Full Order Text
Interim Order 1 · 04 Jan 2020 · CNR MHCC010000152020
Order Details: Other Pdf Text: 1 Ad-Int - Un.Reg.NM in Su.No.08-20 IN THE CITY CIVIL COURT FOR GREATER BOMBAY AT MUMBAI. ORDER ON AD INTERIM RELIEF ON UN REGISTERED NOTICE OF MOTION IN L.C. SUIT NO. 08 OF 2020 (CNR no. MHCC010000152020) (Matter pertains to C.R.No.06) MAYUR KISHOR PAREKH, ] Adult, Age 52 Yrs. Occ. Business ] having business place at Standard ] Paper Box Bldg., Shankarrao Naram ] Path, Lower Parel (W), ] Mumbai400 013 ]... Plaintiff Versus The Mumbai Municipal Corporation ] of Greater Mumbai, a Corporate ] Body under the provisions of ] M.M.C Act 1888 and having their ] office at Mahapalika Marg, Fort, ] Mumbai400 001 through the Asst. ] Municipal Commissioner, 'G' South ] Ward Municipal Office, N.M. Joshi Marg ] Elphinstone, Mumbai400 018 ]....Defendants Appearances: Ld. Advocate Mr. D.A.Barot for the Plaintiff. Ld. APP Sutar for defendant/MCGM. CORAM : HIS HONOUR JUDGE SHRI U.J.MORE (Court Room no. 8) (I/c of C.R.NO.6) DATED : 04th January, 2020 -- 1 of 7 -- 2 Ad-Int - Un.Reg.NM in Su.No.08-20 O R A L O R D E R O N A D I N T E R I M R E L I E F 1. Perused plaint, Notice of Motion, documents annexed to the plaint and heard Ld. Advocate for the plaintiff. The plaintiff has prayed for temporary injunction restrained Defendant/MCGM for demolishing the part of the suit premises i.e. Terrace Structure area 93'.00" X 72'.00" having height (10'.00" to 08'.06" Sloping Roof) till final disposal of the suit with M.S. Angels & G.I. Sheet Roof on the terrace of Bhusa Industrial Estate, Shankarrao Naram Path, Lower Parel, Mumbai, Maharashtra 400030. 2. Ld. Advocate for the Plaintiff has submitted that, he is doing his business of Standard Paper Box factory in the entire building. He never carried out any alterations and additions or constructed any shade admeasuring 93'.00" X 72'.00" on the terrace of Standard Paper Box building (hereinafter called as a Suit premises). The Defendants/MCGM have issued notice u/s. 351 bearing No.ACGS/351/J&N/1026/3F 0809 dated 03.06.2008 to the Plaintiff. He replied to the notice again he received notice u/s 351 bearing No.GS/DO2GS/191/351MMC ACT/GS131NO1/31082016 dated 31 st August, 2016. He challenged this notice by filing L.C. Suit 1314 of 2017 in the same court. This Court was pleased to passed order by direction -- 2 of 7 -- 3 Ad-Int - Un.Reg.NM in Su.No.08-20 to the Plaintiff to submit "Copy of reply and documents and defendants shall considered the said reply and documents and shall pass suitable orders and protect the structure for period of 15 days from receipt of the adverse order". Plaintiff complied the order of the Court. 3. It is further contended that on 12.01.2019 defendants requested by the notice to the plaintiff for site inspection it was completely in presence of Plaintiff. Hearing was done before defendants 'G' South office defendant issued notice under section 353B of MMC Act to submit structural audit report dated 13.11.2019. On 9.12.2019 officer Mr. Ghatge 'G' South Visited suit property and inquire about notice structure plaintiff received speaking order of 20.12.2019 on 21.12.2019 with directions to remove "Notice Structure". Plaintiff in support has filed the copy of revision assessment according to plaintiff the revision page No. 19 in list of document (Page No.3 revision assessment) transpires that the corporation has assessed the terrace structure and also change of user and accordingly calculated the value of the suit premises the terrace structure is authorized and with malafied intention the plaintiff issued notice. 4. On the other side defendant denied all the allegations -- 3 of 7 -- 4 Ad-Int - Un.Reg.NM in Su.No.08-20 submitted by the defendant that terrace should be open to sky. No permission sought for the construction of the terrace in the suit primises the structure constructed is contrary to the section 342 and 347 of the MCGM Act, 1888. The notice u/s 351 for unauthorized structure is legal just and proper. Plaintiff does not have any approved plan. The assessment at revised assessment document can be made by the corporation for illegal construction but unless it is sanction by the proper authority. It cannot be term as 'Legal Structure'. 5. Heard both the sides, It is transpires from the order passed in L.C. Suit. No. 1314 of 2017 on Adinterim application. The Ld.Judge has specifically mentioned that the plaintiff challenged notice of defendants regarding unauthorized erection of shade admeasuring 93'.00" X 72'.00" at the suit premises on the terrace. as the plaintiff did not file reply to the notice of the defendant. Hence in view of the case law of "Sopan Maroti Thopte, Para 19 the court was pleased to direct plaintiff to submit copy of reply, documents before designated officer within 7 days from the date of order dated 23.06.2017. 6. The record reveals that the reply filed by the plaintiff before the documents at transpires specifically in the speaking order -- 4 of 7 -- 5 Ad-Int - Un.Reg.NM in Su.No.08-20 dated 20.12.2019 but order reflects that the inspection has issued by Assistant assessor and Collector 'G' South which clearly mentioned that there is revision of assessment due to addition and alteration and the premises in the reference is ground plus two factory building where plaintiff constructed it with terrace of portion with AC sheet roof and iron grid. These documents does not prove that the notice structure i.e. terrace shade erected is a false tolerated category i.e. in existence proper before datum line i.e. 01.04.1962. I have gone through copy of revision statement which transpires that the corporation has assessed the value of the notice structure. But it no where supports the contention of the plaintiff that this notice structure is authorized by the defendants with a proper sanction within purview of MMC Act. There is a not single document filed on record to show that the "notice structure" is authorized. It is before datum line from 01.04.1962. Therefore, there is no substance in the contention of the plaintiff that he is entitled for adinterim relief against the defendant to protect suit premises i.e. "notice structure". 7. As the plaintiff has not produced any document showing authorization of the notice structure i.e. terrace structure (suit premises) or that it is tolerated or protected structure. Therefore, Ad -- 5 of 7 -- 6 Ad-Int - Un.Reg.NM in Su.No.08-20 interim relief is refused. Hence, following order is passed: ORDER Adinterim relief is rejected. (U.J.More) Judge, Date : 04.01.2020 City Civil Court, Gr. Mumbai. Dictated on : 04.01.2020 Transcribed on : 04.01.2020 Signed by HHJ on : 06.01.2020 -- 6 of 7 -- 7 Ad-Int - Un.Reg.NM in Su.No.08-20 CERTIFIED TO BE TRUE AND CORRECT COPY OF THE ORIGINAL SIGNED JUDGMENT/ORDER.” UPLOAD DATE AND TIME : 07.01.2020 at 11.30.00 p.m. NAME OF STENOGRAPHER : Mr.G.R.Suryawanshi Name of the Judge (With Court Room no.) HHJ Shri. U.J.More C.R. no.08 Date of Pronouncement of JUDGMENT/ORDER 04/01/2020 JUDGMENT/ORDER signed by P.O. on 06/01/2020 JUDGMENT/ORDER uploaded on 07/01/2020 -- 7 of 7 --
