Full Order Text
Interim Order 1 · 30 Apr 2026 · CNR DLNW030009252026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 563/26 DHRUV KUMAR GOEL Vs. SHRI HANUMAN MANDIR SABHATHROUGH ITS PRESIDENT 30.04.2026 Fresh suit received from filing counter. It be checked and registered as per rules. Present: Mr. Amit, Ld. Counsel for the plaintiffs. Heard. Record perused. Application under Section 91 CPC also considered. Para no. 9 of order dated 14.09.2023 passed by the Ld. Court concerned in CS SCJ 853/23 is clear where it was provided that no fresh construction, either independently or under the garb of repair or renovation shall be undertaken at the vacant temple site without proper permission from DDA / Authorities concerned. The order also noted that in case the same is done, the plaintiff would be well within its rights to avail remedies as per law. In the present suit, it has been contended that without obtaining any permission, fresh construction activity is being undertaken in an unauthorized manner. The plaintiff herein was the plaintiff in the earlier suit proceedings as well. The remaining two plaintiffs are also stated to be residents of the same locality, regularly visiting the temple in question, apart from being members of Harsh Vihar Coperative Society. Section 91 provides for filing of proceedings on the basis of real or anticipated public nuisance, which given the facts before the court, more particularly in view of order dated 14.09.2023, as noted above, is prima facie made out. In view of the above, leave under Section 91 CPC is granted. -- 1 of 2 -- Since the suit is one for injunction only, requirement for statutory notice is dispensed with considering the nature of averments taken. Let summons be issued to the defendants on filing of PF / Speed Post / through all prescribed modes, including electronically, returnable for NDOH. Re-list on 11.05.2026. Summons be given dasti as well. (Gaurav Sharma) JSCC-cum-ASCJ-cum-Guardian Judge North West/Rohini Courts/Delhi 30.04.2026 -- 2 of 2 --
