Full Order Text
Order 2 · 11 Aug 2026 · CNR DLNE010026612026
Order Details: COPY OF ORDER Pdf Text: CS 295/2026 DLNE010026612026 Tahir Ansari vs. BSES YPL 11.08.2026 File taken up today on applications moved by plaintiff. Present: Ld. counsel for applicant/plaintiff. IA no. 2/26 (application for preponement of date of hearing) 1. For reasons stated in the application, the application is allowed and matter is preponed for today. Date of 29.09.2026 is cancelled. IA no. 3/26 (application for depositing the court fees) 2. Court fees of Rs.27,036/- filed. Same is taken on record. Application is disposed off. IA No. 4/26 (application u/O VI Rule 17 CPC) 3. Notice in this matter is yet to be issued and thus, no prejudice shall be caused to the defendant in case the amendment sought in the application is allowed. Accordingly, the application is allowed and proposed amended plaint is taken on record. 4. Issue summons for settlement of issues to defendants through all permissible modes on filing of PF returnable for 07.10.2026. 5. At this stage, counsel for plaintiff presses her application for interim stay. -- 1 of 2 -- 6. Plaintiff is challenging a DAE bill of about Rs.25 lacs raised against his father Mohd. Zikriya. Counsel argued that the said bill is faulty because in the lab report vide which the meter in the name of the consumer Mohd. Zikriya was checked, it is mentioned that the seals of the meter were found intact. Counsel argued that despite the same, the report has been filed with the connected load of 52.170 Kw against a sanction load of 18 Kw. Counsel prayed that defendant should be restrained from disconnecting the electric supply of the plaintiff. 7. In my humble opinion, no ex-parte stay can be given in this matter as plaintiff admittedly is not the person in whose name the meter in question is installed. The connection is in the name of plaintiff’s father Mohd. Zikriya. Thus, if at all, it was for Mohd. Zikriya to challenge the said bill. Again, nothing has been brought to my notice to suggest how and why the bill in question or the lab report dated 12.01.2026 is faulty. As per the said report, from the data downloaded from the meter inconsistent and erratic consumption pattern was observed which was not in consonance with the maximum demand recorded by the meter. At the time of inspection, as per report dated 12.01.2026, a connected load of 52.170 Kw under domestic category was found connected. Thus, no prima facie case is found in favour of the plaintiff for grant of any interim protection. Thus, the prayer to grant ex-parte stay is declined. 8. List on 07.10.2026. AASHISH GUPTA DJ-01/NE/KKD/DELHI 11.08.2026 -- 2 of 2 --