CS SCJ - CIVIL SUIT FOR CIVIL JUDGE
DELHI COMMERCIAL BUILDERS P LTDVsNEELAM MUDGAL +1 more
CNR DLNT030000462023534-Senior Civil Judge Cum Rent Controller
Rohini North, Senior Civil Judge cum RC Court
delhi · Delhi (DL)
PENDING
TrustJury record updated 18 Oct 2026
Case Overview
- Registration Number
- 33/2023
- Registration Date
- 09 Jan 2023
- Next Hearing Date
- 30 Oct 2026
- Case Stage
- Order/Judgement
Advocates
1For Petitioner
For Respondent
Not available
Parties
3Petitioner
Respondent
Acts & Sections
2Injuctions-Both Permanent and Mandatory · Sec 2
possession · Sec 1
Case History / Proceedings
Case History
Date: 10-01-2023 Business: f/p Next Purpose: Misc. cases / purpose Next Hearing Date: 01-02-2023 Date: 01-02-2023 Business: f/p Next Purpose: Misc. cases / purpose Next Hearing Date: 19-04-2023 Date: 19-04-2023 Business: f/p Next Purpose: Misc. cases / purpose Next Hearing Date: 25-07-2023 Date: 25-07-2023 Business: f/p Next Purpose: Ex-Parte Evidence Next Hearing Date: 11-09-2023 Date: 11-09-2023 Business: pe Next Purpose: Ex-Parte Evidence Next Hearing Date: 11-10-2023 Date: 11-10-2023 Business: f/p Next Purpose: Ex-Parte Evidence Next Hearing Date: 10-11-2023 Date: 10-11-2023 Business: fp Next Purpose: Ex-Parte Evidence Next Hearing Date: 19-12-2023 Date: 19-12-2023 Business: fp Next Purpose: Ex-Parte Evidence Next Hearing Date: 12-02-2024 Date: 12-02-2024 Business: f/p Next Purpose: Ex-Parte Evidence Next Hearing Date: 04-04-2024 Date: 04-04-2024 Business: fp Next Purpose: Ex-Parte Argument Next Hearing Date: 30-05-2024 Date: 30-05-2024 Business: fp Next Purpose: Ex-Parte Argument Next Hearing Date: 10-07-2024 Date: 10-07-2024 Business: fp Next Purpose: Ex-Parte Argument Next Hearing Date: 15-07-2024 Date: 15-07-2024 Business: fp Next Purpose: Ex-Parte Argument Next Hearing Date: 05-09-2024 Date: 05-09-2024 Business: fp Next Purpose: Ex-Parte Argument Next Hearing Date: 05-11-2024 Date: 05-11-2024 Business: fp Next Purpose: Plaintiff/Petitioner Evidence Next Hearing Date: 04-02-2025 Date: 04-02-2025 Business: fp Next Purpose: Ex-Parte Argument Next Hearing Date: 22-04-2025 Date: 22-04-2025 Business: fp Next Purpose: Ex-Parte Argument Next Hearing Date: 09-06-2025 Date: 09-06-2025 Business: ORDER Next Purpose: Order/Judgement Next Hearing Date: 11-07-2025 Date: 11-07-2025 Business: order Next Purpose: Order/Judgement Next Hearing Date: 26-07-2025 Date: 26-07-2025 Business: argu Next Purpose: Misc. Arguments Next Hearing Date: 28-08-2025 Date: 28-08-2025 Business: fp Next Purpose: Misc. Arguments Next Hearing Date: 01-11-2025 Date: 01-11-2025 Business: fp Next Purpose: Misc. Arguments Next Hearing Date: 22-11-2025 Date: 22-11-2025 Business: jajment Next Purpose: Order/Judgement Next Hearing Date: 17-12-2025 Date: 17-12-2025 Business: fp Next Purpose: Order/Judgement Next Hearing Date: 12-02-2026 Date: 12-02-2026 Business: FP Next Purpose: Order/Judgement Next Hearing Date: 02-03-2026 Date: 02-03-2026 Business: OO Next Purpose: Order/Judgement Next Hearing Date: 14-03-2026 Date: 14-03-2026 Business: clarification sought Next Purpose: Order/Judgement Next Hearing Date: 10-04-2026 Date: 10-04-2026 Business: fp Next Purpose: Order/Judgement Next Hearing Date: 12-05-2026 Date: 12-05-2026 Business: KK Next Purpose: Order/Judgement Next Hearing Date: 10-06-2026 Date: 10-06-2026 Business: pp Next Purpose: Order/Judgement Next Hearing Date: 11-07-2026 Date: 11-07-2026 Business: ll Next Purpose: Order/Judgement Next Hearing Date: 22-08-2026 Date: 22-08-2026 Business: ff Next Purpose: Order/Judgement Next Hearing Date: 21-09-2026 Date: 21-09-2026 Business: kk Next Purpose: Order/Judgement Next Hearing Date: 30-10-2026
Additional Case Details
Additional Case Details
Filing Number: 46/2023 Filing Date: 07-01-2023 First Hearing Date: 10th January 2023 Court Number And Judge: 534-Senior Civil Judge Cum Rent Controller
Orders
60Interim Order 3021 Sept 2026
21 Sept 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 14 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 21.09.2026 Advocates are abstaining from work today. Present: Ld. proxy counsel for plaintiff through VC. Defendant is already ex-parte. Matter is fixed today for clarifications, if any/ ex-parte judgment. It is submitted by Ld. proxy counsel for plaintiff that some more time may be granted for filing the relevant citations in the present case. Relevant citations, if any be filed on or before the NDOH. In view of the submissions, put up for clarifications, if any/ ex-parte judgment on 30.10.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /21.09.2026 -- 1 of 1 --
Interim Order 2922 Aug 2026
22 Aug 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 20 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 22.08.2026. Present: Ld. counsel for plaintiff, Sh. Ramveer Singh. Defendant is already ex-parte. Matter is fixed today for clarifications, if any/ ex-parte judgment. Written submissions along with valuation report of suit property filed on behalf of the plaintiff. Same is taken on record. Put up for clarifications, if any/ ex-parte judgment on 21.09.2026 (Akriti Mahendru) SCJ / RC / North Rohini Court /22.08.2026 -- 1 of 1 --
Interim Order 2811 Jul 2026
11 Jul 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 4 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 11.07.2026 Present: Ld. counsel for plaintiff, Sh. Rambir Singh and Ms. Varsha. None for defendant. Matter is fixed today for clarifications, if any/ judgment. Relevant citations filed on behalf of the plaintiff. Same are taken on record. It is submitted by Ld. counsel for plaintiff that he will provide the clarifications regarding the valuation report of the suit property on the NDOH. In view of the submissions, put up for clarifications, if any/ judgment on 22.08.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /11.07.2026 -- 1 of 1 --
Interim Order 2710 Jun 2026
10 Jun 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 9 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 10.06.2026 Ld. Presiding Officer is on leave today. Present: Ld. counsel for plaintiff, Sh. Ramveer Singh. Defendant is already ex-parte. As per direction of Ld. presiding officer, put up for purpose fixed on 11.07.2026. (Reader) SCJ / RC / North Rohini Court /10.06.2026 -- 1 of 1 --
Interim Order 2612 May 2026
12 May 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 18 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 12.05.2026 Present: Ld. counsel for plaintiff, Sh. Ramvir Singh. Defendant is already ex-parte. Matter is fixed today for clarifications, if any/judgment. Clarifications sought. Put up for clarifications, if any/judgment on 10.06.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /12.05.2026 -- 1 of 1 --
Interim Order 2510 Apr 2026
10 Apr 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 34 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 10.04.2026 Present: Ld. counsel for plaintiff, Sh. Inder Singh Saroha and Sh. Ramvir Singh. Defendant is already ex-parte. Matter is fixed today for clarifications, if any/judgment. Put up for clarifications, if any/judgment at 4.00 PM. (Akriti Mahendru) SCJ / RC / North Rohini Court /10.04.2026 At 4.00 PM. Present: None for the plaintiff. Defendant is already ex-parte. No time left. Put up for clarifications, if any/judgment on 12.05.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /10.04.2026 -- 1 of 1 --
Interim Order 2414 Mar 2026
14 Mar 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 35 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 14.03.2026 File taken up today as 02.03.2026 was declared holiday vide circular No. 64/G-4/Genl.-I/DHC dated 27.02.2026 passed by The Hon’ble High Court of Delhi. Present: Ld. counsels for plaintiff, Sh. Chetan Anand and Sh. K.K Srivastav through VC. Ld. counsel for plaintiff, Sh. I.S Saroha and Sh. Rambir Singh. Defendant is already ex-parte. Matter is fixed today for clarifications, if any/judgment. Clarifications sought. Put up for clarifications, if any/ ex-parte judgment on 10.04.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /14.03.2026 -- 1 of 1 --
Interim Order 2312 Feb 2026
12 Feb 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 28 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 12.02.2026 Present: Ld. counsel for plaintiff, Sh. I.S Saroha, Sh. Rambir Singh and Sh. Vikas Singh. Defendant is already ex-parte. Matter is fixed today for clarifications, if any/judgment. Clarifications sought from Ld. counsel for plaintiff regarding the amount to be recovered from the defendant as ground rent/charges in the present case. Present valuation of the property in furtherance of clarification filed on record by Ld. counsel for plaintiff. Put up for clarifications, if any/ ex-parte judgment on 02.03.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /12.02.2026 -- 1 of 1 --
Interim Order 2217 Dec 2025
17 Dec 2025
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 22 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 17.12.2025 Present : Ld. counsel for plaintiff, Sh. Ramvir Singh. Sh. K.K Srivastav, Ld. counsel for plaintiff through VC. Matter is fixed today for clarifications, if any/judgment. Clarifications sought from Ld. counsel for plaintiff. Written submissions and relevant citations have already been filed on behalf of plaintiff. Put up for clarifications, if any/judgment on 12.02.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /17.12.2025 -- 1 of 1 --
Interim Order 2122 Nov 2025
22 Nov 2025
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 20 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 22.11.2025 Present : Ld. counsel for plaintiff, Sh. Ramveer Singh (Fresh Vakalatnama filed). Defendant is already ex-parte. Matter is fixed today for ex-parte final argument. Ex-parte final arguments heard. Written arguments are already on record. Put up for clarifications, if any/judgment on 17.12.2025. (Akriti Mahendru) SCJ / RC / North Rohini Court /22.11.2025 -- 1 of 1 --
Interim Order 2026 Jul 2025
26 Jul 2025
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 29 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD VS. NEELAM MUDGAL 26.07.2025 Reader and Steno are on leave. Clarifications are required from the plaintiff regarding its ownership of the suit property. List for clarifications on 28.08.2025. (Himanshu Raman Singh) SCJ/RC/North Rohini Court/26.07.2025 -- 1 of 1 --
Interim Order 1926 Jul 2025
26 Jul 2025
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: a t A -- 1 of 1 --
Interim Order 1811 Jul 2025
11 Jul 2025
Order Details: COPY OF ORDER Pdf Text: CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P. LTD. Vs. NEELAM MUDGAL 11/07/2025 Present : Mr. Chetan Anand, Ld. Counsel for plaintiff. None for defendant. Put up for orders at 4.00 p.m. (Himanshu Raman Singh) SCJ / RC / North Rohini Court / 11/07/2025 At 4.00 p.m. Present : None Some more time is required to go through the file. Put up for order on 26.07.2025. (Himanshu Raman Singh) SCJ / RC / North Rohini Court / 11/07/2025 -- 1 of 1 --
Interim Order 1709 Jun 2025
09 Jun 2025
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 09.06.2025 Present : Mr. Rambir Singh, Ld. Proxy Counsel for plaintiff. Defendant is already exparte. Written arguments filed on behalf of plaintiff. Exparte final arguments heard. Put up for orders on 11/07/2025. ( Himanshu Raman Singh) SCJ / RC / North Rohini Court / 09.06.2025 -- 1 of 1 --
Interim Order 1604 Feb 2025
04 Feb 2025
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P. LTD. Vs. NEELAM MUDGAL 04.02.2025 Present : AR Naresh Kumar with Ld. Counsel Mr. K. K. Srivastav and Ms. Mamta Sehgal. Defendant is already exparte. PW1 Naresh Kumar further examined in chief, in view of order dated 05.11.2024, and discharged. PE stands closed. At request, put up for exparte final arguments on 22.04.2025. ( Divya Malhotra ) SCJ / RC / North Rohini Court / 04.02.2025 -- 1 of 1 --
Interim Order 1505 Nov 2024
05 Nov 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P. LTD. Vs. NEELAM MUDGAL 05/11/2024 Present : Sh. K. K. Srivastav and Sh. Chetan Anand, Ld. Counsels for Plaintiff. Defendant is already exparte. There is an application under Order XVIII Rule 17 r/w Section 151CPC for recalling PW1. For the reason stated in the application and considering that Defendant is already exparte, same is allowed. Additional affidavit of PW – Naresh Kumar is taken on record. Put up for PE on 04/02/2025. ( Divya Malhotra ) SCJ / RC / North Rohini Court / 05/11/2024 -- 1 of 1 --
Interim Order 1405 Sept 2024
05 Sept 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P. LTD. Versus NEELAM MUDGAL 05/09/2024 Present : Sh. A. K. Srivastava, Ld. Counsel for Plaintiff. Defendant has already been proceeded ex-parte. Ld. Counsel for the Plaintiff seeks time to lead ex-parte Plaintiff’s Evidence. Re-notify the matter for ex-parte PE on 05/11/2024. ( Neeti Suri Mishra ) SCJ / RC / North Rohini Court / 05/09/2024 -- 1 of 1 --
Interim Order 1315 Jul 2024
15 Jul 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ No. 33-23 Delhi Commercial Builders Pvt. Ltd. Versus Neelam Mudgal 15/07/2024 Advocates are informed to be abstaining from work. Present : Sh. Naresh Kumar, AR of Plaintiff in person. Defendant has already been proceeded ex-parte. Put up for ex-parte Plaintiff’s Evidence on 05/09/2024. ( Neeti Suri Mishra ) SCJ / RC / North Rohini Court / 15/07/2024 -- 1 of 1 --
Interim Order 1210 Jul 2024
10 Jul 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 10/07/2024 At 12:00 noon Present : Sh. Chetan Anand and Sh. Abhishek Dalal, Ld. Counsel for Plaintiff. Defendant has already been proceeded ex-parte. Application under Order XVIII rule 17 r/w Section 151 CPC for recalling of PW1 for further examination is filed on behalf Plaintiff. Same is taken on record. Application is allowed. Additional evidence is filed today. Same is taken on record. Put up for evidence on 15/07/2024. ( Neeti Suri Mishra ) SCJ / RC / North Rohini Court / 10/07/2024 -- 1 of 1 --
Interim Order 1130 May 2024
30 May 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 30/05/2024 Present : Sh. A. K. Srivastava and Sh. Chetan Anand, Ld. Counsel for Plaintiff. Defendant has already been proceeded ex-parte. Ex-parte final submissions are heard. List for further arguments on 10/07/2024 at 12:00 noon. ( Neeti Suri Mishra ) SCJ / RC / North Rohini Court / 30/05/2024 -- 1 of 1 --
Interim Order 1004 Apr 2024
04 Apr 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P Ltd Vs. Neelam Mudgal 04/04/2024 Present : Sh. K. K. Srivastava, Ld. Counsel for Plaintiff. Defendant has already been proceeded ex-parte. Put up for ex-parte arguments on 30/05/2024. ( Neeti Suri Mishra ) SCJ / RC / North Rohini Court / 04/04/2024 -- 1 of 1 --
Interim Order 912 Feb 2024
12 Feb 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 12/02/2024 Present : Ld. Counsel for Plaintiff. Defendants has already been proceeded ex-parte. Ex-parte final submissions are heard from Ld. Counsel for the Plaintiff. Put up for further submissions on 04/04/2024. ( Neeti Suri Mishra ) SCJ / RC / North Rohini Court / 12/02/2024 -- 1 of 1 --
Interim Order 819 Dec 2023
19 Dec 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 19/12/2023 Present : AR of Plaintiff alongwith Sh. Chetan Anand, Ld. Counsel. Defendant has already been proceeded ex-parte. As ex-parte arguments were earlier advanced before the Ld. Predecessor, Ld. Counsel for the Plaintiff is directed to advance ex-parte arguments again on 12/02/2024. ( Neeti Suri Mishra) SCJ / RC / North Rohini Court / 19/12/2023 -- 1 of 1 --
Interim Order 710 Nov 2023
10 Nov 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P Ltd Vs. Neelam Mudgal 10/11/2023 Present : AR of the Plaintiff alongwith Sh. Rambir Singh, Ld. Counsel for Plaintiff. Defendant has already been proceeded ex-parte and even today none has appeared for him. Fresh Vakalatnama is filed for the Plaintiff. Taken on record. Although the matter is listed for ex-parte final order, the Ld. Counsel submitted that he wishes to address additional submissions. Additional submissions are heard. Put up for clarification, if any/order, on 19/12/2023. ( Rajani Ranga ) SCJ / RC / North Rohini Court / 10/11/2023 -- 1 of 1 --
Interim Order 611 Oct 2023
11 Oct 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 11/10/2023 Present : Sh. Naresh Kumar, stated to be AR of Plaintiff alongwith Sh. Chetan Anand, Ld. Counsel. None for Defendant, despite repeated calls. The Plaintiff has moved an application for substitution of AR. Taken on record. Heard on the application moved for substitution of AR. Perused. The Authority Letter in favour of Sh. Naresh Kumar the Proposed AR, has already been filed on record. For the reason mentioned in application, the application is allowed. Sh. Naresh Kumar is permitted to represent the Plaintiff. Accordingly, the application is disposed of. Let ex-parte PE be conducted. AR of Plaintiff has tendered his evidence by way of affidavit Ex. PW1/1. PE closed. Final submissions heard. Put up for orders on 10/11/2023. ( Rajani Ranga ) SCJ / RC/ North Rohini Court / 11/10/2023 -- 1 of 1 --
Interim Order 511 Sept 2023
11 Sept 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 11/09/2023 Present : Sh. Naresh Kumar, stated to be the AR alongwith Sh. Chetan Anand, Ld. Counsel for Plaintiff. Defendant has already been proceeded ex-parte and even today none has appeared for him. Affidavit to be tendered in evidence alongwith Authority Letter in favour of Sh. Naresh Kumar and a Certificate under Section 65 B of the Indian Evidence Act is filed. Ld. Counsel for the Plaintiff sought an adjournment for moving an appropriate application for substitution of AR. Heard. Allowed. Put up for moving of appropriate application / PE on 11/10/2023. ( Rajani Ranga ) SCJ / RC/ North Rohini Court / 11/09/2023 -- 1 of 1 --
Interim Order 425 Jul 2023
25 Jul 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 25/07/2023 Present : Sh. Chetan Anand, Ld. Counsel for Plaintiff. None for Defendant, despite repeated calls. Newspaper (Veer Arjun) Hindi Edition, dated 16/05/2023, wherein summons to both the Defendants have been issued by way of publication is received. Perused. Taken on record. The Defendants have been served by way of publication. 30 day’s period has lapsed since the publication. However, neither the Defendants put in appearance nor filed Written Statement. In view of the same and as prayed, both the Defendants are proceeded ex-parte. Put up for ex-parte PE on 11/09/2023. ( Rajani Ranga ) SCJ / RC/ North Rohini Court / 25/07/2023 -- 1 of 1 --
Interim Order 319 Apr 2023
19 Apr 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 19/04/2023 Present : Sh. Chetan Anand, Ld. Counsel for plaintiff (physically appeared). Summons sent to defendants received back unserved. On perusal of summons it is observed that the name of defendant no. 2 has been wrongly mentioned as Man Sharma instead of Aman Sharma. Ahlmad is warned to be careful in future Ld. Counsel for the plaintiff has filed an application under Order 5 Rule 20 r/w Section 151 CPC alongwith supporting affidavit. Submissions heard. File perused. In the interest of justice, the application is allowed. Issue fresh summons to defendants by way of publication in newspaper namely “Veer Arjun” Hindi Edition having circulation of area of last known address of defendant, subject to deposit publication money with concerned newspaper and filing PF by plaintiff. Copy of order be given dasti, as prayed for. Put up on 25/07/2023. ( Virender Singh ) SCJ / RC/ North Rohini Court / 19/04/2023 -- 1 of 1 --
Interim Order 201 Feb 2023
01 Feb 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 01/02/2023 Present : Sh. Chetan Anand, Ld. Counsel for plaintiff (physically appeared). Summons sent to defendants received back unserved. On request, issue fresh summons to defendants in terms of previous order as well as dasti, returnable on 19/04/2023. The Process Server is also directed to affixation copy of plaint and summons at some conspicuous part of the address of the defendant if the defendant cannot be served otherwise. ( Virender Singh ) SCJ / RC/ North Rohini Court / 01/02/2023 -- 1 of 1 --
Interim Order 110 Jan 2023
10 Jan 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ No. 33-23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 10/01/2023 Fresh suit received by way of assignment. It be checked and registered. Present : Sh. Chetan Anand, Ld. Counsel for plaintiff (physically appeared). File perused. Heard. Issue summons of the suit and notice of the application under Order XXXIX rule 1 & 2 CPC to the defendant on filing of PF, RC & Speed Post, returnable for 01/02/2023. Steps be taken within 07 days. Let the requisite under taking regarding the payment of deficient Court fees, if any, in view of the circular no. F.10 (1175)/COS (HQ)/ CD/3356, dated 31/12/2013 regarding the SLP bearing no. 3323/13 titled as “Government of NCT of Delhi Vs. Delhi Bar Association” regarding issue of Court fee be filed by the plaintiff, if not already filed by the next date of hearing, as per rules. Defendant is directed to file written statement within 30 days from the day of receipt of the summons. Copy of the order sheet be annexed with the summons. ( Virender Singh ) SCJ / RC/ North Rohini Court / 10/01/2023 -- 1 of 1 --
Order 3021 Sept 2026
21 Sept 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 14 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 21.09.2026 Advocates are abstaining from work today. Present: Ld. proxy counsel for plaintiff through VC. Defendant is already ex-parte. Matter is fixed today for clarifications, if any/ ex-parte judgment. It is submitted by Ld. proxy counsel for plaintiff that some more time may be granted for filing the relevant citations in the present case. Relevant citations, if any be filed on or before the NDOH. In view of the submissions, put up for clarifications, if any/ ex-parte judgment on 30.10.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /21.09.2026 -- 1 of 1 --
Order 2922 Aug 2026
22 Aug 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 20 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 22.08.2026. Present: Ld. counsel for plaintiff, Sh. Ramveer Singh. Defendant is already ex-parte. Matter is fixed today for clarifications, if any/ ex-parte judgment. Written submissions along with valuation report of suit property filed on behalf of the plaintiff. Same is taken on record. Put up for clarifications, if any/ ex-parte judgment on 21.09.2026 (Akriti Mahendru) SCJ / RC / North Rohini Court /22.08.2026 -- 1 of 1 --
Order 2811 Jul 2026
11 Jul 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 4 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 11.07.2026 Present: Ld. counsel for plaintiff, Sh. Rambir Singh and Ms. Varsha. None for defendant. Matter is fixed today for clarifications, if any/ judgment. Relevant citations filed on behalf of the plaintiff. Same are taken on record. It is submitted by Ld. counsel for plaintiff that he will provide the clarifications regarding the valuation report of the suit property on the NDOH. In view of the submissions, put up for clarifications, if any/ judgment on 22.08.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /11.07.2026 -- 1 of 1 --
Order 2710 Jun 2026
10 Jun 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 9 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 10.06.2026 Ld. Presiding Officer is on leave today. Present: Ld. counsel for plaintiff, Sh. Ramveer Singh. Defendant is already ex-parte. As per direction of Ld. presiding officer, put up for purpose fixed on 11.07.2026. (Reader) SCJ / RC / North Rohini Court /10.06.2026 -- 1 of 1 --
Order 2612 May 2026
12 May 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 18 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 12.05.2026 Present: Ld. counsel for plaintiff, Sh. Ramvir Singh. Defendant is already ex-parte. Matter is fixed today for clarifications, if any/judgment. Clarifications sought. Put up for clarifications, if any/judgment on 10.06.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /12.05.2026 -- 1 of 1 --
Order 2510 Apr 2026
10 Apr 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 34 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 10.04.2026 Present: Ld. counsel for plaintiff, Sh. Inder Singh Saroha and Sh. Ramvir Singh. Defendant is already ex-parte. Matter is fixed today for clarifications, if any/judgment. Put up for clarifications, if any/judgment at 4.00 PM. (Akriti Mahendru) SCJ / RC / North Rohini Court /10.04.2026 At 4.00 PM. Present: None for the plaintiff. Defendant is already ex-parte. No time left. Put up for clarifications, if any/judgment on 12.05.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /10.04.2026 -- 1 of 1 --
Order 2414 Mar 2026
14 Mar 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 35 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 14.03.2026 File taken up today as 02.03.2026 was declared holiday vide circular No. 64/G-4/Genl.-I/DHC dated 27.02.2026 passed by The Hon’ble High Court of Delhi. Present: Ld. counsels for plaintiff, Sh. Chetan Anand and Sh. K.K Srivastav through VC. Ld. counsel for plaintiff, Sh. I.S Saroha and Sh. Rambir Singh. Defendant is already ex-parte. Matter is fixed today for clarifications, if any/judgment. Clarifications sought. Put up for clarifications, if any/ ex-parte judgment on 10.04.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /14.03.2026 -- 1 of 1 --
Order 2312 Feb 2026
12 Feb 2026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 28 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 12.02.2026 Present: Ld. counsel for plaintiff, Sh. I.S Saroha, Sh. Rambir Singh and Sh. Vikas Singh. Defendant is already ex-parte. Matter is fixed today for clarifications, if any/judgment. Clarifications sought from Ld. counsel for plaintiff regarding the amount to be recovered from the defendant as ground rent/charges in the present case. Present valuation of the property in furtherance of clarification filed on record by Ld. counsel for plaintiff. Put up for clarifications, if any/ ex-parte judgment on 02.03.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /12.02.2026 -- 1 of 1 --
Order 2217 Dec 2025
17 Dec 2025
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 22 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 17.12.2025 Present : Ld. counsel for plaintiff, Sh. Ramvir Singh. Sh. K.K Srivastav, Ld. counsel for plaintiff through VC. Matter is fixed today for clarifications, if any/judgment. Clarifications sought from Ld. counsel for plaintiff. Written submissions and relevant citations have already been filed on behalf of plaintiff. Put up for clarifications, if any/judgment on 12.02.2026. (Akriti Mahendru) SCJ / RC / North Rohini Court /17.12.2025 -- 1 of 1 --
Order 2122 Nov 2025
22 Nov 2025
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 20 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 22.11.2025 Present : Ld. counsel for plaintiff, Sh. Ramveer Singh (Fresh Vakalatnama filed). Defendant is already ex-parte. Matter is fixed today for ex-parte final argument. Ex-parte final arguments heard. Written arguments are already on record. Put up for clarifications, if any/judgment on 17.12.2025. (Akriti Mahendru) SCJ / RC / North Rohini Court /22.11.2025 -- 1 of 1 --
Order 2026 Jul 2025
26 Jul 2025
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: 29 CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD VS. NEELAM MUDGAL 26.07.2025 Reader and Steno are on leave. Clarifications are required from the plaintiff regarding its ownership of the suit property. List for clarifications on 28.08.2025. (Himanshu Raman Singh) SCJ/RC/North Rohini Court/26.07.2025 -- 1 of 1 --
Order 1926 Jul 2025
26 Jul 2025
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: a t A -- 1 of 1 --
Order 1811 Jul 2025
11 Jul 2025
Order Details: COPY OF ORDER Pdf Text: CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P. LTD. Vs. NEELAM MUDGAL 11/07/2025 Present : Mr. Chetan Anand, Ld. Counsel for plaintiff. None for defendant. Put up for orders at 4.00 p.m. (Himanshu Raman Singh) SCJ / RC / North Rohini Court / 11/07/2025 At 4.00 p.m. Present : None Some more time is required to go through the file. Put up for order on 26.07.2025. (Himanshu Raman Singh) SCJ / RC / North Rohini Court / 11/07/2025 -- 1 of 1 --
Order 1709 Jun 2025
09 Jun 2025
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P LTD Vs. NEELAM MUDGAL 09.06.2025 Present : Mr. Rambir Singh, Ld. Proxy Counsel for plaintiff. Defendant is already exparte. Written arguments filed on behalf of plaintiff. Exparte final arguments heard. Put up for orders on 11/07/2025. ( Himanshu Raman Singh) SCJ / RC / North Rohini Court / 09.06.2025 -- 1 of 1 --
Order 1604 Feb 2025
04 Feb 2025
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P. LTD. Vs. NEELAM MUDGAL 04.02.2025 Present : AR Naresh Kumar with Ld. Counsel Mr. K. K. Srivastav and Ms. Mamta Sehgal. Defendant is already exparte. PW1 Naresh Kumar further examined in chief, in view of order dated 05.11.2024, and discharged. PE stands closed. At request, put up for exparte final arguments on 22.04.2025. ( Divya Malhotra ) SCJ / RC / North Rohini Court / 04.02.2025 -- 1 of 1 --
Order 1505 Nov 2024
05 Nov 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P. LTD. Vs. NEELAM MUDGAL 05/11/2024 Present : Sh. K. K. Srivastav and Sh. Chetan Anand, Ld. Counsels for Plaintiff. Defendant is already exparte. There is an application under Order XVIII Rule 17 r/w Section 151CPC for recalling PW1. For the reason stated in the application and considering that Defendant is already exparte, same is allowed. Additional affidavit of PW – Naresh Kumar is taken on record. Put up for PE on 04/02/2025. ( Divya Malhotra ) SCJ / RC / North Rohini Court / 05/11/2024 -- 1 of 1 --
Order 1405 Sept 2024
05 Sept 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 DELHI COMMERCIAL BUILDERS P. LTD. Versus NEELAM MUDGAL 05/09/2024 Present : Sh. A. K. Srivastava, Ld. Counsel for Plaintiff. Defendant has already been proceeded ex-parte. Ld. Counsel for the Plaintiff seeks time to lead ex-parte Plaintiff’s Evidence. Re-notify the matter for ex-parte PE on 05/11/2024. ( Neeti Suri Mishra ) SCJ / RC / North Rohini Court / 05/09/2024 -- 1 of 1 --
Order 1315 Jul 2024
15 Jul 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ No. 33-23 Delhi Commercial Builders Pvt. Ltd. Versus Neelam Mudgal 15/07/2024 Advocates are informed to be abstaining from work. Present : Sh. Naresh Kumar, AR of Plaintiff in person. Defendant has already been proceeded ex-parte. Put up for ex-parte Plaintiff’s Evidence on 05/09/2024. ( Neeti Suri Mishra ) SCJ / RC / North Rohini Court / 15/07/2024 -- 1 of 1 --
Order 1210 Jul 2024
10 Jul 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 10/07/2024 At 12:00 noon Present : Sh. Chetan Anand and Sh. Abhishek Dalal, Ld. Counsel for Plaintiff. Defendant has already been proceeded ex-parte. Application under Order XVIII rule 17 r/w Section 151 CPC for recalling of PW1 for further examination is filed on behalf Plaintiff. Same is taken on record. Application is allowed. Additional evidence is filed today. Same is taken on record. Put up for evidence on 15/07/2024. ( Neeti Suri Mishra ) SCJ / RC / North Rohini Court / 10/07/2024 -- 1 of 1 --
Order 1130 May 2024
30 May 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 30/05/2024 Present : Sh. A. K. Srivastava and Sh. Chetan Anand, Ld. Counsel for Plaintiff. Defendant has already been proceeded ex-parte. Ex-parte final submissions are heard. List for further arguments on 10/07/2024 at 12:00 noon. ( Neeti Suri Mishra ) SCJ / RC / North Rohini Court / 30/05/2024 -- 1 of 1 --
Order 1004 Apr 2024
04 Apr 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P Ltd Vs. Neelam Mudgal 04/04/2024 Present : Sh. K. K. Srivastava, Ld. Counsel for Plaintiff. Defendant has already been proceeded ex-parte. Put up for ex-parte arguments on 30/05/2024. ( Neeti Suri Mishra ) SCJ / RC / North Rohini Court / 04/04/2024 -- 1 of 1 --
Order 912 Feb 2024
12 Feb 2024
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 12/02/2024 Present : Ld. Counsel for Plaintiff. Defendants has already been proceeded ex-parte. Ex-parte final submissions are heard from Ld. Counsel for the Plaintiff. Put up for further submissions on 04/04/2024. ( Neeti Suri Mishra ) SCJ / RC / North Rohini Court / 12/02/2024 -- 1 of 1 --
Order 819 Dec 2023
19 Dec 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 19/12/2023 Present : AR of Plaintiff alongwith Sh. Chetan Anand, Ld. Counsel. Defendant has already been proceeded ex-parte. As ex-parte arguments were earlier advanced before the Ld. Predecessor, Ld. Counsel for the Plaintiff is directed to advance ex-parte arguments again on 12/02/2024. ( Neeti Suri Mishra) SCJ / RC / North Rohini Court / 19/12/2023 -- 1 of 1 --
Order 710 Nov 2023
10 Nov 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P Ltd Vs. Neelam Mudgal 10/11/2023 Present : AR of the Plaintiff alongwith Sh. Rambir Singh, Ld. Counsel for Plaintiff. Defendant has already been proceeded ex-parte and even today none has appeared for him. Fresh Vakalatnama is filed for the Plaintiff. Taken on record. Although the matter is listed for ex-parte final order, the Ld. Counsel submitted that he wishes to address additional submissions. Additional submissions are heard. Put up for clarification, if any/order, on 19/12/2023. ( Rajani Ranga ) SCJ / RC / North Rohini Court / 10/11/2023 -- 1 of 1 --
Order 611 Oct 2023
11 Oct 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 11/10/2023 Present : Sh. Naresh Kumar, stated to be AR of Plaintiff alongwith Sh. Chetan Anand, Ld. Counsel. None for Defendant, despite repeated calls. The Plaintiff has moved an application for substitution of AR. Taken on record. Heard on the application moved for substitution of AR. Perused. The Authority Letter in favour of Sh. Naresh Kumar the Proposed AR, has already been filed on record. For the reason mentioned in application, the application is allowed. Sh. Naresh Kumar is permitted to represent the Plaintiff. Accordingly, the application is disposed of. Let ex-parte PE be conducted. AR of Plaintiff has tendered his evidence by way of affidavit Ex. PW1/1. PE closed. Final submissions heard. Put up for orders on 10/11/2023. ( Rajani Ranga ) SCJ / RC/ North Rohini Court / 11/10/2023 -- 1 of 1 --
Order 511 Sept 2023
11 Sept 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 11/09/2023 Present : Sh. Naresh Kumar, stated to be the AR alongwith Sh. Chetan Anand, Ld. Counsel for Plaintiff. Defendant has already been proceeded ex-parte and even today none has appeared for him. Affidavit to be tendered in evidence alongwith Authority Letter in favour of Sh. Naresh Kumar and a Certificate under Section 65 B of the Indian Evidence Act is filed. Ld. Counsel for the Plaintiff sought an adjournment for moving an appropriate application for substitution of AR. Heard. Allowed. Put up for moving of appropriate application / PE on 11/10/2023. ( Rajani Ranga ) SCJ / RC/ North Rohini Court / 11/09/2023 -- 1 of 1 --
Order 425 Jul 2023
25 Jul 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 25/07/2023 Present : Sh. Chetan Anand, Ld. Counsel for Plaintiff. None for Defendant, despite repeated calls. Newspaper (Veer Arjun) Hindi Edition, dated 16/05/2023, wherein summons to both the Defendants have been issued by way of publication is received. Perused. Taken on record. The Defendants have been served by way of publication. 30 day’s period has lapsed since the publication. However, neither the Defendants put in appearance nor filed Written Statement. In view of the same and as prayed, both the Defendants are proceeded ex-parte. Put up for ex-parte PE on 11/09/2023. ( Rajani Ranga ) SCJ / RC/ North Rohini Court / 25/07/2023 -- 1 of 1 --
Order 319 Apr 2023
19 Apr 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 19/04/2023 Present : Sh. Chetan Anand, Ld. Counsel for plaintiff (physically appeared). Summons sent to defendants received back unserved. On perusal of summons it is observed that the name of defendant no. 2 has been wrongly mentioned as Man Sharma instead of Aman Sharma. Ahlmad is warned to be careful in future Ld. Counsel for the plaintiff has filed an application under Order 5 Rule 20 r/w Section 151 CPC alongwith supporting affidavit. Submissions heard. File perused. In the interest of justice, the application is allowed. Issue fresh summons to defendants by way of publication in newspaper namely “Veer Arjun” Hindi Edition having circulation of area of last known address of defendant, subject to deposit publication money with concerned newspaper and filing PF by plaintiff. Copy of order be given dasti, as prayed for. Put up on 25/07/2023. ( Virender Singh ) SCJ / RC/ North Rohini Court / 19/04/2023 -- 1 of 1 --
Order 201 Feb 2023
01 Feb 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ 33/23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 01/02/2023 Present : Sh. Chetan Anand, Ld. Counsel for plaintiff (physically appeared). Summons sent to defendants received back unserved. On request, issue fresh summons to defendants in terms of previous order as well as dasti, returnable on 19/04/2023. The Process Server is also directed to affixation copy of plaint and summons at some conspicuous part of the address of the defendant if the defendant cannot be served otherwise. ( Virender Singh ) SCJ / RC/ North Rohini Court / 01/02/2023 -- 1 of 1 --
Order 110 Jan 2023
10 Jan 2023
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS SCJ No. 33-23 Delhi Commercial Builders P. Ltd. Vs. Neelam Mudgal 10/01/2023 Fresh suit received by way of assignment. It be checked and registered. Present : Sh. Chetan Anand, Ld. Counsel for plaintiff (physically appeared). File perused. Heard. Issue summons of the suit and notice of the application under Order XXXIX rule 1 & 2 CPC to the defendant on filing of PF, RC & Speed Post, returnable for 01/02/2023. Steps be taken within 07 days. Let the requisite under taking regarding the payment of deficient Court fees, if any, in view of the circular no. F.10 (1175)/COS (HQ)/ CD/3356, dated 31/12/2013 regarding the SLP bearing no. 3323/13 titled as “Government of NCT of Delhi Vs. Delhi Bar Association” regarding issue of Court fee be filed by the plaintiff, if not already filed by the next date of hearing, as per rules. Defendant is directed to file written statement within 30 days from the day of receipt of the summons. Copy of the order sheet be annexed with the summons. ( Virender Singh ) SCJ / RC/ North Rohini Court / 10/01/2023 -- 1 of 1 --
TrustJury presents public court-record information for legal discovery and reference. Record availability and detail can vary by source and case.