Full Order Text
Final Order 1 · 15 Dec 2021 · CNR MHCC010004462019
Order Details: Other Pdf Text: 15.12.2021 50 CORAM: H.H.J. SHRI. A. G. SANTANI (C.R.NO.11) SU 2283/18 NM 155/19 C/S 2175/18 Adv. Mr. Pratap Singh for plaintiff is present. Adv. Mr. Khandagale for Defendant/MCGM is present. Adv. for the defendant orally requested for time to verify the aspect as regards regularisation of the structure. The matter is adjourned shortly. KB LO at 4.30 pm. Same appearance as above. The ld advocates for the sides submitted that the structure has been regularised and therefore, the suit may be disposed off finally. Heard both sides. The record reveals that in view of the roznama dtated 17.03.2021, Mr. Jagdish Sarang, SubEngineer, Building Proposal, for the defendant submitted that, the area of notice structure is regularised as per sanctioned plan. Today, Adv. for the plaintiff and defendant brought the document filed alongwith the list of document Exh. 3 to the notice of this Court. It fortifies the regularisation of the area of notice structure. In view of changed circumstance, as is submitted by the advocates for both the sides, nothing remains to proceed with the suit. This position is also admitted to the advocates of the both sides. In the result, the suit, NM 155/2019 and C/S 2175/2019 alongwith all the pending applications stand disposed off. The parties to bear their own costs. Bill of cost be drawnup accordingly. Judge -- 1 of 1 --
