Full Order Text
Final Order 1 · 27 Mar 2019 · CNR MHCC010035612019
Order Details: Notice of Motion Pdf Text: 1 NM 2196-11 in Suit No. 2048-11 CNR NO.MHCC01 3561219 IN THE COURT OF CITY CIVIL FOR GREATER BOMBAY AT BOMBAY NOTICE OF MOTION NO. 2196 OF 2011 IN L.C. SUIT NO. 2048 OF 2011 Mrs. Jerbanoo Aspandiar Irani …...Plaintiff Versus The Municipal Corporation of Greater Mumbai & Anr. ..... Defendant Coram : Sanjay N. Yadav, Judge (Court Room no. 05) Date : 27th March, 2019. Appearance: Adv. Ms. Amiksha Joshi for the plaintiff. Adv. Mr. Pradeep Patil for defendant/MCGM. ORDER 1. The plaintiff by this notice of motion seeks temporary injunction restraining the defendant corporation from acting upon notice dated 23.08.2011 under Section 354A of the MMC Act, 1888 and the order dated 30.08.2011. 2. It is stated that the suit premises is used for business purposes and as the building was old, the repairings were undertaken. The defendant had issued the notice under Section 354A pointing out that the unauthorized construction was in progress of mezzanine floor with ladi coba slab and M.S. angles without permission of competent authority. -- 1 of 4 -- 2 NM 2196-11 in Suit No. 2048-11 3. It is the case of the plaintiff that the mezzanine floor was already in existence and no new construction was carried out. The defendant had filed the reply to the notice of motion. It is contended that the plaintiff is not entitled for the temporary injection as prayed for. The authenticity of unauthorised construction is not proved by the plaintiff. The defendant had inspected the premises on 23.08.2011. The say points out that the inspection report would be produced in the court as and when required. It is pointed out that the plaintiff has failed to produce valid permission to be construction of suit structure. 4. Admittedly, statusquo is in operation since 13.09.2011. Admittedly, the plaintiff was issued notice on 23.08.2011. 5. In paragraph no. 'B' of the order by the MCGM it is contended that the suit inspected on 23.08.2011 and the defendant found unauthorized construction of mezzanine floor with ladi coba slab and M.S. angles in progress. It was for the corporation to show that the extent of the work carried out by the plaintiff. Merely for sake of saying that the construction was carried out would not serve the purpose in inferring that the construction of mezzanine floor was in progress. It goes to suggest the corporation has not disclosed the actual position of the notice structure. it is the pleading of the plaintiff in the plaint that the the mezzanine floor was already in existence and no construction as alleged is carried out. 6. The defendant does not seems to have made panchanama and does not seems to have taken the photograph of the suit premises. The stage of the construction is not pointed out in the notice. It is difficult to -- 2 of 4 -- 3 NM 2196-11 in Suit No. 2048-11 infer the exact position of the suit structure on the day of inspection. 7. Moreover, it is the case of the plaintiff that the mezzanine floor is and has in existence since inception. The plaintiff contended that no structural change or any new construction was carried on. The question therefore, arises as to whether the plaintiff had carried out fresh construction or the structure was already in existence. This a question to be dealt in trial . Till the determination of the said fact, the suit structure needs to be maintained in status quo. The plaintiff had made out primafacie case. The balance of convenience lies in favour of the plaintiff. The plaintiff would be put to irreparable loss, if the temporary injunction is refused. In the result, following order is passed: ORDER 1. The Notice of Motion No. 2196/2011 is allowed. 2. The defendant corporation is hereby restrained from acting upon notice dated 23.08.2011 under Section 354A of the MMC Act and the order dated 30.08.2011. 3. The Notice of Motion is disposed of accordingly. (Sanjay N. Yadav) Judge, Date : 27.03.2019 City Civil Court, Mumbai. Dictated on : 27.03.2019 Transcribed on : 28.03.2019 Signed by HHJ on : 30.03.2019 -- 3 of 4 -- 4 NM 2196-11 in Suit No. 2048-11 CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL SIGNED JUDGMENT/ORDER.” UPLOAD DATE AND TIME : 30.03.2019 at 4.20 pm. NAME OF STENOGRAPHER : Mrs. K.S.Bhosale Name of the Judge (With Court Room no.) HHJ Shri. Sanjay N. Yadav C.R. no. 05 Date of Pronouncement of JUDGMENT/ORDER 27.03.2019 JUDGMENT/ORDER signed by P.O. on 30.03.2019 JUDGMENT/ORDER uploaded on 30.03.2019 -- 4 of 4 --
