Order Details: COPY OF JUDICIAL PROCEEDINGS
Pdf Text: CS DJ No.171/2026
Aditya Mohan Vs. The BSES Yamuna Power Ltd
24th February, 2026
Fresh suit received by way of assignment. It be checked and
registered.
Present: Sh. Praveen Yadav, ld. Counsel for plaintiff through
V.C.
1. Heard. Record perused.
2. Issue summons of the suit to the defendant through
all permissible modes, for NDOH.
3. Steps be taken within a week from today.
4. At this stage, Counsel for plaintiff has pressed for
ex-parte interim injunction stating that the plaintiff is a tenant in
the premises and running printing shop in the name of M/s.
Shalimar Offset Press, wherein electricity connection via CA No.
100081982 with sanctioned load of 25 KW (non domestic) is
installed. The plaintiff was regularly paying his electricity charges
as per the bill generated by BSES.
5. That on 08.12.2025, the officer of the defendant
visited the premises of the defendant for inspection; thereafter old
meter was taken and new meter was installed.
6. That later on, plaintiff received a message from the
meter testing lab of the defendant wherein no tampering was found
and the installed meter was found “OK”.
7. That to the surprise of the plaintiff, contrary to the
lab report, a theft bill/notice, via a speaking order was received by
the plaintiff in the month of January, 2026, with respect to the
inspection so carried out on 08.12.2025.
-- 1 of 2 --
8. Counsel for plaintiff stated that his energy
consumption details/charges have remained almost similar in each
month prior and subsequent to the inspection so carried out by the
defendant on 08.12.2025; inspection report was false, prepared by
the officials at their office; it does not even bear the signature of
the plaintiff; no opportunity of hearing was granted to him, and
now the defendant has issued a disconnection notice of the
electricity to their premises, and if the same is not stayed, it shall
gravely prejudice their livelihood and cause irreparable loss to
them.
9. In the given facts and circumstances, plaintiff is
directed to deposit 40% of billed amount/demand notice i.e. Rs.
5,68,068/- within a week from today, with the defendant, and
subject to deposit of the same within the time granted by the Court,
the defendant/BSES is thereby restrained to disconnect the
electricity connection at the premises of the plaintiff i.e. 2622,
Ground Floor, Kuchcha Chelan, Daryaganj, Delhi, till NDOH.
10. List the matter for consideration/completion of
pleadings and arguments on the application U/O. 39 R 1 & 2 CPC
r/w Sec. 151 CPC, on 30.03.2026.
11.
Copy of this order be given dasti to plaintiff, as
prayed for.
(ANIL ANTIL)
DISTRICT JUDGE-15/CENTRAL
DELHI/24.02.2026
-- 2 of 2 --