Order Details: Notice of Motion Pdf Text: 1 IN THE BOMBAY CITY CIVIL COURT AT GREATER BOMBAY Draft Notice of Motion In Suit No 829 of 2018 Amrish Dinesh Savla, ...Plaintiff V/s Municipal Corporation of Greater Mumbai ...Defendants Advocate R.D.Thorat for plaintiff Advocate Mrs. Chavan for BMC CORAM : HIS HONOUR JUDGE SHRI. G.B.GURAO DATE : 19thJuly 2018. (Court Room No.06) O R D E R 1 Plaintiff has taken out this draft notice of motion to restrain defendant Municipal Corporation, Gr. Mumbai from demolishing the notice structure on the basis of notice dated 10/3/2018 and order dated 21/3/2018. 3 According to plaintiff, he is the tenant and in possession of godown No. 2 admeasuring 44'x61'9 with height of 31 feet up to ridge level and 26 feet at eves level consisting of ground with height of 11'x9" and loft with height of 4'x11" made of BM walls with AC Sheets roof at land bearing C.S.No. 166 of Parel Sewree Division situate at Tokershi Jivraj Road, Sewree (West), Mumbai 400 015 (hereinafter same is referred as the suit premises) 4 M/s Maniklal Mansukhbhai Pvt Ltd, are the owners and landlord of the suit premises. Plaintiff runs his business under the name M/s National Transport in the suit premises. Plaintiff has paid rent to the landlord. In the year 1992, plaintiff intended to construct a loft in -- 1 of 5 -- 2 the godown No. 2 as it has height of 31 feet up to ridge level and 26 feet up to eves level . Plaintiff made an application dated 25/4/1992 to the defendant. Accordingly, Assistant Engineer Building and Factory Department, F/South Ward of the defendants approved and sanctioned the building plan dated 29/4/1992 and permitted the plaintiff to construct a loft at the height of 11'9"from the ground level and that the height of loft was allowed at 4'x11". Under said permission the space between the upper portion of the loft beyond height of 4'X 11" up to the roof was to be kept fully closed by making it nonusable by not having any entry there at. 5 Plaintiff further stated that the loft area is 1387 sq ft as approved under plan dated 29/4/1992. As pr sanctioned plan plaintiff has constructed a Ladi coba slab at the height of 11'9" and that height of loft is maintained as 4'11 inch. The remaining portion of above height of 4'11" of loft is mae there by putting up full false ceiling. Thus plaintiff has followed the plan dted 29/4/1992.. The sanction plan permits the construction of cabin at the portion of ground floor level and that accordingly the said cabin was constructed in the year 1992. 6 Thereafter, the falls ceiling above the level of 4'11" of height of loft was damaged. Plaintiff renewed the said falls ceiling for the purpose of putting up a new fall ceiling at the said level. The plaintiff had made repair in the 1st week of March 2018. The said repairs are tenantable repairs. 7 However, the designated officer issued a notice to the plaintiff dated 10/3/2018 and thereafter passed the order without considering the reply of the plaintiff. However, thereafter as per directions of this court the designated officer passed the order. However, the designated officer did not consider the documents on -- 2 of 5 -- 3 record. The order is null and void and therefore prayed to grant ad interim relief. 8 Notice is served to defendant. Defendants filed short affidavit of Amol Koli, Jr. Engineer, B & F South ward. Defendant also produced the documents. 9 Shri R.D.Thorat Adv for plaintiff has submitted that plaintiff has not made any addition or alteration. Plaintiff has only changed the false ceiling which was damaged. The construction is not against the approved plan dated 29/4/1992. The repairs are tenantable However, defendant did not consider the said facts and documents on record and passed mechanical order. He further submitted that if an ad interim injunction as prayed is not granted then irreparable loss will be caused to the plaintiff . Hence, he prayed to grant ad interim relief. 10 Smt. Chavan advocate for defendant has submitted that the officer has given inspection and found that plaintiff made an unauthorized construction. The action taken by designated officer is legal. Hence, she prayed to refuse ad interim relief. 11 I have considered the rival submissions of both the parties. Plaintiff is the tenant of M/s Maniklal Mansukhbhai Pvt Ltd. Plaintiff pays the rent. From the documents produced by plaintiff it appears that the defendant has approved the plan by letter dated 29/4/1992. In the said approved plan there is proposed loft of fall ceiling. Accordingly plaintiff constructed the loft with falls ceiling. It appears that in the month of March 2018 plaintiff made repair of the said falls ceiling. The notice describes that plaintiff made construction of mezzanine floor. The speaking order speaks that the documents produced by plaintiff does not prove the authenticity of the notice structure. However, from the documents produced by the plaintiff it appears that the said loft alongwith falls ceiling is constructed as per the approved plan. In -- 3 of 5 -- 4 Radha Vithal Shetty,through PoA Vishwanath V Shetty V/s Municipal Corporation of Greater Mumbai & Ors, Appeal from order St No 18832 of 2017 Hon'ble High Court held that it is correct that this notice only refers to the internal partitions. These partitions do not add to the built up area and have no impact whatever on the FSI consumption. 12 Here in the present case, it is not allegation that plaintiff has made horizontal extension. Therefore, considering the facts and circumstances of the case, I find that plaintiff is entitled for ad interim relief. Hence the following order: ORDER 1 Ad interim relief is granted in terms of prayer clause (a) of the notice of motion. 2 Draft Notice of motion be registered. (G.B.Gurao) Judge, City Civil Court, Gr. Bombay. Dictated on : 19/07/2018 Typed on : 21/07/2018 Signed by HHJ. :21/07/2018 -- 4 of 5 -- 5 “ CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL SIGNED JUDGMENT/ORDER.” 24/7/2018 Mrs. S.D. Raje UPLOAD DATE AND TIME NAME OF STENOGRAPHER (H.G.) Name of the Judge (with Court Room No.) Shri. G.B.Gurao (CR.No.06) Date of Pronouncement of JUDGEMENT/ORDER 19/07/2018 JUDGEMENT/ORDER signed by P.O. on 21/7/2018 JUDGEMENT/ORDER uploaded on 24/7/2018 -- 5 of 5 --