Full Order Text
Order 7 · 17 Apr 2025 · CNR DLNW030004112024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 36 CS SCJ 282/24 PUNEET AGGARWAL Vs. SATBIR SINGH 17.04.2025 Present : Sh. Manak Budhiraj, Ld. Counsel for plaintiff through VC. Defendant no. 1 (husband of defendant no. 2) is present through VC. Matter is passed for post lunch session. (Priyanka Rajpoot) SCJ-cum-RC, North-West, Rohini Courts, Delhi/17.04.2025 Proceedings from 4:15 to 4:45 PM Present : Sh. Manak Budhiraj, Ld. Counsel for plaintiff through VC. None for defendant. 1. The matter is listed for orders on the application u/O 39 Rule 1 & 2 r/w section 151 of CPC filed by the plaintiff seeking following reliefs: (i) to restrain the defendants from creating obstruction or blockage in the common passage shown in red colour in the site plan (inadvertently referred as green colour in the application); (ii) to restrain the defendants from tresspassing on the property of the plaintiff and; (ii) to restrain the defendants from stopping or locking the lift installed in the buidling. -- 1 of 5 -- -: 2 :- 2. It is not in dispute that the plaintiff is the owner of the third floor alongwith roof rights of property bearing no. BD-65, Pitampura, Delhi-110034 and has common rights in the entrance passage and other common areas of the building. It is also not disputed that the defendants are the joint owners and in possession of the upper ground floor and first floor of the said property. 3. The plaintiff has alleged that on 16.01.2024, defendant no. 1 intentionally blocked waste pipe outlet of the plaintiff’s bathroom from the outside and unauthorizedly covered the area in the stilt parking, which allegedly caused nuisance and blockage in the common passage. It is also stated that the main drain is accessible through the stilt parking area, which is meant to remain open for the common use and maintenance purpose of all occupants of the building. 4. It is further stated that the lift was locked by defendant no. 1 which caused incovenience and hardship to the plaintiff, who is in occupation of third floor. In view of the obstruction caused by defendants, the plaintiff called PCR but no needful was done by the police. 5. On the other hand, defendant no. 1 has denied the allegation and claimed that it is the plaintiff who is at fault. He alleged that the labourers called by the plaintiff misused the lift and left debris which led to blockage of the sewage. Further, the -- 2 of 5 -- -: 3 :- plaintiff unilaterally changed the lift system from manual to card operated programme and also closed the water tank valve. 6. Defendant no. 1 also alleged that brother of plaintiff threatened him which led to involvement of police. Therefore, he has also filed a counter claim seeking relief of permanent injunction against the plaintiff. 7. Upon scrutinizing the record, it is evident that both the parties live in the same building and have levelled allegations against each other, which will be adjudicated during the trial. However, at this stage, prima facie, case is made out in favour of the plaintiff. 8. It is not disputed that the area shown in red colour in the site plan contains water and drainage lines that may require periodic maintenance and emergency repairs. Preventing access to this area may result in disruption of day-to-day maintenance of water pipelines and damage to the plaintiff’s property. Similarly, the alleged act of locking the lift by the defendants, if repeated can cause inconvenience to the plaintiff, who is in possession of third floor. 9. The court is of the considered opinion that irreparable injury would be caused to the plaintiff, if he is denied access to the common passage and lift, as he will not be able to maintain sanitation and to access his own residence. Moreover, the balance -- 3 of 5 -- -: 4 :- of convenience also lies in favour of the plaintiff as the relief sought by him merely seeks to maintain peace and to prevent the possibility of escalation of dispute. 10. Accordingly, following interim directions are passed: a) Defendants are directed to provide access to the common passsage as shown in red colour in the site plan to the plaintiff for maintenance purpose. b) Plaintiff is permitted to carry out necessary repairs in the said area as and when required. However, he shall inform the defendants at least one hour in advance prior to carrying out such repairs. c) Upon such intimation, the defendants shall co- operate and allow access to the plaintiff without creating any obstruction. d) Defendants are hereby restrained from locking, diabling or otherwise obstructing the use of the lift installed in the abovesaid property so that the plaintiff can access to his floor. e) The defendants are hereby restrained from entering the plaintiff’s property i.e. the third floor without his consent. -- 4 of 5 -- -: 5 :- Accordingly, the abovesaid application is disposed off. Put up for framing of issues on 12.08.2025. (Priyanka Rajpoot) SCJ-cum-RC, North-West, Rohini Courts, Delhi/17.04.2025 -- 5 of 5 --
