Order Details: COPY OF ORDER Pdf Text: 31Civ Suit827/23SUSHILA DEVI Vs. BSES Yamuna Power Ltd. 20.05.2024 Present: Sh. Ram Kishan, Ld. counsel for the plaintiff. Sh. Rajesh Kumar Sharma, Ld. counsel for the defendant no.1. Defendant no. 2 is already ex-parte. Put up for orders at 04:00 P.M. (VINOD JOSHI) ACJ-cum-CCJ-cum-ARC (East) KKD Courts, Delhi/20.05.2024 At 04:00 P.M Present: None. 1. Vide this order, I shall dispose off an application of the plaintiff under Order 39 Rule 1 and 2 CPC. 2. Briefly stated, the case of the plaintiff is as follows:- The plaintiff is the owner of the property bearing no. B1130, Third floor, Gharoli Diary Farm, Mayur Vihar, PhaseIII, Delhi (suit property). The plantiff has applied for electricity connection with the defendant no.1 at four instances i.e on 31.10.2019, 22.04.2021, 06.10.2021 and 24.03.2022, however, the same were rejected by the defendant no.1 and the plaintiff was told that electricity meter has already been issued/installed at the third floor in the name of Deepa Devi I.e defendant no. 2, who is the resident of fourth floor -- 1 of 5 -- in the suit property. The plaintiff seeks mandatory injunction for installation of electricity meter and in the present application plaintiff has sought the same relief. 3. The defendant no.1 has submitted as follows: Five electricity connections have already been installed in the suit property, which comprises of ground plus five floors. Although the defendant no.2 Deepa Devi is the resident of fourth floor, however, the billing address of the electricity meter of Deepa Devi is shown to be at third floor, wherein the plaintiff resides. The discrepancy in the billing address of Deepa Devi could not be rectified as there is another meter installed in the name of Ms. Sonia Dogra at the fourth floor, who is resident of fifth floor. Further, Ms. Sonia Dogra could not produce any documents with regard to ownership of fifth floor and the building has been illegally extended by the residents. Even if, the defendant no.1 were to correct the discrepancies in the addresses, a fresh electricity meter cannot installed at the third floor in the name of plaintiff for the reason that the objection list from MCD was received vide a letter bearing no. EE (B)I & II/SHS/202021/D1436, on 16.11.2020 by the defendant no.1 and as per the letter, unauthorized construction have been found by MCD at ground floor, first floor, second floor, third floor and fourth floor. In view of the same, the defendant no.1 cannot install the electricity connection unless and NOC from MCD is issued in respect of the property in compliance with regulation 10 of DERC (Supply Code and Performance Standards) -- 2 of 5 -- Regulations, 2017. The electricity connection already existing at various floors of the suit property were installed prior to receipt of MCD’s objection list. The defendant no.1 has relied on order of Hon’ble High Court of Delhi in ”Parivartan Foundation vs South Delhi Municipal Corporation & Ors”. 4. Submissions have already been heard. Record perused. 5. The plaintiff has sought interim mandatory injunction vide the present application. It is a settled proposition of law that the relief of interim mandatory injunction is to be granted in rare and exceptional cases. Reliance is placed upon the judgment of the Hon’ble Supreme Court of India, in the case titled as “Hammad Ahmed vs. Abdul Majeed & Ors.”, decided on 03.03.2019, wherein it has been held : 57. The ad interim mandatory injunction, is to be granted not at the asking but on strong circumstance so that to protect the rights and interest of the parties so as not to frustrate their rights regarding mandatory injunction. In Deoraj vs. State of Maharashtra and Others this Court held that Court would grant such an interim relief only if it is satisfied that withholding of it would prick the conscience of the Court and do violence to the sense of justice, resulting in injustice being perpetuated throughout the hearing, and at the end the Court would not be able to vindicate the cause of justice. Therefore, in appropriate case, ad-interim injunction in mandatory form can be granted. The Court held as under:- “12. Situations emerge where the granting of an interim relief would tantamount to granting the final relief itself. And then there may be converse cases where withholding of an interim -- 3 of 5 -- relief would tantamount to dismissal of the main petition itself; for, by the time the main matter comes up for hearing there would be nothing left to be allowed as relief to the petitioner though all the findings may be in his favour. In such cases the availability of a very strong prima facie case — of a standard much higher than just prima facie case, the considerations of balance of convenience and irreparable injury forcefully tilting the balance of the case totally in favour of the applicant may persuade the court to grant an interim relief though it amounts to granting the final relief itself. Of course, such would be rare and exceptional cases. The court would grant such an interim relief only if satisfied that withholding of it would prick the conscience of the court and do violence to the sense of justice, resulting in injustice being perpetuated throughout the hearing, and at the end the court would not be able to vindicate the cause of justice. Obviously such would be rare cases accompanied by compelling circumstances, where the injury complained of is immediate and pressing and would cause extreme hardship. The conduct of the parties shall also have to be seen and the court may put the parties on such terms as may be prudent.” 6. The suit property of the plaintiff has already been included in the objection list of the MCD for having unauthorized construction and the defendant no.1 has valid reasons for non issuance of electricity connection as per the requirement of law and regulations in this regard. There is no prima facie case in favour of the plaintiff. Further, the actions of the defendant no.1 are well within the regulations issued in respect of installation of new -- 4 of 5 -- electricity connections and hence, the balance of convenience also lies in favour of the defendant no.1. The plaintiff cannot insist upon issuance of electricity connection, once the property itself has been constructed contrary to the rules and regulations of MCD. Moreover, the relief sought by the plaintiff in the present application is similar to the final relief sought in the present suit and allowing the present application would itself tantamount to granting of final relief, without granting the parties to present evidence upon the merits of the case. The application is accordingly dismissed. Nothing expressed herein shall be expression upon the merits of the case. 7. It is further noticed that although the defendant no.1 has admitted that there are discrepancies in the issuance of electricity connections in the suit property due to wrong addresses and non furnishing of ownership documents, however, the defendant no.1 has not clarified as to what action has been taken in respect of the same. Defendant no.1 itself has stated that there is unauthorized construction in the suit property, however, it is also not explained as to why no remedial steps have been taken till date. Accordingly, defendant no.1 is directed to file status report in respect of action taken by it on the next date of hearing. Put up for PE and filing of status report on 22.08.2024. (VINOD JOSHI) ACJ-cum-CCJ-cum-ARC (East) KKD Courts, Delhi/20.05.2024 -- 5 of 5 --