Full Order Text
Interim Order 1 · 24 Feb 2026 · CNR DLCT010033072026
Order Details: COPY OF JUDICIAL PROCEEDINGS Pdf Text: CS DJ No.171/2026 Aditya Mohan Vs. The BSES Yamuna Power Ltd 24th February, 2026 Fresh suit received by way of assignment. It be checked and registered. Present: Sh. Praveen Yadav, ld. Counsel for plaintiff through V.C. 1. Heard. Record perused. 2. Issue summons of the suit to the defendant through all permissible modes, for NDOH. 3. Steps be taken within a week from today. 4. At this stage, Counsel for plaintiff has pressed for ex-parte interim injunction stating that the plaintiff is a tenant in the premises and running printing shop in the name of M/s. Shalimar Offset Press, wherein electricity connection via CA No. 100081982 with sanctioned load of 25 KW (non domestic) is installed. The plaintiff was regularly paying his electricity charges as per the bill generated by BSES. 5. That on 08.12.2025, the officer of the defendant visited the premises of the defendant for inspection; thereafter old meter was taken and new meter was installed. 6. That later on, plaintiff received a message from the meter testing lab of the defendant wherein no tampering was found and the installed meter was found “OK”. 7. That to the surprise of the plaintiff, contrary to the lab report, a theft bill/notice, via a speaking order was received by the plaintiff in the month of January, 2026, with respect to the inspection so carried out on 08.12.2025. -- 1 of 2 -- 8. Counsel for plaintiff stated that his energy consumption details/charges have remained almost similar in each month prior and subsequent to the inspection so carried out by the defendant on 08.12.2025; inspection report was false, prepared by the officials at their office; it does not even bear the signature of the plaintiff; no opportunity of hearing was granted to him, and now the defendant has issued a disconnection notice of the electricity to their premises, and if the same is not stayed, it shall gravely prejudice their livelihood and cause irreparable loss to them. 9. In the given facts and circumstances, plaintiff is directed to deposit 40% of billed amount/demand notice i.e. Rs. 5,68,068/- within a week from today, with the defendant, and subject to deposit of the same within the time granted by the Court, the defendant/BSES is thereby restrained to disconnect the electricity connection at the premises of the plaintiff i.e. 2622, Ground Floor, Kuchcha Chelan, Daryaganj, Delhi, till NDOH. 10. List the matter for consideration/completion of pleadings and arguments on the application U/O. 39 R 1 & 2 CPC r/w Sec. 151 CPC, on 30.03.2026. 11. Copy of this order be given dasti to plaintiff, as prayed for. (ANIL ANTIL) DISTRICT JUDGE-15/CENTRAL DELHI/24.02.2026 -- 2 of 2 --
