Full Order Text
Interim Order 1 · 27 Jan 2020 · CNR MHCC010008402020
Order Details: Other Pdf Text: 1 Ad-Int - Un-Reg.NM in Su.No.281-2020 IN THE CITY CIVIL COURT FOR GREATER BOMBAY AT MUMBAI. ORDER ON AD INTERIM RELIEF ON UN REGISTERED NOTICE OF MOTION IN L.C. SUIT NO. 281 OF 2020 A. Kathiresen R. Murugan, ] Aged about 76, years, an adult, ] Indian Inhabitant of Mumbai, ] Carrying on business at Shotp No.3, ] Situated at Rail View, Near Railway ] Crossing, Opp. Sawan Bazaar, ] Chembur, Mumbai400 071 ]... Plaintiff Versus MUNICIPAL CORPORATION OF GREATER ] MUMBAI, ] a body duly constituted under the ] provision of BMC Act, ] having its office at Mahapalika ] Bhawan, Mahapalika Marg, Fort, ] Mumbai 400 001 ]....Defendants Appearances: Ld. Advocate Mr. B.P.Shukla for the Plaintiff. Ld. Adv. Mrs.Khandagale for defendant/MCGM. CORAM : HIS HONOUR JUDGE SHRI U.J.MORE (Court Room no. 8) DATED : 27th January, 2020 -- 1 of 6 -- 2 Ad-Int - Un-Reg.NM in Su.No.281-2020 O R A L O R D E R O N A D I N T E R I M R E L I E F 1. Perused plaint, Notice of Motion, documents annexed to the plaint and heard Ld. Advocate for the plaintiff. The plaintiff has prayed for temporarily restrain the Defendants, their servants, agents, employees and assignees by an order and injunction of this Court from demolishing the suit premises viz. structures being Shop No.3, admeasuring 13'X6', with loft, made of B.M. Wall and A.C.Sheet roof, situated at Plot No.1A, CTS No.979(Part), Rail View, Near Railway Crossing, Opp. Sawan Bazaar, Chembur, Mumbai400 071. 2. It is stated that, pending the hearing and final disposal of the suit this Court be pleased to direct the Defendants to restore the electricity connection in the suit premises, viz. structure being Shop No.3, admeasuring 13'X6', with loft, made of B.M. and A.C.Sheet roof, situated at Plot No.1A, CTS No.979 (Part), Railway, Near Railway Crossing, Opp. Sawan Bazaar, Chembur, Mumbai 400 071. 3. Perused all documents filed by the Plaintiff alongwith plaint and Defendant strongly objected by filing affidavit alongwith documents. -- 2 of 6 -- 3 Ad-Int - Un-Reg.NM in Su.No.281-2020 5. Heard, both the sides at length. 6. Plaintiff's advocate placed reliance on Abdul H.S. Mansuri V. Municipal Corporation of Mumbai by Hon'ble Bombay High Court in First Appeal 2426 of 2005 with Civil Application No.5957 of 2005, decided on 02.03.2006. Ratio is applicable to the case in hand. 7. Ld. Adv.B.P.Shukla pithily submitted that notice u/sec.354 was issued to the owner Shri.Yatin Dosa of Plot No.1A, Railview Building and not to the plaintiff who is tenant having stall at 15 feet distance from the notice structure (i.e. Railview Building). Neither notice u/sec. 354 nor Notice u/sec. 351 of MMC Act is issued to the Plaintiff in person on 14.01.2019. Electricity Supply was disconnected of the stall which are situated in "Compulsory open space" and hence not included in area of certification. It is modes oprendi of the builder with the help of Defendant/corporation to remove the plaintiff's suit premises i.e. stall. 8. On the other side the Adv. Khandagale pithily submitted that, it is 'C1' category building. It is 30 years old building. I have gone through notice u/sec. 353(B) which is in the name of -- 3 of 6 -- 4 Ad-Int - Un-Reg.NM in Su.No.281-2020 Chairman/Secretary/Society of Shri. B.C.Patel House, Railview, Plot No.1A, Chembur, Mumbai71. The letter from Mr.Yatin Dosa i.e. reply dated 27.03.2019 Mr.Samir Mhate, Structure engineer has filed structural report, which transpires condition of a building at para 16 under head critical observation to "Structure is surrounded by Stalls inside Compound". It is supported by letter dated 14.09.2019 sign by designated officer of corporation alongwith list of tenants at serial no.17 A. Kathiresen, Room No. Ground floor/Stall No.3, Carpet area Nil, "The said stalls are situated in compulsory open space and hence not included in area certification". Both documents are prima facia supports the contention of plaintiff that these stall are not part of notice structure premises i.e. Railview building and suit premises is at certain distance from Railview building in open premises. 9. Therefore, prima facia the action itself illegal for cutting Electricity supply of stall which in the possession of the plaintiff. There appears substance in the above contentions of the plaintiff. Therefore, plaintiff is entitled for adinterim relief. Hence I proceed to pass following order: -- 4 of 6 -- 5 Ad-Int - Un-Reg.NM in Su.No.281-2020 ORDER 1. Adinterim relief is granted till next date. 2. Defendant is directed to restore electricity supply in suit premises only. (U.J.More) Judge, City Civil Court, Date : 27.01.2020 Gr. Mumbai. Dictated on : 27.01.2020 Transcribed on : 27.01.2020 Signed by HHJ on : 27.01.2020 -- 5 of 6 -- 6 Ad-Int - Un-Reg.NM in Su.No.281-2020 CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL SIGNED JUDGMENT/ORDER.” UPLOAD DATE AND TIME : 01.02.2020 at 11.00 a.m. NAME OF STENOGRAPHER : Mr.G.R.Suryawanshi Name of the Judge (With Court Room no.) HHJ Shri. U.J.More C.R. no.08 Date of Pronouncement of JUDGMENT/ORDER 27/01/2020 JUDGMENT/ORDER signed by P.O. on 27/01/2020 JUDGMENT/ORDER uploaded on 01/02/2020 -- 6 of 6 --
