Skip to main content
Court Order

Final Order 8

CNR DLNT03002779202323 Mar 2024
Back to Case

Full Order Text

Final Order 8 · 23 Mar 2024 · CNR DLNT030027792023

Order Details: COPY OF JUDICIAL PROCEEDINGS
Pdf Text: CS SCJ 1441/23 Atul Garg Vs. Preeti Grewal & Ors.
23.03.2024
ORDER
1. Vide this order, I shall decide the application u/o 7 rule 11 r/w
section 151 CPC moved on behalf of the defendants no.2.
Argument was already heard.
BRIEF FACTS OF THE PRESENT CASE AS PER PLAINT
2. Brief facts of the present case are that, plaintiffs are member of
Revanta CGHS Ltd. now known as Aman Apartment, Sector-13, Rohini,
Delhi (hereinafter referred as Said Society). It is further averred that the
defendant no.1 & 2 are permanent resident of Aman Apartment, Sector-13,
Rohini, Delhi and Defendant no.3 is the president of Aman CGHS Ltd. and is
permanently resided at the respective address mentioned in the memo of
party. It is averrred that defendant no. 4, being a civic agency, Defendant No.
5 is responsible for maintaining, and supply of electricity.
It is further averred that since the ownership & possession of the Said
Flat, plaintiffs has fundamental rights to enjoy the easementary rights viz
Right of Air, Right of Water, Right of Sunlight, Right of common area etc.
associated with the said Flat in terms of sanctioned plan of said society
passed by DDA and duly cared by defendant no. 4 on regular basis. It is
further averred that unaware of criminal conspiracy hatched by the defendant
No.1 & 2 in collusion with defendant No.3 with a sole intention to deceive
and usurp the plaintiff's rights associated with the said flats, had malafidely,
dishonestly, fraudulently prepared a false document i.e. undated, unstamped
CS SCJ 1441/23 Atul Garg Vs. Preeti Grewal & Ors. Page No. 1 of 11
-- 1 of 11 --
NOC in favour of defendant no.4 for installation of elevator and by falsely
showing the alleged NOC issued with the consent of the residents of Aman
CGHS Ltd. It is further averred that plaintiff no.1 by smelling the
cunningness of the defendant No.1, 2 & 3 have served the legal notice dt.
07.11.2023 on defendants through counsels Sh. Anand Parkash Jain & Sh.
Punit Jain via speed post by requesting them to remove an illegal
construction, electricity connection etc. for installation of said elevator along
with damages and cost towards sending of legal notice, within a period of 15
days of receipt of this notice. It is further averred that defendants, after
receiving the abovesaid legal notice, have replied in an affirmative way and
further assured the plaintiffs that neither they have raised any illegal
construction for installation of elevation near the said flats nor they got the
electricity connection. It is further averred that surprisingly on 20.12.2023,
defendant no. 1 to 3 along with the labours came with some heavy
construction equipment like hammer/ heavy machinery, laborer etc. for
demolishing the old structure and to raise an unauthorized- construction for
elevator which severely damaged the plaintiff’s property, drainage system,
IGL pipe line as well as obstruct the easementary rights attached with the said
flats and further caused threat to the life and liberty of plaintiffs family
members which goes to such an extent that any untoward incident may
occurred. It is further averred that plaintiffs immediately approached the
SHO, PS KN Katju Marg and further called the PCR by dialing 112 number
at 11.21 am & 11:37 am on 20.12.2023 but neither the PS KN Katju Marg nor
PCR did take any action against the wrongdoer, on the contrary, defendant
no.1 to 3 was directed to commence an unauthorized construction on
23.12.2023. Moreover, plaintiffs also approached the MCD regarding an
CS SCJ 1441/23 Atul Garg Vs. Preeti Grewal & Ors. Page No. 2 of 11
-- 2 of 11 --
unauthorized construction but they also did nothing. It is further averred that
defendant no.1 & 2, being resident of Flat No A-20, TF & Flat No. A 24, TF
of said society, malafidely in collusion with defendant no.3 resident of Flat
No. A-36, TF of said society, have deliberately created nuisance by raising an
illegal construction and further obtaining the illegal electricity connection
from defendant no. 5 for installing a lift without having sanctioned plan from
defendant no. 4 as well as non obtaining the consent from the neighbouring
residents which severely violated the easementary rights of the residents as
well as defacing the said society. It is further averred that the Plaintiffs along
with other residents of the said society contacted and had word with the
defendants many times but the defendant no.1 to 3 deliberately avoided the
plaintiffs and tried to linger on the issue on one pretext or the others. It is
further averred that defendants have no locus standi to indulge in such an
illegal activity for causing a wrongful gain to defendants and further cause a
wrongful loss to plaintiffs. The abovesaid acts amounts to a criminal breach
of trust for which defendants shall be held responsible to make good the loss
suffered to plaintiffs. It is further averred that the plaintiff’s has requested the
defendants many a times not to indulge in such type of practice but the
defendants has finally refused to do so hence the present suit.
3. On the basis of averment mentioned in the plaint, Plaintiff claimed
following reliefs:-
A). to pass a decree of mandatory injunction by directing the defendant no.
1 to 3 for immediately stopping the demolition of old structure near the said
flats and to restore the damaged portion to its original shape as shown in the
photograph near the said flats of the society, be passed in favour of the
plaintiff and against the defendants.
CS SCJ 1441/23 Atul Garg Vs. Preeti Grewal & Ors. Page No. 3 of 11
-- 3 of 11 --
b) to pass a decree of permanent injunction restraining the defendants, his
agents, servants, family members etc. from raising an unauthorized
construction for installing an elevator without having sanctioned plan from
defendant no. 4 and further interfering into peaceful and vacant possession
near the said flats; forcibly, illegally and with the help of his agents, servants
and family members etc. in any manner whatsoever, be passed in favour of
plaintiffs and against the defendant with costs, in the interest of justice;
c) to pass a decree of mandatory injunction by directing the defendant
no.5 not to install an electric connection without having sanctioned plan from
defendant no. 4/ NOC from the neighbouring residents of the said society, be
passed in favour of the plaintiff and against the defendants.
D) to pass a decree of mandatory injunction by directing the defendant
no.1, 2& no.3 to remove an illegal construction for installing a lift without
sanctioned plan from defendant no. 4 / NOC from the neighbouring residents,
be passed in favour of the plaintiffs and against the defendants.
E) to award the cost of litigation in favour of the plaintiff against the
defendants.
f) any other relief which this Hon'ble court deems fit and proper may
kindly be granted in favour of the plaintiff and against the defendants.
BRIEF FACTS OF THE APPLICATION FILED U/o 7 Rule 11 CPC BY
THE DEFENDANT NO. 2
4. The brief facts of the present application is that the suit filed by
the plaintiff is based upon conjectures and surmises and the plaintiffs have
deliberately and intentionally suppressed the material facts from the Hon'ble
court in order to procure a favorable order in their favor.
CS SCJ 1441/23 Atul Garg Vs. Preeti Grewal & Ors. Page No. 4 of 11
-- 4 of 11 --
It is averred that the plaintiff has mislead the Hon'ble court by stating
that the defendant no.1 and 2 conspired with the defendant no.3 and prepared
a forged and fabricated document i.e. the NOC in favour of the defendant
no.4. Moreover, the defendant no.3 i.e. the President of the RWA has already
filed his WS in the court where in he has specifically stated that the defendant
no.3 in the capacity of the President of the society has issued the NOC for the
installation of the lift after carefully considering the grievance and the
hardships of the residents of the society (Aman Apartments). This clearly
shows that the plaintiffs are misleading the Hon'ble court.
It is further averred that the plaintiffs have mislead the Hon'ble court by
stating in para no. 9 of their plaint, that the defendant no. 1 & 2 in collusion
with the defendant no.3 have raised an illegal construction and had also
obtained the illegal electricity connection from the defendant no.5 and had
further alleged that the applicant does not even have the sanctioned plan from
the defendant no.4 (MCD). On the contrary the applicants have not raised any
illegal construction (same is evident from the photographs of the site
Annexed along with the WS) nor they have obtained any illegal electricity
connection from the defendant no.5 as alleged by the plaintiffs. Further, the
defendant no. 4 in their Status report has clearly stated that they have issued
the NOC to the Defenant no. 1 and 3 for the installation of lifts. And as such
from these facts it is very much evident that the plaintiffs are misleading the
Hon'ble court by presenting false, frivolous and baseless pleadings which
should not be entertain by the Hon'ble court.
It is further averred that it is significant to mention here that the
Hon'ble court in order to ascertain the true facts of the case had directed the
MCD vide its order dated 18/01/2024 to file the status report in order to
CS SCJ 1441/23 Atul Garg Vs. Preeti Grewal & Ors. Page No. 5 of 11
-- 5 of 11 --
ascertain "whether MCD has granted sanction for installation of lift in the suit
property". And in the status report so filed by the MCD on 1/02/2024 they
have clearly stated that "The permission for installation of lift sought by the
owners of flat No. A-19, A 20 & A 24 of the Aman Apartment was granted by
the MCD after following the due process of law and as per policy for the
installation of the lift". And thus negates the frivolous contentions of the
plaintiff's that the applicants are constructing the lift without having the
sanction plan/NOC.
It is further averred that from the contentions so raised above it is very
much evident that the plaintiffs have not approached the Hon'ble court with
clean hands as they have deliberately and intentionally suppressed the
material facts from the Hon'ble their favor. Hence, this application. It is
prayed that the court may kindly be pleased to dismiss the suit so filed by the
plaintiff as per the provision of Order VII Rule XI CPC, as they have not
approached the Hon'ble court with clean hands.
REPLY ON BEHALF OF NON-APPLICANT/PLAINTIFF TO THE
APPLICATION U/O 7 R 11 CPC
5. It is submitted that all the Facts, averments, contentions,
allegations, statements and submissions made by the Applicant/Defendants in
the aforesaid application are specifically denied at the very outset unless
admitted herein under. It is submitted that applicant puts to strict proof how
the plaintiff procured a favourable order from the Hon'ble Court by
suppressing the material facts. Moreover, perusal of entire application fails to
disclose the maintainability of present application and is beyond the scope of
order 7 Rule 11 CPC. Therefore, the present application deserves to be
CS SCJ 1441/23 Atul Garg Vs. Preeti Grewal & Ors. Page No. 6 of 11
-- 6 of 11 --
dismissed with heavy costs. It is further submitted that applicant puts to
strict proof regarding the alleged averment. Moreover, registered RWA of
Aman Appartment, Sector-13, Rohini, Delhi, vide Letter dt. 21.12.2023, have
specifically mentioned that they have not issued any NOC in favour
defendant no. 4 MCD for installation of lift for the simple reason is that
structure stability of the society is weak and it may cause heavy damage to
the society. Therefore, the present application deserves to be dismissed with
heavy costs. Copy of registered RWA Letter dt. 21.12.2023 of Aman
Appartment, Sector-13, Rohini, Delhi is already attached. It is further
submitted that applicant keeps on changing his stance on one hand applicant
alleges there was no construction and no electricity connection etc. on the
other hand applicant demolishes the old structure by digging the common
area as shown in the photographs filed with plaint, applied for the electricity
connection as mentioned in WS filed by TPDDL meter, obtained NOC from
MCD without site verification as well as structure stability certificate on the
basis of forged and fabricated NOC issued by self declared president of the
society i.e. defendant no.3 herein. Therefore, the present application deserves
to be dismissed with heavy costs. 3 D animation for installation of lift is
already attached. It is submitted that applicant keeps on changing his stance
on one hand applicant alleges due process of law has been complied while
granting conditional permission by MCD on the other hand applicant fails to
bring on record the requisite permissions, certificate, coment viz structure
stability certificate, fire safety norms. consent from the residents of the
society, non hindrance of easementry rights, sanctioned plan from DDA, how
far the lift from blind wall, site verification report, inspection report, NOC
from registered welfare society ete.. In Catena of Judgments Hon'ble
CS SCJ 1441/23 Atul Garg Vs. Preeti Grewal & Ors. Page No. 7 of 11
-- 7 of 11 --
Supreme Court held that The who approaches the court must come with clean
hand". It is worth to mention here that applicants admittedly have different
versions and keep on changing his stance. Therefore, the present application
deserves to be dismissed with heavy costs. It is submitted that the present
application U/O 7 Rule 11 CPC deserve to be dismissed with exemplary cost.
It is prayed that this Hon'ble Court may graciously be dismiss the present
application U/O 7 Rule 11 CPC with exemplary cost, in the interest of justice
and to pass any other or further orders as this Hon'ble Courts deems fit and
proper in the facts and circumstances of the case, in favour of Plaintiff and
against the defendant.
ANALYSIS AND FINDINGS
6. In the case in hand essence of plaintiffs case is that defendant
No.1 and 2 in collusion with defendant No.3 with intention to deceive and
usurp the plaintiffs right i.e. right of Air, Right of Water, Right of Sun Light
right of common area had malafidely, dishonestly, fraudulently prepared a
false document i.e. undated, unstamped NOC in favour of defendant no.4 for
installation of elevator and by falsely showing the alleged NOC issued with
the consent of the residents of Aman CGHS Ltd. It is further case of plaintiff
that defendant No.1 and 2 is doing unauthorised construction of elevator
without any sanctioned plan obtained from defendant No.4. It is further case
of plaintiff that defendant No.1 and 2 has been installing elevator without
taking consent of neigbouring residents which severely violated the
easementary right of resident as well as defacing the above society. It is
further case of the plaintiff that due to the illegal construction being done by
defendants wrongful loss was caused to plaintiff. It is further case of the
CS SCJ 1441/23 Atul Garg Vs. Preeti Grewal & Ors. Page No. 8 of 11
-- 8 of 11 --
plaintiff that due unauthorised construction of elevator plaintiffs property was
damaged.
7. It is relevant to note that in the case in hand status report was
filed by defendant No.4 /MCD. As per status report permission for
installation of elevator was granted by the MCD after following due process
of law and as per policy for installation of lift.
In the case in hand plaintiffs have alleged that
defendant No.1 and 2 in collusion and conspiracy with defendant No.3 have
malafidely, dishonestly and fraudulently prepared a false NOC in favour of
defendant No.4 for installation of elevator. However, plaintiffs have not filed
any material particulars in the plaint regarding collusion and conspiracy
between plaintiff and defendant. It is settled law that allegation of collusion
and conspiracy must be supported by necessary particulars and vague and
general averment to the effect that there was conspiracy or collusion is not
suffice to show cause of action in favour of plaintiffs regarding any collusion
or conspiracy. It is settled law that in the case of collusion or conspiracy the
parties pleading it must set forth full material particulars and vague and
general allegation regarding conspiracy and collusion is not suffice.
As discussed above said in the case in hand
defendant No.4/MCD had filed status report stating that permission for
construction of elevator was granted. There is in fact a presumption that
public authority has acted bonafide and in good faith. The above
presumption can no doubt be rebutted by the person making the charge but
only on cogent and satisfactory material. However, in the case in hand
plaintiff has made general and vague allegation regarding conspiracy and
CS SCJ 1441/23 Atul Garg Vs. Preeti Grewal & Ors. Page No. 9 of 11
-- 9 of 11 --
collusion which in the view of Court does not give rise of cause of action in
favour of plaintiffs and against the defendants.
8. It is also relevant to note that plaintiff has alleged the violation of
fundamental right of enjoyment of easementary right i.e. right of air, right of
water, right of sun light, right of common area as MCD has granted
NOC/permission for installation of lift. However, in the view of court above
allegations mentioned in the plaint is highly vague in nature as plaintiff has
not mentioned material particulars as to how and to what extent easementary
right is violated due to installation of lift.
9. Moreover, as discussed above said no material particular is
pleaded in the plaint to show conspiracy or collusion or malafide or
fraudulent intention of defendants regarding obtaining NOC/permission from
MCD for installing elevator in the suit property. In the view of the vague and
general allegation is not enough to show cause of action in favour of plaintiff.
There is nothing material on record or any material particulars mentioned in
the plaint to show that NOC/permission was obtained from MCD
fraudulently. There is no material particulars to show that above
permission/NOC was a false document. There is also no material particulars
mentioned in the plaint to show that defendants have violated any condition
of the policy notified by MCD/DDA regarding installation of lift in above
apartment.
10. Considering the above facts and circumstances, court is of the
view that no cause of action is made out in favour of plaintiff as no
individual right of plaintiffs have infringed because of installation of lift in
the suit property particularly keeping in view the fact that MCD has granted
CS SCJ 1441/23 Atul Garg Vs. Preeti Grewal & Ors. Page No. 10 of 11
-- 10 of 11 --
the sanction/permission for installation of lift to defendants in the suit
premises.
11. In view of above discussion the present suit / plaint is rejected
under Order 7 Rule 11 CPC.
File after due compliance be consigned to Record Room.
Decree sheet be prepared accordingly.
Announced in the open court
on 23.03.2024.
(Rakesh KumarII)
JSCC/ASCJ/Gudn. Judge
North, Rohini Courts, Delhi/23.03.2024
CS SCJ 1441/23 Atul Garg Vs. Preeti Grewal & Ors. Page No. 11 of 11
-- 11 of 11 --

TrustJury presents public court-record information for legal discovery and reference. Record availability and detail can vary by source and case.