Skip to main content
Court Order

Order 3

CNR DLNT03000754202605 May 2026
Back to Case

Full Order Text

Order 3 · 05 May 2026 · CNR DLNT030007542026

Order Details: COPY OF JUDICIAL PROCEEDINGS
Pdf Text: 12 CS SCJ 509/26
ANAND PRAKASH NAGPAL Vs. AJAY BHARDWAJ
05.05.2026
Present: Sh. Rajiv Tehlan Ld. Counsel for plaintiff with
plaintiff in person.
Sh. Rahul Sharma Ld. Counsel for defendant
no.1.
Sh. Kapil Jain Ld. Counsel for defendant no.2
and 3.
Sh. Sunil Kumar Ld. Counsel for defendant
no.4/ MCD.
Today, it has been apprised that the matter is
pending before the mediation center for tomorrow.
However, it is stated that chances of settlement are bleak.
An application U/o 10 rule 2 CPC has been
made on behalf of plaintiff. On being inquired, as to how the
said application is maintainable as the said rule pertains to
the power/discretion of the court to examine any party, Ld.
Counsel for the plaintiff has sought permission to withdraw
the same. The said application is accordingly dismissed as
withdrawn.
Another application U/s 151 CPC has been
made by plaintiff seeking stay of unauthorised construction
of the entire property of defendant no.1. This application, in
the considered opinion of this court, seeks to remedy a cause
which should be done by way of a separate suit. The
application is seeking to redress something beyond the scope
of the suit and is accordingly dismissed.
-- 1 of 3 --
At this stage, the plaintiff seeks a direction for
maintaining status quo. Essentially, it is sought that
defendant No. 1 be restrained from opening a door towards
the gali in question till the next date of hearing, as it is
asserted that the said gali is being exclusively used by the
plaintiff.
It is pertinent to mention that the plaintiff has
relied upon a mutual agreement dated 23.12.2012.
Prima
facie, the said document is unregistered and no material has
been placed on record to establish any exclusive right of the
plaintiff over the gali which has been left out for the access
by the predecessor of defendant no.2 and 3. It is also not in
dispute that both parties have alternate access to their
respective properties.
Even if the said agreement dated 23.12.2012 is
taken into consideration, stipulating that upon sale of the
property by defendant no.2 and3, the door shall be closed and
the gali shall be for the exclusive use of the plaintiff, the
same, being unregistered, does not prima facie confer any
enforceable right in immovable property. Further, an
easement by prescription requires clear proof of open,
continuous, peaceful and as-of-right user for a period of 20
years. It is suffice to state that the alleged agreement is of the
year 2012 and the statutory period is not even shown to have
elapsed.
As regards the contention that in the absence of
interim protection the suit would be rendered infructuous, the
same is not persuasive, as the mere opening of a door would
not extinguish any alleged right of the plaintiff and can be
suitably addressed at the stage of final adjudication.
-- 2 of 3 --
Thus, the prayer of the plaintiff for restraining
the defendant no.1 from opening gate or window in the said
gali is rejected.
However, it is deemed necessary and fit in the
circumstances of the case that directions given on the last
date of hearing should remain in force till NDOH.
For the sake of clarity, it is re-affirmed that the
defendant no.1 has been directed to not raise any
construction in the passage as shown in red colour in the site
plan and to not install any gate on the entrance of the said
passage till NDOH. Defendant no.1 is further directed not to
store any construction material in the said passage till the
NDOH.
In the event of no settlement, the case shall be
heard on the interim application u/o 39 rule 1 and 2 CPC on
14.05.2026.
(Nitish Kumar Sharma)
JSCC/ASCJ/GUDN. JUDGE
North, Rohini Courts,Delhi/05.05.2026
-- 3 of 3 --

TrustJury presents public court-record information for legal discovery and reference. Record availability and detail can vary by source and case.