Full Order Text
Final Order 1 · 12 Feb 2020 · CNR MHCC010000462018
Order Details: Notice of Motion Pdf Text: 1 IN THE COURT OF CITY CIVIL COURT AT GR.BOMBAY NOTICE OF MOTION NO.29 OF 2018 IN SUIT NO.4839 OF 2012 Mr.Lalji Ramawadh Gupta ..Plaintiff Versus Mrs.Hirabai Suresh Khedkar (deceased) and 1(a) to 1(d) ..Defendants Ld. advocate Dubey for the plaintiff Ld. advocate Arvind Taral for defendants CORAM: HIS HONOUR JUDGE SHRI M.SALMAN AZMI DATE: 12/02/2020 ORAL ORDER 1. This notice of motion is tendered by the defendants for directing to the Electricity Authority to restore the old or new electric meter in the name of the defendants which was removed by the Reliance Energy Limited in the month of November-2017. 2. Heard. 3. The contention of the defendants is that Reliance Energy Limited has removed their existing meter which was granted to the defendants in the month 2 MHCC01-00046-2018 -- 1 of 4 -- 2 of October 2017. Defendants have also written letter to the Reliance Energy not to remove the old electricity meter and defendants have no objection to install new electricity connection in their name. Despite all the two letters, Reliance Energy Ltd., have disconnected the exisiting electricity meter in the name of their late mother and installed the electricity meter in the name of the plaintiff. The act of Reliance Energy is arbitrary and without following due process of law. The defendants do not dispute to install the electricity meter in the name of the plaintiff. Therefore the present notice of motion is filed by the defendants. 4. The notice of motion is opposed by the plaintiff that defendants have not made Reliance Energy as a party. In their absence no orders can be passed against Reliance Energy. The defendants are having electricity meter in the name of their deceased mother adjacent to the suit premises and defendants are in possession of the premises admeasuring 5x8 feet and there is common wall between the suit premises and adjacent premises. One meter is standing in the name of deceased mother of defendants and defendants are using the said premises and there is no need to grant the separate electricity meter for the said premises. This Court 3 MHCC01-00046-2018 -- 2 of 4 -- 3 passed an order in Notice of motion no.1460 of 2014 restraining the defendants not to interfere in the process of installation of the electricity meter in the suit premises by the authorities in the name of the plaintiff. Accordingly, the order was complied with by the Electricity Authority. The mezzanine floor premises is in possession of the defendants. Defendants are getting the electricity supply through the adjacent premises. Hence, prayed for rejecting the notice of motion. 5. At the outset the suit is not filed by the defendants. There is no counter claim filed by the defendants. The suit is for specific performance of the contract. The interim relief in the suit is always in aid to the main relief. The defendants are claiming restoration of old or new electricity meter. The Reliance Energy is not a party to the suit. In the absence of Reliance Energy, no effective order can be passed. The relief is in the nature of mandatory i.e. for the installation of old or new meter in the name of defendants. The direction is required to be given to the Reliance Energy. In a suit filed by the plaintiff the defendants are seeking interim relief that too mandatory relief. The mandatory relief cannot be granted only in exception circumstances. Exceptional case is neither pleaded nor prima facie established. Even there is 4 MHCC01-00046-2018 -- 3 of 4 -- 4 nothing in the affidavit to show that which meter was removed and when it was removed. No case is made out for grant of relief. Thus, this notice of motion needs no consideration. Hence, it is expedient to pass following order:- ORDER 1. N/M No.29/2018 stands rejected. 2. Costs in the cause. 3. N/M No.29/2018 is disposed off accordingly. 12/02/2020 M.SALMAN AZMI CITY CIVIL COURT, GR.MUMBAI. Dictated on : 12/02/2020 Transcribed on : 28/02/2020 Signed on : 03/03/2020 'CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL SIGNED JUDGMENT/ORDER”. 04/03/2020 at 4.00 pm. MRS.T.C.KAMBLE Name of the Judge HHJ SHRI M.S.AZMI, CR NO.1 Date of Pronouncement of judgment/ order 12/02/2020 Judgment and order signed by P.O. 04/03/2020 Judgment/order uploaded on 04/03/2020 MHCC01-00046-2018 -- 4 of 4 --
