Skip to main content
Court Order

Interim Order 5

CNR DLNW01003572202611 Jul 2026
Back to Case

Full Order Text

Interim Order 5 · 11 Jul 2026 · CNR DLNW010035722026

Order Details: COPY OF JUDICIAL PROCEEDINGS
Pdf Text: 7 CS DJ 279/26
PRAVEEN UPADHYAY VS. VAIBHAV
11/07/2026
Present: Sh. Ankur Aggarwal, Ld. Counsel for plaintiff with
plaintiff in person.
Sh. R.K. Thakur, Ld. Counsel for defendant no. 1 and
proposed defendant Smt. Neeru.
Sh. Hitesh Kumar, ld. Counsel for MCD (fresh
vakalatnama filed)
Matter is fixed for consideration on the application of the
plaintiff under order 1 rule 10 CPC seeking impleadment of Smt. Neeru
as party to the suit.
Heard arguments on the said application. Since, Smt. Neeru
is the owner of the property in question, she is necessary and proper
party to the suit, accordingly she is impleaded as defendant no. 3 in the
present suit. Amended memo of parties be filed on or before the NDOH.
The application of the plaintiff under order 1 rule 10 CPC is disposed
off.
It is submitted by the counsel for plaintiff that plaintiff is
residing on the first floor of the suit property, while the defendant no. 1
and 3 are residing at the second floor of the said property. It is submitted
that due to leakage from the bathroom and kitchen of the defendant no. 1
and 3, seepage is being caused in the floor of the plaintiff. It is submitted
by the plaintiff and his counsel that they are ready to get the necessary
repair work done to stop the seepage which is being caused from the
-- 1 of 2 --
portion / floor of the defendant no. 1 and 3. It is submitted that for this
purpose access be granted to the plaintiff and the mason / plumber to
carry out the repair work.
The same is agreeable to defendant no. 1 and 3, however, it is
submitted that the repair work be done within a fixed time frame and the
entire expenses shall be borne by the plaintiff and he shall not claim any
damages from them. The same is agreeable to the plaintiff and his
counsel.
Accordingly, the plaintiff is at liberty to get the ncessary
repair work done to rectify the seepage which is being caused from two
bathrooms and portion of kitchen of defendant no. 1 and 3. The plaintiff
shall carry out the necessary repair work of each bathroom one by one
so that no inconvenience is caused to defendant no. 1 and 3. The
defendant no. 1 and 3 shall allow the access to the relevant portion to the
plaintiff and his plumber / mason where the repair work is to be done
between 9 am to 5 pm w.e.f. 20.07.2026 till NDOH. All the expenses for
the repair work shall be borne by the plaintiff and no damages shall be
demanded/ claimed by the plaintiff from defendant no. 1 and 3.
Put up for report before the court on 13.08.2026.
Copy of the order be given dasti.
(KIRAN GUPTA)
DJ-02, N/W, ROHINI COURTS
DELHI/11/07/2026
-- 2 of 2 --

TrustJury presents public court-record information for legal discovery and reference. Record availability and detail can vary by source and case.