/09/2020, the schedule of illegal construction is narrated as follows : “Schedule (Description of work) Unauthorised vertical extension on existing ground floor structure admg. (10.0 x 9.0 x 3.0 ht) mtr. approx., using M.S. Channels/Angles, B.M. Work.” 10. The photograph submitted by MCGM clearly indicate that initially unauthorized construction came to be demolished on 10/09/2020. Upon query raised by this Court in respect of demolition dated 10/09/2020, ld. Adv. V.T.Dubey for defendant no.2 and 3 skillfully replied that he will have to take instructions from client. 11. As discussed above, different photographs submitted by both side clearly indicate that there are additional floors above the ground floor came to be erected by defendants no.2 to 4. Therefore I have raised following queries to ld. Adv. V.T.Dubey for defendants no.2 to 4 i.e. a) What is the exact status of suit premises before 20 years ? b) Is there any permission of repairing sought by defendants no.2 to 4 from the MCGM ? c) Whether present construction as shown in the photographs can be captioned as ‘repairing’ ? d) Is there any permission obtained from MCGM in respect of -- 4 of 7 -- Draft N/m in Stamp No. 4432/2020. 5 Order. additional floors ? 12. Ld. Adv. V.T.Dubey for defendants no.2 to 4 skillfully avoided to these questions that he will have to take instructions from client. The argument in present case was heard on 24/09/2020 and thereafter on 28/09/2020. There is no appropriate reply given on behalf of defendants no.2 to 4. It appears that defendants no.2 to 4 have never sought any type of permission. The initial demolition processed by MCGM is not denied by defendants no.2 to 4. Even thereafter the construction of additional floors is alarming situation i.e. even though additional floors came to be erected by the defendants no.2 to 4. 13. As discussed above, despite partial demolition dated 10/09/2020, defendants no.2 to 4 have erected upper three floors. It is clear-cut violation of law. It appears that defendants no.2 to 4 does not bother to the mechanism of procedure established by law and set up prescribed in MMC Act to obtain permission etc. Therefore, there is a strong prima facie case in favour of plaintiff. 14. As observed above, it is necessary to issue prohibitory order against defendants no.2 to 4 from occupying or alienate additional floors unless Ward Officer of MCGM visits and obtain action in view of a complaint submitted by plaintiff dated 02/09/2020. Hence the order : - ORDER - 1. Draft Notice of Motion in Stamp No. 4432/2020 is made absolute. 2. Defendants no.2 to 4 are temporarily restrained from additional construction of upper floors over the suit property i.e. 85/5, New National Building, Brahman Wadi, -- 5 of 7 -- Draft N/m in Stamp No. 4432/2020. 6 Order. Pipe Road, Kurla (West), Mumbai – 400 070. 3. Defendants no.2 to 4 are further restrained by prohibitory order and not to occupy, alienate or create third party interest upon any floor above the ground floor. 4. Defendant no.1 MCGM (Officer of ‘L’ Ward) is directed to visit the suit property and prepare detail panchanama with appropriate photographs, in view of a complain submitted by the plaintiff through Adv. Wasim R. Khan, dated 02/09/2020 and obtain proper action as per law. 5. Motion at draft level is disposed off accordingly. It be register for statistical purpose. (Defendants may submit written statement to expedite hearing.) (G.G.BHANSALI) Judge, City Civil & Sessions Court, Date : 06/10/2020. Mumbai. 1. Dictated on : 05/10/2020. 2. Transcribed on : 09/10/2020. 3. Signed on : 13/10/2020. 4. Delivered to Certified : Copy Section on “CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL -- 6 of 7 -- Draft N/m in Stamp No. 4432/2020. 7 Order. SIGNED JUDGMENT/ORDER” UPLOAD DATE AND TIME NAME OF STENOGRAPHER 13/10/2020. 2.20 p.m. Miss M.A.Kulkarni Name of the Judge (with Court Room no.) HHJ Shri G.G.Bhansali. (Court Room No.11). Date of Pronouncement of Judgment/Order 06/10/2020. Judgment/Order signed by P.O. on 13/10/2020. Judgment/Order uploaded on 13/10/2020. -- 7 of 7 --
